Post Job Free
Sign in

Equipment Project

Location:
Duri, Riau, Indonesia
Salary:
19 juta
Posted:
July 25, 2017

Contact this candidate

Resume:

*

CURRICULUM VITAE

*. N A M E : FRIZAL

*. PLACE DATE OF BIRTH : Pekanbaru October 14st, 1977

3. NATIONALITY : INDONESIAN

4. ADDRESS : Perumnas Tahap I KM 125

Jl.Tripatra 6 No.21

RT 03 RW 09

Kel. Balai makan Duri - RIAU

Cell Phone 081*********

5. EDUCATION : - SMU ( Physic )

- Balai Latihan Kerja ( BLKI ) Teknik Mesin / Automotive at Pekanbaru – RIAU.

6. LETTER OF APPRECIATION : 1. Staff of The Month for February 2009. By PT Kaliraya Sari

2. Appreciation of Zero Accident 1998 – 2003 by PT. Tripatra

3. Contribution to Achieve 10 MMHRS Without incident by PT. Tripatra.

4. Defensive Driver Recognition by PT. Rifansi

5. Thanks Award for Achievement by PT.

CPI,Rifansi,KalirayaSari,Rekayasa Industri.

6. Achievement SIFO ( Safe Injury Free Operation by PT. CPI)

7. Appreciation for high effort to accomplish new Petani Wash Tank By CPI

7. TRAINING

- Training “Petugas Pemeriksa dan Penguji / Teknisi Pesawat Angkat Dan Angkut” By KEMEN NAKER- RI

- Training“Ahli Muda K3 Konstruksi “ By KEMEN NAKER-RI

- Training Maintenance Heavy Equipment ( Bulldozer,Motor Grader And Excavator ) By CPI – Trakindo

- Training Leadership By CPI.

- Defensive Driver Course (DDC) Training by Tripatra Flour

- Smith System Training by Tripatra Flour

- Fundamental Safe Work Practice ( FSWP ) by PT. Chevron Pacific Indonesia

- Training Pipe fitter By Tripatra

2

- Elementary English Course by TEC

- Intermediate English Course by TEC

- Computer Course by LIPI Computer

- Training/Coutse of Automotive by BLKI Pekanbaru

8. LANGUAGE AND : Language Speaking Writing

PROFICIENCY IN EACH Indonesia Excellent Excellent

English Medium Medium

9. COUNTRIES OF WORK : INDONESIA

EXPERIENCE

EMPLOYMENT RECORD

Date : 23 FEB 2015 to 11 JULY 2017

Employer : PT. REKIND WORLEY PARSONS - PT. CPI

Position : Construction Equipment Operation Coordinator Responsibilities

• Managed,supervice and inspect PT.CPI Heavy,light and miscellaneous equipment for CPI Project ( Mechanical & Civil construction,road maintenance, waterways & etc ) about availability,utility,safety & etc of equipment.

• Roadside inspection for safety of all equipment Contractor

• Conduct verification and Validation repair and maintenance equipment by each contractor activity.

• Audit all equipment contactor

• Conduct pre-mobilization,inspection and reinspection for six month period of contractor equipment.

• Supervise all heavy, light and miscellaneous equipment .

• Analyse equipment and equipment permit needed by each Contractor.

• Make sure rental equipment will used by each contractor safe to operate at CPI Project.

• Equipment Safety Devices

• Control & Monitor equipment

• Pre-mob / inspection of equipment and tools

• Conduct of re-inspection 6 month period of equipment and tools

• Implement of company operational policies and procedure to ensure safety and productivities efficiency both manpower and equipment

• Familiar with PC in Microsoft application

• Direct responsible to equipment operation supervisor Date : 28 Jan 2014 to 23 FEB 2015

Employer : PT. SUMIGITA – INWHA CONSORTIUM WUR D – CHEVRON Position : Senior Supervisor Equipment

Responsibilities

• Managed of all type construction equipment (658 units).

• Supervise all heavy, light and miscellaneous equipment .

• Analyse equipment and equipment permit needed for support project. 3

• Ensures the effective working of the Permit to Work system

• Make sure rental equipment will used from Vendor safe to operate at CPI Project.

• Managed of back charge all equipment Rental.

