Robert J. Cocco

Sr. Piping Designer

***** ****** *****

Scurry, Texas, 75158

Cell 469-***-****

E-mail: ac1hoh@r.postjobfree.com

EDUCATION:

ASSOC. DEGREE IN MECHANICAL ENG. FROM CANTON AG & TECH. CANTON, NEW YORK

EXPERIENCE SUMMARY:

30+ YRS AS A PIPING DRAFTSMAN, DESIGNER AND CHECKER. POSITIONS HELD: SQUAD BOSS, FIELD CORDINATOR, QA AND QC INSPECTOR. FIELD LIASION CORDINATOR, HYDROTEST CORDINATOR. PRE AND POST PUNCH OF PIPING SYSTEMS. DESIGN IN REFINERY, GAS PLANTS AND HYDRO PLANTS AND NUCLEAR PLANTS.

COMPUTER EXPERIENCE:

AUTOCAD REL. 6-2013 PIPING SOFTWARE INCLUDED PRO-PIPE, PRO-ISO, FLEXCAD, ADVANTAGE PIPE AND CADPIPE.

CADWORX REL.10, 11, 13, WITH ISO-GEN, ISO EXTRACTION AND 3-D CAD WORX EQUIPMENT LAYOUT. ECE CADWORX REL.14 CLASS COMPLETED 11-21-13.

WORK HISTORY:

5-14 TO 12-16 DPI, HOUSTON,TX

SR. PIPING DESIGNER, LAYOUT OF NEW GAS PLANT FOR ANADARKO

IN WEST TEXAS. CREATED PLANS,SECTIONS AND 3D MODEL. DESIGN

OF 3D EQUIPMENT AND ISO,S. ALL WORK DONE ON 3D CADWORX.

7-13 TO 5-14 TIDE LLC, HOUSTON, TX

REFINERY TURN AROUND (FIELD ASSIGNMENT) IN GREAT FALLS,

MT. JOB REQUIRED FIELD MEASUREMENTS PLANS AND SECTIONS AND ISO'S DONE ON AUTOCAD REL. 11.

10-12 TO 6-13 AZOTA,LTD, HOUSTION,TX

SR. PIPING DESIGNER AND CORDINATOR ASSIGNED TO DCP MIDSTREAM PLANT ( FIELD ASSIGNMENT) IN THE SHALE FIELD AT EDNA, TEXAS. DESIGN OF VENT HDR AND TAIL PIPES FROM PSV AND COMPRESSORS. CORDINATED WITH FIELD WELDERS AND FITTERS ON INSTALLING NEW EQUIPMENT AND PIPE AND INSTRUMENT LOCATIONS AND INCORPORATED CLIENT DESIGN CHANGES.

3-12 TO 10-12 S-CON ENGINEERING & CONSTRUCTION, BRYAN, TX

DESIGN OF TWO PROCESS SKIDS. ALL EQUIPMENT, PIPING, SUPPORTS

AND INSTRUMENT LOCATIONS. AL L WORK DONE ON 3-D CADWORX 11. DESIGN OF CRYO SKID ALL LINES FROM SKID TO NEW PIPE RACK.

.

6-11 TO 3-12 DCP MIDSTREAM,MIDLAND, TX

SR. PIPING DESIGNER LAYOUT OF TRANSFER AND BOOSTER TURBINE

PUMPS AND ALL RELATED PIPING AND SUPPORTS. FIELD

MEASUREMENTS REQUIRED. DESIGN DONE ON CADWORX REL. 12.

12-10 TO 6-11 APPLIED CONSULTANT, DALLAS,

SR. PIPING DESIGNER ( FIELD ASSIGNMENT) AS-BUILT EXISTING P & ID'S FOR PIONEER GAS PLANTS. ALL WORK DONE ON AUTO CAD REL. 11.

12-08 TO 12-10 GBB BIOSCIENCE, HOUSTON TX.

DESIGN AND LAYOUT OF A CLORINE SUPER HEATER AND ALL

ASSOC PIPING, ALSO DESIGN OF A 150# STEAM BOILER AND ALL

(EXISTING TIE-INS.) WORK DONE ON AUTO CAD REL.10

1-08 TO 12-08 HARRIS GROUP, DALLAS TX

DESIGN OF ETHANOL BLENDING FOR REG.,PREM. & PLUS GRADES

OF GASOLINE DETAIL LAYOUT OF TRUCK UNLOADING AND SUPPLY FROM

STORAGE TANKS AND LAYOUT OF BLENDING SKIDS FOR ALL LOADING

ARMS, FOR (3) MOTIVA SITES. ALL WORK DONE ON 3D CADWORX REL. 8

6-06 TO 12-07 HOLLOMAN ENG.& CONST., HOUSTON, TEXAS

SR. PIPING DESIGNER FOR GAS PLANTS. DESIGN OF ALL LINES TO & FROM INLET & RESUIDE COMPRESSORS, ROUTING OF LINE TO & FROM GENERATORS, STORAGE TANKS, GYLOCL SKIDS, AMINE SKIDS AND CONTACTORS. PIPING OF HEATERS, B-TEX UNITS, ROUTING OF FLARE LINES TO KNOCK-OUT DRUM AND TO THE FLARE ALL UTILITIES PIPING, UNDERGROUND AND ABOVE. ALL

PLANS AND SECTIONS AND ISOMETRICS DONE MANUALLY. CLIENT WAS EMBRIDGE AND EGALE ROCK AS PLANTS

05-04 TO 06-06 VOUGHT AEROSPACE, DALLAS, TEXAS

STRUCTURAL ENGINEER ON GULFSTREAM IV & V. MODS.

