Post Job Free
Sign in

Civil Engineer

Location:
Dolores, CALABARZON, Philippines
Salary:
50,000
Posted:
July 22, 2017

Contact this candidate

Resume:

ENGR. REYCARD N. ANISLAG

Unit **** U.P. Bliss, Diliman

**** ****** ****, ***** ******

Contact No. : +63-908-***-****; (02) 785 0641

E-mail Address : ***********@*****.***

SUMMARY OF EXPERIENCE

Manage, monitor, and supervised the progress of the project until completion and turn-over stage. Prepare estimate, specification, planning & scheduling for bid documents. Ensure that works has been carried out according to specifications, approved plans, cost of plans, and safety standard. Preside and attend meeting from various projects together with the End- User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Review contract plans, approved plans and technical specifications in order to settle any problems and concerns will arise in the future for the good of the project. Evaluate every progress billing and variation order for additive and deductive cost of the project. Monitor every testing of materials, check and estimate every material to be used in the project. OCCUPATIONAL OBJECTIVE

To secure a position connected in a global organization company where I can demonstrate my administrative and executive ability and experience that would lead to a good and responsible position. WORK/PROFESSIONAL EXPERIENCE

Oikodomeo Construction Corporation

6/F Treston International College Building

32nd Street University Parkway cor . C-5 Road

Bonifacio Global City (BGC), Taguig

July 01, 2016 to June 30, 2017

Señior Civil Engineer. Monitor and supervise that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Prepare progress billing and variation order for additive and deductive cost of the project. Organized every testing of materials, check and estimate every material to be used in the project. Project Name : Proposed Los Baños Centro Mall

Project Address : Brgy. Batong Malake

Los Baños, Laguna

Owner/End-User : PYF Solid Blue

Architect/ Designer : Oikodomeo Construction Corporation Gen. Contractor : Oikodomeo Construction Corporation Company : Oikodomeo Construction Corporation

Tamoin Industrial Services Corporation (TISCO)

1103 East Tower Philippine Stock Exchange

Centre Exchange Road Ortigas

Pasig City

Site Civil Engineer. Monitor, supervise and ensure that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Attend meeting from various projects together with the End-User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Review contract plans, approved plans and technical specifications and other pertaining documents with regards to the project in order to settle any problems and concerns will arise in the future for the good of the project. Evaluate progress billing and variation order for additive and deductive cost of the project in relation to the issuance of payment certificate. Monitor and witness every testing of materials, check and estimate every material to be used in the project. March 02, 2016 to June 30, 2016

Project Supervisor / Inspector / QA.QC. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Extension of Control Building (Switchgear) Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : N5M Developers & Maintenance Corporation Const. Mngt. Team : TISCO

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

October 05, 2015 to June 30, 2016

Project Inspector. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Supply, Installation & Commissioning of SCADA System, RTU, Telecom & Substation Protection System

Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : Nayon Kontrol System

Const. Mngt. Team : TISCO

Gen. Contractor : Nayon Kontrol System

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

October 05, 2015 to June 30, 2016

Project Inspector. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Supply of Primary Equipment for Two (2) Substation Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO / Harty Incorporated Philippines Const. Mngt. Team : TISCO

Gen. Contractor : Harty Incorporated Philippines

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

December 03, 2015 to June 30, 2016

Project Supervisor / Inspector/QA.QC. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Control Building at Substation Pad Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO

Const. Mngt. Team : TISCO

Gen. Contractor : JTO Construction Corporation

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

December 03, 2015 to June 30, 2016

Project Supervisor / Inspector/QA.QC. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Civil Works at Switchyard of Substation Pad Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO

Const. Mngt. Team : TISCO

Gen. Contractor : JTO Construction Corporation

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

October 05, 2015 to March 25, 2016

Project Inspector/QA.QC. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Design & Build for 230 KV Transmission Line Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO

Const. Mngt. Team : TISCO

Gen. Contractor : S.L. Development Construction Corporation Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

October 05, 2015 to February 08, 2016

Project Inspector. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Supply of 2-Units ABB 50MVA Transformer Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO

Const. Mngt. Team : TISCO

Gen. Contractor : JL Business & Technology Consultancy, Inc. Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

October 05, 2015 to December 18, 2015

Project Supervisor / Inspector/QA.QC. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Spillway A & B, Access Road, & Substation Pad Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO

Const. Mngt. Team : TISCO

Gen. Contractor : JTO Construction Corporation

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

October 15, 2015 to December 15, 2016

Project Supervisor / Inspector/QA.QC. Manage and monitor every progress of the project from start to finish. Prepares Daily Progress Report, Weekly Report & Monthly Report to the Owner and Co-Owner of the project. Dealing every contractor to follow the planning & scheduling for proper implementation of the project. Evaluate every progress billing and variation order billing from every contractor upon issuance of Payment Certificate or Statement of Work Accomplishment. Project Name : Proposed Subic 150MW Solar & Wind Power Plant Project Address : Mt. Santa Rita, Pastolan

Subic Bay Freeport Zone

Owner/End-User : JOBIN SQM Inc.

Civil/Elec’l. Designer : TISCO / SUNSOURCE-ENERGY

Const. Mngt. Team : TISCO / SUNSOURCE-ENERGY

Gen. Contractor : Asiacrest / Dynamic Konstrak

Company : Tamoin Industrial Services Corporation (TISCO) Consultant + Engineers

PHILAB Industries, Inc.

7487 Bagtikan Street, San AntonioVillage

1203 Makati City

Civil Engineer. Manage, monitor, supervised and ensure that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Prepare estimate, specifications, planning & scheduling for bidding purposes. Attend meeting from various projects together with the End-User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Review contract plans, approved plans and technical specifications and other pertaining documents with regards to the project in order to settle any problems and concerns will arise in the future for the good of the project.

