Post Job Free
Sign in

Project Quality

Location:
San Francisco, CA
Salary:
125000
Posted:
July 28, 2017

Contact this candidate

Resume:

Jyotishman Nath

Contact: (M) +1-415-***-****, email: ***************@*****.***,

Address : ** ***** **, *** ***, Union City, CA - 94587

HIGHLIGHTS

SAP Functional and consulting experience of 10+ years with 2 years in PM and 5 years in Quality Management module and total experience of 13 years

Played key roles in 4 Implementation Projects and one Roll Out including client facing roles in with different accounts across California (across PM, QM and PP)

Rich domain experience of 3 years in managing factory shop floor operations as a production in charge

Bachelor degree in Mechanical Engineering from Gauhati University, Jalukbari, Assam, India

Possess a valid working visa H1 B (US Visa)

WORK EXPERIENCE

Project 1 :

Client : Pacific Gas and Electric Company; San Francisco; Duration: 14 months (current assignment on enhancements and Projects in the area of SAP Plant Maintenence)

Onsite team member in the Electric Line of Business.

For Projects – Responsible in attending Workshops during the Plan/ Analyze phase and understanding the Business AS IS Process and discuss regarding the TO BE Processes. Responsible in shaping the business requirements into system requirements followed by design and build. Conduct IT testing and UAT sessions with business for successful delivery. Presently working in the SAP Plant Maintenance Area providing customized solution to the business in the areas of PM Notification, PM Orders, PM Configurations

For Enhancements -

Responsible in understanding the business requirements and translate in SAP. The business submits requests in online ticketing system which flows through the IT team. Prepare estimates for the enhancement and get the necessary approvals from business and governance team for the approved funding. Preparation of Design and getting required approvals, Supporting development team for the enhancement. Performing IT Testing and conducting UAT sessions and there necessary approvals. Post GoLive support during Stabilization week for major releases. The enhancements are mostly in the areas of SAP Plant Maintenance in the area of PM Notifications and PM Orders

Project 2 :

Client: Southern California Edison; Los Angeles; Duration : 6 months ( Implementation )

FAS Implementation Project: Role as Onsite Coordinator.

100% Customized solution is provided to include many of their modules related to the Facilities Management System. Responsibilities include attending Workshops and understanding business processes and translating requirements into system requirements. Review of Functional Specs, supporting development team in offshore . Conducting Onsite-offshore status meetings and issue discussions. Conducting UAT sessions and getting business approvals and sign offs

Project 3 :

Client: Baker Hughes; Location in Houston and Bangalore; Duration : 36 months

Implementation project: Business requirement is to build customized solution and migrate Audit Management Systems (AMS) and Certificate Management Systems (CMS) to SAP platform creating a customized application Quality Management Systems (QMS).

Played a key role in the Data Migration which include preparing functional specs and data modelling, data mapping from documentum system, propose and implement TO BE process, preparing test cases and conduct testing, storing test scripts in HPQC system

Support Project: L2 support which includes resolution of defects and incidents and provide knowledge documents to the users: Preparing training documentation for the users in the area of: Inspection types and when these are triggered; how to correct inspection lot errors when the lot is not released and having the status as CRTD; How to generate the Quality Certificates; Procedure when an inspection lot is Auto UD; how to maintain Inspection Plans; How to do the results recording etc

Project 4 :

Client : Sun Chemical, Duration : 9 months

Enhancements and Support: Creating a customized solution in process inspection during manufacturing. Setting up of QM master data like creating Inspection Characteristics, Class, Inspection Plans, Material Specification, Inspection setup in material master for a material etc. Basic QM configurations – Create catalogs, Plant level settings, version management. Issues related to Inspection lots, results recording, Usage Decision etc.

Project 5 :

Client : Sigma Aldrich GSC Implementation; Duration : 12 months

Creation of Functional Specs for BDC programs, master data tools for roll outs. Successfully handled all the testing phases of the project. Coordinated the defect resolution activities within the project.

Handled the following QM areas: COA Profiles and Quality Certificates. Master data and issues related to Inspection lots, results recording, Usage Decision etc.

Company : Patni Computers Limited, Navi Mumbai, India

Duration : January 2007 – August 2009 (30 months)

Designation : SAP Functional Analyst

Project 6:

Client: Rohm and Haas Inc.; Duration : 30 months (Support)

Providing support in the PP and QM Area; Solving How Tos, Break fix issues

Handling issues related to integration with different modules: QM-SD, QM-PP, PP-FI, QM-MM and PP-MM integration

Company : ICON Household Products Pvt. Ltd., Guwahati

Duration : November 2005 – May 2006 (6 months)

Designation: Production In Charge – Production Department

Mainly responsible for the team management, handling technical issues and Production and Quality Control, coordination with maintenance team for routine job, shut down planning, annual auditing and inspection, shift scheduling, procurement of material and spare parts, for the production area.

Lead a team of 8 supervisors and 42 Operators along with 200+ causal workers for carrying out the various production operations. The positional responsibility includes such as achieving the production target along quality standards, as per quality standards of Reckitt Benckiser group

Company : B.H Enterprise Pvt. Ltd., Guwahati

Duration : August 2002 – February 2005 (30 months)

Designation: Production In Charge – Production Department

Responsible for Production Control in handling of resources for manpower, machine and raw material availability, to achieve monthly production target. Arranging manpower for production and their control. Ensure production within quality standards. Coordinating with quality team in handling quality issues. GI of raw materials and preparing material return notes. Stock taking of raw materials and goods produced in the floor on monthly and yearly basis. Handling waste management in floor. Constantly monitoring in production operations to minimise losses and increasing productivity. Coordinating with maintenance team to minimise line leakages and day-to-day technical problems, preventive maintenance activities and shut down planning. Providing relevant documentation for ISO auditing.

Lead a team of 8 operators and 8 casual workers in carrying out the production operations.

EDUCATION

Year

Degree/Examination

Institute/University

Percentage

2001

B.E (Mechanical)

Guwahati University, Assam

69.33%

1997

Pre Degree Course (12th)

Assam Board

65.25%

1995

Secondary School (10th)

Don Bosco High School, Mangaldai

70.00%



Contact this candidate