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Pre-mob / inspection of equipment and tools with by REKIND WORLEY PARSONS

• Conduct of re-inspection 6 month period of equipment and tools

• Familiar with PC in Microsoft application

• Monitoring Fuel Usage all equipment

• Reports Activity directly to Superintendent

Date : 21 June 2013 till 28 Jan 2014

Employer : PT. TEGUH KARYA SEJAHTERA

Position : Superintendent Equipment

Responsibilities

• Managed of all type construction equipment (120 units).

• Supervise all heavy, light and miscellaneous equipment .

• Analyse equipment and equipment permit needed for support project.

• Ensures the effective working of the Permit to Work system

• Make sure rental equipment will used from Vendor safe to operate at CPI Project.

• Managed of back charge all equipment Rental.

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Pre-mob / inspection of equipment and tools with by Main Contractor and REKIND WORLEY PARSONS

• Conduct of re-inspection 6 month period of equipment and tools

• Familiar with PC in Microsoft application

• Monitoring Fuel Usage all equipment

• Reports Activity directly to the Project Manager Date : 14 Oct 2012 till 31May 2013

Employer : PT. BURI REKATAMA

Position : Senior Supervisor Equipment

Responsibilities

• Managed of all type construction equipment (86 units).

• Supervise all heavy, light and miscellaneous equipment .

• Analyse equipment and equipment permit needed for support project.

• Make sure rental equipment will used from Vendor safe to operate at CPI Project.

• Managed of back charge all equipment Rental.

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Pre-mob / inspection of equipment and tools with by Main Contractor and RW

• Conduct of re-inspection 6 month period of equipment and tools with by Main Contractor and RW

4

• Familiar with PC in Microsoft application

• Monitoring Fuel Usage all equipment

Date : 01 Jan 2010 till 14 Oct 2012

Employer : PT. RIFANSI DWI PUTRA

Position : Supervisor Equipment

Responsibilities

• Managed of all type construction equipment (114 units Cpi Equipment and 989 Units Equipment Rental).

• Supervise all heavy, light and miscellaneous equipment .

• Analyse equipment and equipment permit needed for support project.

• Make sure rental equipment will used from Vendor and CPI Equipment safe to operate at CPI Project.

• Managed of back charge all equipment Rental/CPI

• Reporting Backcharge CPI Equipment to TF CEM

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Pre-mob / inspection of equipment and tools with by TF CEM

• Conduct of re-inspection 6 month period of equipment and tools with TF CEM

• Familiar with PC in Microsoft application

• Monitoring Fuel Usage all equipment

Date : 12 Feb 2009 till 31 Des 2009

Employer : PT. KALIRAYA SARI

Position : Supervisor Equipment

Responsibilities

• Managed of all type construction equipment (07 units Cpi Equipment and 466 Units Equipment Rental).

• Supervise all heavy, light and miscellaneous equipment .

• Analyse equipment and equipment permit needed for support project.

• Make sure rental equipment will used from Vendor and CPI Equipment safe to operate at Project.

• Managed of back charge all equipment Rental/CPI

• Reporting Backcharge CPI Equipment to TF CEM

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Pre-mob / inspection of equipment and tools with by TF CEM

• Conduct of re-inspection 6 month period of equipment and tools with TF CEM

• Familiar with PC in Microsoft application

• Monitoring Fuel Usage all equipment

5

Date : 22 Oct 2008 till 12 Feb 2009

Employer : PT. WAHANAKARSA SWANDIRI

Position : Foreman Equipment

Responsibilities

• Monitoring and Inspect CPI equipment for support Rig Service and Rig Drilling

• Reporting Backcharge CPI Equipment to TF CEM

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Monitoring Fuel Usage all equipment.

Date : 29 Jan 2006 till 22 Oct 2008

Employer : PT. REKAYASA INDUSTRI

Position : Foreman Equipment

Responsibilities

• Monitoring and Inspect CPI equipment for support Rig Service and Rig Drilling

• Reporting Backcharge CPI Equipment to TF CEM

• Equipment Utilization

• Equipment Safety Devices

• Control & Monitor equipment

• Monitoring Fuel Usage all equipment

Date : Oct 1998 till Des 2005

Employer : PT. TRIPATRA ENGINEERS AND CONSTRUCTORS Position : Pipe Fitter I and II

Date : 1997 till Oct 1998

Employer : PT. INDAH KIAT PULP & PAPER

Position : Mechanic Automotive

Responsibilities

• Service and maintenance several types of machine such as : Isuzu Truck Logging, Forklif, Hong Yan Truck Logging etc.

• Reporting to Head Mechanic



Contact this candidate