RESUME
Full Name: Mohd Kabri Salleh@Yong
Date of Birth: June 25th 1963
Nationality / Race / Religion: Malaysian / Malay / Muslim.
Age: 53
Marital Status: Married
Permanent Home Address: Or Currant Address :
Lot 12 A Kpg. Gong Bukit Kenak., No.202 Block F6
Jerteh, Besut, Wangsa Maju Section 2
22000 Terengganu. 53300 Kuala Lumpur
West Malaysia Wilayah Persekutuan
. West Malaysia
Email-Address ************@*****.***
Contact Number (a) +6014 – 2125733 (b) +6011 – 20878784
2.0ACADEMIC & TECHNICAL QUALIFICATIONS
Sijil Pelajaran Malaysia (SPM) 1980
Sekolah Menengah Clifford Kuala Kangsar, Perak West Malaysia.
Certificate In Refrigeration & Air Conditioning (1987)
Institute Technology Industries (M) Gong Badak, Kuala Terengganu,Terengganu West Malaysia.
UKAS Personal Certification BINDT Level 11.
PCN Level 11 (PCN No. 300384) Valid: 22. 06. 2016
3.0QUALITY & OTHER TECHNICAL COURSES & SEMINARS ATTENDED
Inspection & Test Plan
Project Quality Plan
Quality Control Procedures
Material Handling, Storage & surplus Management (CS & CRA Materials)
Internal Quality Audit (ISO 9001: 2000)
WPS, WQT & WPQT Requirements (CS & CRA Materials)
Welding of Exotic (CRA) Material (SS,DSS, Super DSS, Incoloy, Copper Nickle, Titanium etc)
Quality Management System
4.0HSE Related COURSES & SEMINARS ATTENDED
Basic Offshore Survival Certificate No. : BEBS453026/09 Valid until 18th November 2012
Basic Offshore Induction
Working at Height - Scaffolding Erection & Dismantling
Rigging & Slinging
Offshore Confined Space
Offshore Breathing Apparatus & Fire Fighting
Accident, Incident & Near Miss Investigation
PETRONAS OFFSHORE SAFETY PASSPORT A
MEDICAL Exp.: 02-09-2018 SAFETY Trg. Exp.: 18-11-2012.
Blood Group: AB+
NIOSH - 0SFAM SAFETY PASSPORT SICW(NOSP)
CARD NO. : W029510J11
CIDB CONSTRUCTION INDUSTRI DEVELOPMENT BOARD MALAYSIA
CARD NO. : T21060620010001
5.0COMPUTER LITERACY
Microsoft Words, Excel, Power Point, etc.
Automated Excel for QC Records Compilation
6.0 EMPLOYMENT HISTORY
Present Working at TTP Fabricator Sdn.Bhd.
Employer : Enersea Resources Sdn. Bhd.
Position : Qc Piping
Project : Petronas Rapid Project Package 14 (801 & 803) – Utilities, Interconnecting Offsite Units
Client : PRPC Utilities And Facilities Sdn. Bhd.
6.2 April 2015 – Mac 2016
Employer : Prestine Potential Sdn. Bhd.
Position : QC Piping Production
Project : TECHNIP - MMHE JOINT VENTURE TLP MALIKAI DEEPWATER PROJECT
Client : SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM Co Ltd.
Project Involve & Executed
Conduct Quality Control Surveillance & Inspection of meeting drawing, specific, PQP and ITP requirements during installation and piping line assembly.
Liaise with NDT Coordinator on NDT take off.
Coordinate & follow up NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Review Hydro-test Packs; provide QC & NDT Clearance including confirmation on material traceability.
Involve all assembly of piping at the site again the flange face, flange alignment, gasket, bolt & nut are follow the drawing
Conduct bolt tightening, flange management and line check prior hydro-test & re-instatement test witness together with client.
Witness hydro-test & re-instatement test for piping and the related components on the line.
Compile all QC related documents for readiness on Final Doc Compilation.
Attend daily QAQC & NDT progress meeting
Liaise with PMT and Project Engineer on issues associated with project site changes
6.3 Mac 2013- Mac 2015
Employer: Petrofac Engineering Services (Malaysia) Sdn. Bhd.
