Post Job Free
Sign in

Project Mechanical Engineer

Location:
Medan, North Sumatra, Indonesia
Salary:
IDR 16000000
Posted:
July 25, 2017

Contact this candidate

Resume:

NIMROD K SIREGAR

QA/QC INSPECTOR / Steel Structure & Piping/Mechanical

1of 7

Name : NIMROD KISRAN SIREGAR

Citizenship : Indonesia

Resident : North Sumatra - Indonesia

PC : Indonesia, English

ID No :1209202109750005

Date of Birth `: 21 - 09 – 1975

Mobile Phone No :+62-813-****-****

Email : ******.*******@*****.***

Education and Qualification:

Welding Inspector Certified B4T Bandung

Radiography Interpreter Certified (MSS – Surabaya ; periode 16 Nov – 22 Nov 2013)

Diploma in Mechanical Engineering (North Sumatera University) Safety Training:

Safety Training conduct by Wasco Engineering Indonesia (WEI) : Confined space Basic Fire Fighting (BFF) Basic First Aid (BFA) Emergency Reponce Team

Working at High

Safety Leadership

Safety Training conduct by Newmont Nusa Tenggara (NNT) Confined Space LOTO ( Look Out Take Out )

Work Management System (WMS)

Working at High Hazardous Material Safe Handling

Safety Leadership

Safety Training conduct by Hyundai Engineering & Construction (HDEC) : Confined Space LOTO ( Look Out Take Out

Working at High

Hazardous Material Safe Handling

Safety Leadership

Resume & Expertise

Objective:

Work with Sincerity, Commitment, hard work with Safety & Quality & Ensure the growth of the Organization along with Personal growth

Over 6 years’ experience in Structure & Piping, Mechanical construction for Oil & Gas, Power Station Project Work Experience :

HYUNDAI ENGINEERING & CONSTRUCTION Location : Desa Silangkitang Pahae - Taput North Sumatra.

Position : Mechanical Engineer ( Commissioning ).

Project Handle : SARULLA GEOTHERMAL POWER PLANT PROJECT

( Ormat Energy Conversion / OEC Technology).

May 9, 2016 –

May 8. 2017

NIMROD K SIREGAR

QA/QC INSPECTOR / Steel Structure & Piping/Mechanical 2of 7

Main Responsibility : Lube Oil Flushing, Lube Oil function Test, LP Steam pipe line check, Steam Blowing Assist, Fire Fiighting Clean Agent FM-200 Leak Test and etc.

Gathering Line Check, Monitoring and Control pH modification line system, Vibration Motor check, Monitoring and control STG condensate tank area. TIMAS SUPLINDO Location Project : OKI Baung South Sumatra Position : QC Mechanical ( Wood Handling Plant /WHP area.) Project Handle : OKI PULP & PAPER MILLS

Main Responsibility :

Review DP, HT, RT results.

QA/QC review before, during and inspection during pipe spools fabrication onshore.

Material receiving inspection, WPS, welder qualification, procedures, ITP and all QA/QC related documents.

Inspect and review weld/repair quality and Tightening Bolt, alligment quality.

Reporting & QA/QC documentation.

Area In Charge : Barge Storage, Chip Pile, Chipping Line, Gallery Building and all area in WHP (Wood Handling Plan Area).

January 14, 2016 –

April 13, 2016

Wasco Enfineering Indonesia ( WEI ), Location: Batam, Kepulauan Riau province, Indonesia.

QA/QC Inspector

: Kraken FPSO Project (POWERGEN MODULE / WARTSILA) &TOTAL E&P ANGOLA BLOCK 32

(KAOMBO)

13 July 2014 To 13

July 2015

Wasco Engineering Indonesia - Location: Batam – Kepulauan Riau, Indonesia QA/QC Inspector

Kraken FPSO Project (POWERGEN MODULE / WARTSILA) Project Main Responsibility:

Incoming material review base on Mills certificates and actual clients or applicable codes specification requirement.

Supervise material inspections performed by QC Inspector prior to release for fabrication.

Welder performance and Procedure Qualification Inspection and Record.

Assure that inspection on the marking-transfer for the material that requires traceability are performed by the assigned QC Inspector and recorded when required.