06-98 TO 5-04 MUSTANG ENGINEERING, HOUSTON, TEXAS

VALERO REFINERY, FIELD ASSIGNMENT (MTBE UPGRADE) ST. CROIX VI FOR HOVENSA PIPING PUNCH OUT OF OFFSITE LINES TO NEW COKER UNIT, SULFER UNIT, AND DD7, ALSO ON BURN REBUILD TEAM OF VAC UNIT, DESIGN OF NEW PIPING ISO’S AND INSPECTION. (FIELD ASSIGNMENT IN LITHUANIA) TIE –INS FOR A NEW ALKY UNIT,

AND A NEW COMPRESSOR BUILDING, (FIELD ASSIGNMENT IN ARUBA FOR COASTAL REFINERY). ALL TIE-INS, PIPE ROUTES FOR NEW COKER UNIT. DEBOTTLE NECK EXISTING CRUDE UNIT AND ALL TIE-INS AND PIPE ROUTES TO NEW DESALTER PLANT.

01-98 TO 6-98 AMOCO MADAN REFINERY,MANDAN,ND

LAYOUT OF BLENDING PUMPS AND TRANSFER PUMPS, AND ALL PIPING AND INSTRUMENTS CONN.ALL WORK DONE ON AUTOCAD. REL 6 AND DETAIL FIELD MEASUREMENTS.

08-97 TO 01-98 JACOBS ENG. HOUSTON, TX CHEMICAL PLANT, JOLIET, IL

(FIELD ASSIGNMENT) SETTING AND ROUTING ALL STEAM AND CONDENSATE MANIFOLD LINES.

05-97 TO 08-97 CBS ENGINEERING, HOUSTON, TEXAS

AUX. PLATFORM AND INTERCONNECT RACK LAYOUT ON AUTOCAD REL. 13. FLEXCAD AND CHECKING OF PRODUCTION PLATFORM FOR BP PROJECT.

12-96 TO 05-97 MUSTANG ENGINEERING, HOUSTON, TX.

(FIELD ASSIGNMENT IN ARUBA FOR COASTAL REFINERY) ALL TIE- IN AND PIPE ROUTES FROM OSBL TO NEW HYDRTREATER BATTERY LIMITS. LAYOUT OF NEW AMINE LINES, AND NEW CRUDE EXCHANGERS. ALL TIE-INS AND PIPING ISO’S.

02-95 TO 12-96 FISH ENGINEERING, HOUSTON, TEXAS

RELOCATION OF EXISTING AMONIA PLANT FROM SICILY, ITALY TO BRANDON CANADA. ALL LAYOUT DONE ON AUTOCAD REL.12. FLEXCAD. NEW PIPING FOR NEW AMONIA PLANT. (FIELD ASSIGNMENT) FOR TIE-INS LOCATIONS IN BRANDON CANADA PLANT

01-92 TO 01-95 LITWIN ENGINEERING, HOUSTON, TEXAS

(FIELD ASSIGNMENT IN ST. CROIX HESS REFINERY) SQUAD BOSS IN QC DEPT. SUPERVISION ON ALL (NDE) FOR SW AND FW FOR ALL UNITS. ALSO ALL WELD MAPPING, FOR ALL NEW EQUIPMENT FOR A M.T.B.E. PLANT.

LTV ENGINEERING, DALLAS TEXAS

02-86 TO 01-92 WORKED AS A STRUCTURAL ENGINEER ON A (STEALTH PROGRAM)

06-84 TO 01-86 LOS ALAMOS ENG. LOS ALAMO NM

DETAIL DESIGN OF PLANTUUM PROCESS FOR ROCKY FLATS PLANT,

FOR (D.O.E CLASSIFIED PROGRAM)

06-83 TO 06-84 BECHTEL NUCLEAR DIVISION. SAGINAW,MI

FIELD ASSIGNMENT FOR SAGINAW NUCLEAR PLANT DRAWING OF ISO’S FOR FIELD RUN LINES.

01-81 TO 06-83 ARABIAN BECHTEL CO. JUBAL, SAUDIA ARABIA

SUPERVISION FOR ALL CANTRACT PACKAGES CONCERNING ROADS, RAILROADS AND RIGHT OF WAY. CONCEPTUAL AND DETAILED DESIGN FOR MAJOR INDUSTRIES PRODUCT AND FEED STOCK FLOW LINES. IMPLEMENT AND FOLLOW UP ON JOBSITE THRU CONSTRUCTION FOR THE ROYAL COMMISSION CONTRACTS.

05-80 TO 12-80 BECHTEL HOUSTON,TX

SR. PIPING DESIGNER,LAYOUT OF EXTRUDER BUILDING AND ALL ASSOC PIPING FOR MODELING OF UNIT.

05-76 TO 05-80 FISH ENG. HOUSTON,TX

PIPING DESIGNER- DRAWING PLANS, SECTIONS AND ISO’S FOR VARIOUS PROJECTS.

06-74 TO 04-76 FOSTER WHEELER, LIVINGSTON, NJ.

RIP WEAVER PIPING DESIGN SCHOOL, P&ID DRAFTSMAN.



Contact this candidate