Position: Site QAQC Leader
Project : Engineering, Procurement, Construction and Commissioning (EPCC) Of UP Stream And Down Stream (UDTP) Theme Park Training Centre at Institute Technology Petroleum Petronas INSTEP Batu Rakit, Terengganu, West Malaysia, Malaysia
Client : Petronas Dagangan (M) Berhad.
Project Involve & Executed.
Attend every project meeting for updating all any issued of changing the schedule project plan or MTO change, NCR issued and also attend the project auditing with third party and client at site venue. (Main contractor & Sub Contractor).
Conduct the project starting earth work execution of grouting foundation, related civil works preparation platform, fabrication of structure and piping, receiving materials traceability, storage and handling, installation works all of tank, structure, pipe bridges’, pipe rack and piping assembly starting mark and cut, erection and installation related facilities, installation electrical and instruments facilities and mechanicals equipment. Pre Commissioning, testing and commissioning. Make sure the works done are follow the PQP,ITP, NDE,WPS, by Client Standard Procedure (AWS,ASME,ASTM,API,IEEE, ext’s) and regulation (Pts) and meet of all project drawing and specification that base of the contract documentation agreement needs.
Lead of any issue again the Quality Control plan at site during the civil execution works, lifting works, fabrication works until installation, pre commission and commissioning works was conducted are follow the up to date drawing also followed all the specification regulation needs and approved by client. All the works activity was done running smooth out of any safety issued during or before starting and make sure all the works done was documented, filling are approved and witness by client.
6.4 Dec 2010-Feb 2013
Employer: Petra Resources Sdn. Bhd.
Position: Quality Control & Welding Inspector
Client: Petronas Carigali (M) Berhad.
Projects Involved & Executed
Provision of HUC & Major Topside Maintenance Services 2012-2017
HUC of PCSB Facilities For TKJT-C & TKJP-C Launcher, Receiver & Chemical Injection Facilities 2010-2012
HUC of Additional Gas Well Facilities On Existing Golok-PA (GOPA And GOPB) Gas Production Platform for SK-309 Phase 1 Gas Development Project. Work Order No. MURPHY/P 10324-001
HUC for PCSB Facilities - Year 2007 – 2010.
HUC for PCSB - SKO Pipeline Rejuvenation Project
HUC for PCSB Development- ERB West Development Project Phase 1
HUC of Bokor Power Generation Up Grading
HUC Work - PL-357 & PL-363 SKO Pipeline Project. Work Order No. DFHD/2009/007.
Roles & Responsibilities
Conduct Quality Surveillance & Inspection meeting specific PQP and ITP requirements.
Liaise with NDT Coordinator on NDT take off.
Liaise with welding engineer & conduct new WPS
Coordinate & follow up on NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Conduct WQT as per the approved WPS requirement.
Review Hydro-test Packs; provide QC & NDT Clearance including confirmation on material traceability.
Involved in Off-shore campaign
Member of the Audit Team (Conduct Internal Audit as per the Project Quality Plan)
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test for piping, valve and others materials
Compile all QC related documents for readiness on Final Doc Compilation and produce the welder performance for all project implement.
Attend daily QAQC & NDT progress meeting
Liaise with Project Engineer on issues associated with site changes & red-line marking.
6.5 Nov 2009 – Nov 2010
Employer- Calidad Sdn. Bhd.
Position: Quality Control Inspector Cum Welding Inspector
Client: Petronas Carigali (M) Berhad
Project Involved & Executed
PCSB Sumandak Development
Roles & Responsibilities
Conduct Quality Surveillance & Inspection meeting specific PQP and ITP requirements.
Liaise with NDT Coordinator on NDT take off.
Liaise with welding engineer & conduct new WPS
Coordinate & follow up on NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Conduct WQT as per the approved WPS requirement.
Review Hydro-test Packs; provide QC & NDT Clearance including confirmation on material traceability.
Involved in Off-shore campaign
Member of the Audit Team (Conduct Internal Audit as per the Project Quality Plan)
Assist in E & I installation and the rectification of any NCR.
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test for piping, valve and others materials
Compile all QC related documents for readiness on Final Doc Compilation.
