Post Job Free
Sign in

Sr. Piping Designer

Location:
Charlotte, NC
Posted:
July 25, 2017

Contact this candidate

Resume:

*

RANDY W MORGAN

Sr. Piping Designer

** ***** ** **********

Industry Experience:

• PDS 3D Piping and Layout

• PDS 3D Equipment Modeler

• Microstation Plant Space 3D

• Field Engineering, Testing, and Commissioning

• Smart Plant 3D Review and NavisWorks

• Pipe Support Modeler for PDS

• LFM Scan w/PDS interface, Field Engineering and Commissioning

• Isogen created isometric generation

• Civil underground sloped pipe and equipment

• Plot Plans, Sections, & Elevations,

• HVAC Layout and Fabrication

• AutoCAD 16 and AutoCAD Rebis 3D

• Plans, develops, coordinates and reviews engineering work within the piping discipline for the Oil & Gas or Power industries.

• Communicates complex technical issues and recommends solutions to upper management.

• Good knowledge of systems, calculations, equipment, applications of methods, plant layout, and materials for preparation of project deliverables within the discipline and technical issues related to selection of design features within the discipline.

• Good knowledge of engineering work planning, control methods, construction practices, industry/regulatory codes and standards, design criteria pertinent to the discipline, and administrative practices.

Education:

Society of Piping Engineers and Designers (SPED) PDS I & II. 2

Certificate of Technology in Computer Aided Drafting and Design. The Bentley Institute for Microstation Triforma and Plant Space Design Series. Bechtel’s Employee University Learning Program

Landmark Forum.

Last Five Years of Responsibilities have included: CB&I, Charlotte NC:

Responsibilities included design and layout of New Energy Technology Power (NET Power) pilot plant. High pressure piping using Inconel Alloy, Stainless, Carbon, and Grayloc high pressure piping systems located in LaPorte TX. Other duties included field assignment for hydrotest certification, proposals, checking, plant layout, piping and mechanical routing of above ground and underground sloped pipe. Link: http://www.cbi.com/Who-We-Serve/Power/New-Technologies/NET-Power January 2015 - June 2017

WorleyParsons Engineering Consultancies Co. (WPECC): EPCM to design and construct PP13 and PP14 Two Twin 3x1 Combined Cycle Plants with a generating capacity of 1650 (mw) each for Saudi Electricity Company (SEC) near Riyadh, Saudi Arabia. Area Lead Designer responsible for steam layout and design of PP13 / PP14 Combined Cycle Plants. Coordinated work share and detail design reviews between US and Saudi offices using Citrix and SP3D design review.

Link:

http://www.worleyparsons.com/InvestorRelations/ASX/Pages/SaudiElectricityCompanycontractaward.as px

Saudi Arabia, June 2014 - December 2014

URS, Supervising Design Engineer (SDE):

Keyera - Rimbey Turbo Gas Plant

Duties included steam tracing piping layout and checking to further enhance recoveries of ethane and other natural gas liquids.

Link: http://www.plant.ca/sustainability/keyera-investing-210m-in-a-turbo-expander-for-rimbey-gas- plant-79462/

Denver, CO. December 2013 - June 2014

The Williams Fractionator & Terminal (Fast Track)

Responsible for new layout and design of process facility, tank storage, rail & truck terminals. Other duties included coordinating design effort through multiple URS offices for detail design, pipe support, commissioning, and mobilization. The fractionator plant typically receives a gas liquids stream consisting of 62% propane, 26% butane and 22% pentane.