Control Fit Up, welding repair heat treatment, NDT are in compliance with the relevant codes and specifications.

Coordinate NDT technician for NDT inspection after completed weld and visual inspection and line check during installation.

Follow up punch list from client/owner and Conduct Shop 13 July 2014

To

15 May 2015

NIMROD K SIREGAR

QA/QC INSPECTOR / Steel Structure & Piping/Mechanical 3of 7

Audits/Surveillance to verify compliance to established procedure.

Responsible to make sure all process procedures are followed by production operator, leader maintenance and supervisor.

Ensure materials (Including Materials Safety Data Sheets) and equipment purchased and /or hired is specified to minimize risk.

Submit comprehensive report to QC Coordinator for about quality issue by daily.

Ensure that the corrective action is done according to the disposition and update the data & status in Rejection Notice (RN)/ Non Conformance Report

(NCR) log.

Wasco Engineering Indonesia Location: Batam – Kepulauan Riau, Indonesia QA/ QC Inspector ( TOTAL E&P ANGOLA BLOCK 32 (KAOMBO)Project) Job Description :

Responsible of all inspection activity and QA/QC documentations regarding the visual quality inspection and monitoring the product quality installation.

To create, analyze, and prepare the QA/QC Procedure, ITP, Work Instruction,

To ensure all product are manufactured in accordance with the quality standards that have been determined

To make all QC report, procedures/ doc related in Project activity

Responsible to the complains from client (complain handling) and to recommend rework of the un-standard product in Project work

Make progress report and send report to project leader / client according to schedule

Interact daily with Project Superintendent to interpret their needs and requirements and represent them in the field

Cooperate and communicate effectively with Project Superintendent and other project participants to provide assistance and technical support. PT.Sanggar Sarana Baja (Site Service Division) Location: BATU HIJAU, SUMBAWA – Nusa Tenggara Barat Province, Indonesia

QA/ QC Inspector

Mining Newmont Nusa Tenggara, project

Main Responsibility:

Perform inspection cutting Plan.

Perform fit up inspection.

Able to support production when repair due to shut down.

Prepare & issue document (Request for inspection) and issue to client for inspection as per ITP required.

Ensure that the requirements for material, all weld, welders & welding activities are correctly & carried out in accordance with relevant codes, client specifications & contract standards.

Coordinate NDT technician for NDT inspection after completed weld and visual inspection

16 May 2015

To

13 July 2015

7 September 2011

To

12 November 2013

NIMROD K SIREGAR

QA/QC INSPECTOR / Steel Structure & Piping/Mechanical 4of 7

Follow up punch list from client/owner.

Final inspection for rebuild and repair product support heavy equipment, mining truck (CAT) like fuel tank, fender, A Frame, dog bone, barrel rear and etc.

Submit comprehensive inspection discrepancy report.

Prepare monthly QC reports like Non comformity product and NCMR.

Verify that welding documents, heat treatment procedures, repair procedures, weld maps, painting schedule and fabrication drawing are posted near the area adjacent to the part being fabricated.

Verify that QC Inspectors perform final inspections of the completed parts/components for completeness, cleanliness, proper marking, packing and handling.

PT.ZENTRUM PRIMATEKNIK - Location: Tanjung Sekong –Merak Banten Indonesia Welding Inspector

Main Responsibility,

QA/QC review during and inspection during pipe spools fabrication onshore.

Liaise and handle with subcontractors.

Material receiving inspection, WPS, welder qualification, procedures, ITP and all QA/QC related documents.

Inspect and review weld/repair quality.

Responsible for monitoring and reporting bending piping, plate carbon steel and stainless steel.

Review DP, HT, RT results.

Coordination with Client / send RFI for inspection activities.

Reporting & QA/QC documentation.

PT.Flextronics Technology Indonesia Location : Batam Indonesia Electronics Manufacturer Company

Production Supervisor

Main Responsibility,

Lead a team production to produce PCBA especially electric component.

Control and manage direct and indirect material stock availability.

Review set up and implement store (mini store production) operating procedure

(receiving, issuing and etc).

Responsible to follow up material /PCBA from B/E station intil finished good.

Responsible for CAR (Corrective Action Report ) from QA and ensure the mistake not repeated again.

To responsible for accuracy material for loading production to achieve daily production target at expected quality standard at production line.