Attend daily QAQC & NDT progress meeting
Liaise with Project Engineer on issues associated with site changes & red-line marking.
6.6 Jan 2008 - Nov 2009
Employer: Boustead Heavy Industries Construction Petroleum (BHICP)
Position: Quality Control Supervisor
Client: Petronas Carigali (M) Berhad
Projects Involved & Executed
Muda Living Quarter for CPOC Petronas Carigali
Procurement, Fabrication, Testing, Load-out, Tie-Down, Offshore Hook up- And Commissioning Of Guntong-A Flare Boom (EMEPMI)
Roles & Responsibilities
Monitor and conduct QC at fabrication works meeting the PQP and ITP requirements.
Monitoring all Inspection request & follow up on fabrication work
Liaise with NDT Coordinator on NDT take off
Coordinate with Sub Contractor on fabrication works progress & follow up on NDT requirements
Liaise with other QC when any materials have to transfer from hanger to assembly place or from the storage place before fabrication.
Placing all the surplus material at storage area & produces an inventory
Liaise with dimensional surveyor on leveling, dimensional, straightness, squareness before & after welding work and review the report.
Coordinate with other QC on any repair work & follow on re-NDT after successful review by client QC
Produce & compile all associated inspection reports such as; MVR.FU, VIS & WIS and NDT report.
Monitor other QC inspector conducting WQT
Review Hydro-test Packages to provide QC & NDT Clearance including confirmation on material traceability.
Monitor all punch listing on line check prior to hydro-test & re-instatement test.
Monitor and conduct QC during flushing or hydro-test & re-instatement test.
Monitor all compile all related documents for readiness on Final Doc Compilation.
Monitoring architecture works; Hilly Deck, sea water system, fire alarm system, air conditioning and ventilation systems (HVAC), electrical appliances system and emergency light systems, door panel and internal partition accessories installation, drainage system, sewerage system to ensure compliance with standard requirement.
6.7 Jan 2007 – Dec 2008
Employer: KENCANA TORSCO SDN.BHD.
Position: Structural & Piping Quality Control Cum. Welding Inspector
Project Involved & Executed:
Client: PROSAFE, Azurite FPDSO Project 379
Roles & Responsibilities:
Conduct Quality Control Surveillance & Inspection of meeting specific PQP and ITP requirements.
Liaise with NDT Coordinator on NDT take off.
Coordinate & follow up NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Review Hydro-test Packs; provide QC & NDT Clearance including confirmation on material traceability.
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test for piping and its related components
Compile all QC relate documents for readiness on Final Doc Compilation.
Attend daily QAQC & NDT progress meeting
Liaise with Project Engineer on issues associated with project site changes
6.8 Jan 2006 – Jan 2007
Employer: KENCANA PETROLEUM SDN.BHD
Position: (Structural &Piping) Quality Control & Welding Inspector
Project Involved & Executed: MAARI Field Development Wellhead Platform (CLOUGH)
Roles & Responsibilities:
Conduct Quality Surveillance & Inspection of meeting specific PQP and ITP requirements.
Liaise with NDT Coordinator on NDT take off.
Liaise with welding engineer & conduct new WPS
Coordinate & follow up PWHT, NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Conduct WQT as per the approved WPS requirement.
Review Hydro-test Packs; provide QC & NDT Clearance including confirmation on material traceability.
Member of the Audit Team-(Conduct Internal Audit as per the Project Quality Plan)
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test of piping, valve and all related components
Compile all QC relate documents for readiness on Final Doc Compilation.
Attend daily QAQC & NDT progress meeting
Liaise with Project Engineer on issues associated with project site changes
6.9 Jan 2005 – Dec 2006
EMPLOYER: GLOBAL FABRICATIONS SDN.BHD.
Position: Quality Control Inspector for (Piping & Mechanical)
Project Involved & Executed:
Cendor Field Development MOPU Conversion, PETROFAC, PM-304)
Duties & Responsibilities:
Conduct the tank leak test, liaise with the welder supervisor any repair works and carried out the inspection with client inspector.
Verify material / pipe fitting used as per specification.
Ensure fabricate / installation of pipe spools as per latest ISO metric drawing.
Carried out line check and punch listing together client inspector and main contractor inspector.