Link: http://www.marcellus-shale.us/WV-gas-refineries.htm Denver, CO. November 2012 - December 2013

Jacobs:

ExxonMobil

Responsible for coordinating vessel replacement and associated piping at the Exxon POPCO OIL & GAS Processing Plant in Santa Barbara, CA. Model new equipment and pipe systems per ExxonMobil specifications utilizing LFM Scan interface with PDS. Link: http://www.sbcountyplanning.org/energy/projects/exxon.asp Denver, CO. May 2011 - November 2012

3

AMGEN Pharmaceutical

Field assignment responsible for field walk-downs, tie-ins, and manually sketched isometrics during construction of pharmaceutical expansion. Stainless steel tri-clover piping systems. Longmont, CO. May 2011 - November 2012

Before Last Five Years of Responsibilities have included: The Shaw Group:

AP1000 Nuclear Turbine Building Finalization Area Lead for EL.100’-0”. Area Piping Lead for process, steam, and utilities of large and small bore stainless or carbon steel sloped pipe.

Charlotte NC. January 2011 - May 2011

Westinghouse/Toshiba:

AP1000 Nuclear Power Plant Turbine Building

Responsible for equipment and piping layout for process, steam, and utilities of large and small bore stainless or carbon steel sloped pipe.

Cranberry TWP, PA. October 2009 - December 2010

Bechtel:

Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) Responsible for Plant Air layout and ISOGEN

Pueblo, CO. March 2009 - October 2009

URS:

Exxon Cold Freeze Project

Responsible for Cryogenic piping layout and design of 142’-0” tower skid design. Denver, CO. February 2008 - March 2009

THOR Integrated Waste Treatment Unit, Nuclear Waste. PDS Area Lead responsible for equipment layout, piping design, and Pelican Forge support layout. Coordinated work share and detail design efforts between US and Romania using Citrix. Denver, CO. September 2005 - February 2008

Intermech:

HVAC layout and fabrication for Hanford WTP Project. Area Lead responsibilities included layout and design checks for inhouse fabrication shop.

Richland, WA. January 2005 - July 2005

Bechtel:

1989 - 2005

Microstation Plant Space 3D Designer for Hanford WTP Project. Responsible for detailed pipe & equipment placement in the Pre-Treatment, Lab, and Balance of Facilities. Create 3D models, ISO’s, and plant layout drawings, Nuclear Waste. Microstation PDS Designer for Monsanto CT Argentina Project. Responsible for P&ID creation and 3D model reviews, Oil/Gas. Microstation PDS Designer for Camisea Project.

Responsible for P&ID creation and 3D model reviews, Oil/Gas. 4

Microstation PDS Designer for Reliance Project.

Responsible for P&ID creation and 3D model reviews, Oil/Gas PDS Designer for Pacrim Study. Responsible for P&ID creation, (Oil/Gas - Bechtel). Lead AutoCad Designer and 3D Model Operator for Lyondell-Citgo Refining Company Ltd. Responsible for P&ID creation, 3D model reviews, ISO creation, Field Walkdowns, and As-Builts. Lead AutoCad Designer for Georgia Gulf Project, OIL/GAS. Responsible for P&ID drafting.

Lead AutoCad Designer for Ethyl Chemical Revamp Project. Responsible for P&ID creation, Field Walkdowns and As-Builts, Petro/Chemical. Lead AutoCad Designer for Angus Chemical Company Revamp Project. Responsible for P&ID creation, Field Walkdowns, and As-Builts or Nitroglycerin Plant. Lead AutoCad Designer for Polysar Expansion Project. Responsible for P&ID drafting.

Lead AutoCad Designer for Small Projects Group, responsible for P&ID drafting. Contact:

Randy W Morgan

Cell: 509-***-****

Email: ac1hi6@r.postjobfree.com

Current Residence:

Charlotte, NC

Personal References:

Matt McNulty 980-***-**** (CB&I)

Robert Henderson 412-***-****(WTP, URS, WorleyParsons) Rich Ward 704-***-**** (Shaw, Toshiba)

Gordon McCoy 225-***-**** (CH2M)

Mark Posey 478-***-**** (URS)

Jason Mines 303-***-**** (URS)

Ron Peterson 843-***-**** (URS & CBI)

John Watson 205-***-**** (EPS LLC)

Terry Wallace 760-***-**** ((URS)

Paul Jahnke 281-***-**** (Bechtel)

On-Line References:

LinkedIn.com www.linkedin.com/in/randywmorgan



Contact this candidate