Working together with other department to reduce down time at line production.

Follow up punch list from client/owner.

10 January 2011

To

20 August 2011

23 November 2009

To

23 November 2010

NIMROD K SIREGAR

QA/QC INSPECTOR / Steel Structure & Piping/Mechanical 5of 7

PT. SANMINA-SCI BATAMLocation: Batam - Indonesia

Electronics Manufacturer Company

Production Supervisor

Main Responsibility,

In charge of production process in the line.

Develop the process for new product.

Assist NPI Engineer for NPI build in the factory.

Improve the production line field, knowledge of QS 9000 & ISO 14000.

Translating product design to the manufacturing drawings.

Closed cooperation with production Dept and Equipment engineer.

-

2 April 2007

To

2 April2009

PT. ENERGY INDONESIA SERVICES Location: Tanjung Jati B – Jepara Indonesia Mechanical Engineer (Central of Java)

Main Responsibility,

Ensure and check that material technique already installed in good condition.

Co-ordinate installations of maintenance revisions to software with Customers.

Liaison to communicate and resolve construction technical issue.

Improve the production line field, knowledge of QS 9000 & ISO 14000.

Maintenance, inspections and repair of mechanical equipment in accordance to SOP Preventive maintenance.

Supervise day to day activities and programs, ensuring quality, cost effectiveness and timely completion of the project.

Maintain Customer records, keeping them correct and up-to-date.

Interaction with Sales regarding any opportunities with Customer.

Follow up on Customer survey feedback.

Coordinate and manage costumer meetings.

1 Nov 2005

to

31 July2007

PT.AMC BINTAN Location: Bintan –Kepri, Indonesia

Warehouse Supervisor

Main Responsibility,

Provide overall materials handling engineering technical leadership and expertise.

Material handling, specifications and drawings.

Compliance with design methods and safety factors to be used in design of project.

Steward the contractor’s activities with respect to materials handling engineering and design including material handling engineering.

Development and design of the materials handling system.

Measurement and reporting of engineering progress.

Selection and specification of materials handling equipment and component like IC, socket, battere and other electronic component. 17 Oct2001

to

6 April 2005

PT. WANAMAS PUSPITA SHIPYARD Location: Batam - Kepri, Indonesia Build & Repair Ship Construction at Sagulung – Batam Store Maintenance Assistant

31 March 2000

to

30 March 2001

NIMROD K SIREGAR

QA/QC INSPECTOR / Steel Structure & Piping/Mechanical 6of 7

Main Responsibility,

- Control and manage direct and indirect inventory in stock.

- To keep, maintain and records (Storage System).

- Ensure all the equipment like pump, blower and technical tools are always ready.

- Perform daily cycle count and setting any issue in rotating shift.

- Prepare and support material for welder test and qualification.

- Review, evaluate and advise materials handling, specifications and drawing.

- Compliance with design methods and safety factors to be used in design of project. PT.WASA MITRA ENGINEERINGLocation: Paiton Probolinggo-East Java Indonesia Coal Fired Power Station, Paiton Private Power Project Phase 1 Mechanical Foreman

Main Responsibility,

Lead a team of fitter to install / erection piping job and ensure mechanical work completion by contractors according to method statement.

Supporting document control activities including preparation and review of redline drawing.

Start-Up, loading and shut-down operation.

Participating in and assisting with walk-downs of the various system in preparation for hand over.

Coordination with Client/company representatve for final inspection.

Briefing all worker (fitter and welder) to perform safety first in project area.

Maintenance and Trouble Shooting pumps and others rotating equipment. 10 Feb 1998

to

6 Jun1998

Skills:

Areas of Particular Expertise

- A successful track record in leading and coordinating multi-discipline teams

- Expertise in Engineering, Construction, Commissioning, Inspection, systems and procedure development using efficient and innovative technologies

- Hands on Experience with Construction, Inspection and Commissioning activities

- Familiar with electrical / Instrument codes and International Standards

- Strong Documentation skills

- Competent computer skills in Microsoft Office products including Word, Excel

- Competent People and Communications skills - Able to interact with a diverse team I am awarded that statement mentioned above are true and correct to the best of my knowledge and belief.

RegardS

Nimrod K Siregar



Contact this candidate