Compilation of QC document and test record.
Witnessed hydro-test / flushing as per specification.
To review mechanical drawing such as lay out drawing, P & ID and Vendor drawing.
Liaised with material Inspector for mechanical equipment inspection during receiving.
Review all equipment documents such as manufacturing data reports and mill certificates as per manufacturer’s recommendation and client requirement.
Carry out material verification, fit-up and visual inspection for equipment foundation as per specification and procedure.
Liaised with dimensional surveyor and mechanical supervisor for levelness, position, alignment, verticality and orientation during equipment installation.
Monitoring and record for pre and final coupling alignment for pumps.
Monitoring and record for hydro test and leak test for mechanical equipment.
To perform mechanical check sheet and punch list for mechanical equipment.
NDT examination, to prepare NDT request, arrange NDT examination (DPI, MPI, UT, and RT). Reviewed NDT report and update NDT status.
Produce and control QC inspection report for final documentation.
6.10 Jan 2004 – Dec 2005
EMPLOYER: GLOBAL FABRICATION SDN.BHD.
Position: Quality Control Inspector for (Piping)
Project Involved & Executed:
Fabrication Pre-Commissioning and Load-Out of the Cliff Head ‘A’
Platform (ROC OIL (WA) PTY. LTD)
Duties & Responsibilities:
Verify material such as pipe, fitting use as per specification.
Carried out inspection such as MVR, FIT UP and Visual and update weld summary.
Review piping drawing such as ISO and P & ID drawing.
To check that welding consumable meet the specification and proper storage and treaded as specified by manufacturer’s guide line and WPS.
Verify piping materials with reference to detail and ISO drawing.
To carried out natural verification inspection, fit up and visual inspection and review all the report.
To ensure welding is perform as per WPS.
To ensure fabrication and erection of piping as per ISO and P & ID drawing.
Liaised with NDT coordinator for NDT request and arrange the NDT activities line check and punch list for piping system as per ISO drawing and P & ID.
Monitoring and record for hydrostatic testing for piping system and valve leak test as per specification.
Produce and control all QC inspection report (weld summary) for final documentation.
Carried out line check and punch killing.
Witnessed hydro-test / flushing activities for various Inspection activities and conduct Boroscopic check.
6.11 June 2003 – Jan 2004
EMPLOYER: EORICH
Position: Quality Control Inspector for (Piping)
Project Involved & Executed:
Construction of Offshore Patrol Vessel (Royal Malaysian Navy)
Duties & Responsibilities:
Conduct Quality Surveillance
Liaise with NDT Coordinator on NDT take off.
Coordinate & follow up NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Conduct WQT as per the approved WPS requirement.
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test of piping, valve and all related components
Compile all QC relate documents for readiness on Final Doc Compilation.
Attend daily Project progress meeting
Liaise with Project Engineer on issues associated with project site changes
6.12 Jan 2003 –June 2003
EMPLOYER: SONG HENG ENGINEERING SDN.BHD.
Position: Quality Control Inspector
(Piping & Structural)
Project Involved & Executed
Post PANAMA Crane for Pelabuhan Tanjung Pelepas
(Under IMPSA (M) Sdn. Bhd)
Duties & Responsibilities:
Conduct thickness gauging, check dimension and edge preparation of the Butt and Fillet Weld to ensure compliance with the drawing and report.
To confirm CF-MICC certificates complies with the drawing requirement.
To update the inspection status and submit inspection request to client.
Update the UT / MPI joint on every joints & ensure compliance with the drawing requirement.
Carry out dimension and alignment inspection & ensure compliance with the drawing requirement.
To confirm the pressure gauge calibration date and carried out the leak test (soap application on the weldment to detect for leak).
6.13 Jan 2002 – Dec 2002
EMPLOYER- GLOBAL NEXUS L
Position: Quality Control Inspector for (Piping)
Project Involved & Executed:
Resak Compressor Module 1, 2, & 3 (Petronas Carigali Sdn Bhd)
Duties & Responsibilities:
Conduct Quality Surveillance during mark cut and Fit – Up are follow the drawing, and procedure during welding work are follow WPS
Liaise with NDT Coordinator on NDT take off.
Coordinate & follow up NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Conduct WQT as per the approved WPS requirement.
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test of piping, valve and all related components
Compile all QC relate documents for readiness on Final Doc Compilation.
Attend daily Project progress meeting
Liaise with Project Engineer on issues associated with project site changes
6.14 Jan 2001 - Jan 2002
EMPLOYER: STERLING SUCCESS SDN.BHD.
Position: Quality Control Inspector for (Piping)
Project : Involved & Executed
Cakerawala Gas Field Development Project
Duties & Responsibilities:
Conduct Quality Surveillance & Inspection meeting specific PQP and ITP requirements.
Liaise with NDT Coordinator on NDT take off.
Liaise with welding engineer & conduct new WPS
Coordinate & follow up on NDT and Dimensional requirements.
Coordinate repair work & follow on re-NDT
Produce & compile all associated inspection reports such as; MIR, MVR, FU, VIS & WIS.
Conduct WQT as per the approved WPS requirement.
Review Hydro-test Packs; provide QC & NDT Clearance including confirmation on material traceability.
Involved in Off-shore campaign
Member of the Audit Team (Conduct Internal Audit as per the Project Quality Plan)
Conduct line check prior hydro-test & re-instatement test.
Witness hydro-test & re-instatement test for piping, valve and others materials
Compile all QC related documents for readiness on Final Doc Compilation.
Attend daily QAQC & NDT progress meeting
Liaise with Project Engineer on issues associated with site changes & red-line marking.
6.15 Jun 2000 – Dec 2001
EMPLOYER- ABB INDUSTRIAL BUILDING SYSTEM SDN.BHD.
Position : E&I (QC Supervisor)
Client: Petronas Penapisan (M) Berhad.
Project : KR2 Petronas Project, Paka, Terengganu
Duties & Responsibilities:
Supervised, monitor and QC coordination on work involved in fabrication, installation, testing work and commissioning for electrical accessories, equipments support and electrical equipments. This involved cable ladder installation, cable pulling, installation of electrical, instrumentation equipment and finally to testing commissioning.
To ensure all parts and equipment at site is meet the specification and installation is done according to the installation drawing and procedure.
To work together with client to ensure all parts and equipment are following client specification and regulation standard.
Checking and identify the quality, measurement and quality of conditions all the materials and equipments at the plant area.
Compile the report
6.16 Jan 1999 – Jun 2000
EMPLOYER: PARAS SAKSAMA SDN.BHD.
Position: QC Supervisor/ QS (E&I)
Client: Petronas Penapisan (M) Berhad.
Project: KR2 Petronas, Paka, Terengganu
Duties & Responsibilities
Supervised, monitor and QC coordination on work involved in fabrication, installation, testing work and commissioning for electrical accessories, equipments support and electrical equipments. This involved cable ladder installation, cable pulling, installation of electrical and instrumentation equipment and finally to testing commissioning.
To ensure all parts and equipment at site is meet the specification and installation is done according to the installation drawing and procedure.
To work together with client to ensure all parts and equipment are following client specification and regulation standard.
Checking and identify the quality, measurement and quality of conditions all the material and equipment at the plant area.
Compile the report
6.17 Jan 1998 – Jan 1999
EMPLOYER: PARAS SAKSAMA SDN.BHD. KEMAMAN, TERENGGANU
Position: E&I QC Supervisor
Client: Petronas Penapisan (M) Berhad.
Project: Involved & executed
GPP 1 and Petronas Penapisan, Paka, Terengganu
Duties & Responsibilities:
Identify and control the testing and commissioning works of all QC personal at site
Check all materials and equipment to ensure drawing and specs compliance
Compile report summary
6.18 Jan 1997 – Jan 1998
EMPLOYER: KOLEKSI 786 SDN.BHD. KEMAMAN, TERENGGANU
Position: Foreman
Project Involved & executed:
Tioxe Factory (M) Bhd. Teluk Kalung, Kemaman, Terengganu
Duties & Responsibilities:
Supervising & coordinating general worker doing the grouting foundation and other related civil work.
References:
Mr Abd. Wahap Hairanie
**********.********@*******.***.**
Shafaril Izzuddin
********.********@*************.***