April 07, 2014 to Aug. 11, 2014

Project Engineer / Supervisor. Monitor and ensure that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Preside and attend meeting from various projects together with the End-User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Monitor the progress of the project until completion and turn-over stage within the schedule, budget and within the stipulated time limit.

Project Name : Proposed National Institute of Health Project Address : Philippine General Hospital-University of the Philippines Manila City

Owner/End-User : University of the Philippines/NIH Architect/ Designer : MOHRI Architects

Gen. Contractor : SC Megaworld/PHILAB Industries, Inc. Company : PHILAB Industries, Inc.

April 07, 2014 to Aug. 11, 2014

Project Engineer / Supervisor. Monitor and ensure that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Preside and attend meeting from various projects together with the End-User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Monitor the progress of the project until completion and turn-over stage within the schedule, budget and within the stipulated time limit.

Project Name : Proposed Philippine Genome Center

Project Address : National Science Complex

University of the Philippines

1101 Quezon City

Owner/End-User : University of the Philippines/PGC Gen. Contractor : SC Megaworld/PHILAB Industries, Inc. Company : PHILAB Industries, Inc.

February 07, 2014 to Aug. 11, 2014

Project Manager / Safety Practitioner. Manage, monitor, supervised and ensure that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Preside and attend meeting from various projects together with the End-User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Monitor the progress of the project until completion and turn-over stage within the schedule, budget and within the stipulated time limit.

Project Name : Proposed Renovation of 3/F Science Building Project Address : The British School Manila, Inc.

Bonifacio Global City

Taguig City

Owner/End-User : British School Manila, Inc. (BSM) Architect/ Designer : PHILAB Industries, Inc.

Const. Mngt. Team : Langdon Seah/Arcade

Gen. Contractor : PHILAB Industries, Inc.

Company : PHILAB Industries, Inc.

University of the Philippines Diliman

Office of the Campus Architect

G/F Coral Bldg.

Lakandula cor. De los Reyes Sts.

University of the Philippines-Diliman

1101 Quezon City

September 17, 2009 to Febuary 28, 2013

Engineer II. Monitor and ensure that work has been carried out according to specifications, approved plans, cost of plans, and safety standard. Preside and attend meeting from various projects together with the End-User, Designer, Consultant, General Contractor, and Suppliers prior to execution of work within the stipulated time limit. Monitor the progress of the project until completion and turn-over stage within the schedule, budget and within the stipulated time limit. Prepare and evaluate progress billing and variation order for additive and deductive cost of the project. Conduct site inspection in each concern that arose from any colleges within the state university campus. Prepare bill of quantity for the bidding documents and prepare drawing plans for each item that technically needed. Check and monitor every testing of materials, and estimate every material to be used in the project. Coordinate with other government entities that concerns with the permits and other documents needed in the project.

August 17, 2011 to February 28, 2013

Project Inspector/QA.QC. As part of the implementing agency we directly communicate with the end-user, construction management team and general contractor in order to monitor the progress of the project within stipulated Time limit and within the budget. Prepare and evaluate progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, check and estimate every material to be used in the project. Project Name : Proposed College of Science Administration Building & Site Development

Project Address : National Science Complex

University of the Philippines

1101 Quezon City

Owner/End-User : University of the Philippines/NSC Architect/ Designer : TCGI Architects + Engineers

Const. Mngt. Team : SCHEMA Konsult, Inc.

Gen. Contractor : HSO Construction

Company : Office of the Campus Architect-UP Diliman Architects + Engineers

July 25, 2011 to July 25, 2012

Project Inspector/QA.QC. Ensure high standard of Quality Assurance in the execution of work and completion of the project within stipulated Time limit. Comprehensive monitoring of project implementation activities by the construction management team together with the contractor to ensure complete compliance with the drawings, technical specifications and various stipulations contained in the construction contract document. Evaluate progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, and estimate every material to be used in the project.

Project Name : Proposed Renovation of GE/ES Department at Melchor Hall Project Address : College of Engineering

University of the Philippines, Diliman

1101 Quezon City

Owner/End-User : University of the Philippines/College of Engineering Architect/ Designer : CADA Architects + Planners

Const. Mngt. Team : Office of the Campus Architect Gen. Contractor : Alleway Construction

Company : Office of the Campus Architect-UP Diliman Architects + Engineers

May 09, 2011 to February 28, 2013

Resident Engineer / Inspector / QA-QC. Ensure high standard of Quality Assurance in the execution of work and completion of the project within stipulated Time limit. Comprehensive monitoring of project implementation activities by the construction management team together with the constructor to ensure complete compliance with the drawings, technical specifications and various stipulations contained in the construction contract document. Evaluate progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, and estimate every material to be used in the project.

Project Name : Proposed Design & Build of the Proposed National Center for Good Governance

Project Address : National Center for Good Governance (NCPAG) University of the Philippines

1101 Quezon City

Owner/End-User : University of the Philippines/NCPAG Architect/ Designer : DHN Construction & Development Corporation Const. Mngt. Team : Office of the Campus Architect Gen. Contractor : DHN Construction & Development Corporation Company : Office of the Campus Architect-UP Diliman Architects + Engineers

April 06, 2011 to February 28, 2013

Project Inspector/QA.QC. As part of the implementing agency we directly communicate with the end-user, construction management team and general contractor in order to monitor the progress of the project within stipulated Time limit and within the budget. Evaluate progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, and estimate every material to be used in the project. Project Name : Proposed Design & Build of the Proposed National Science Complex Development Road Network Extension

Project Address : National Science Complex

University of the Philippines, 1101 Quezon City

Owner/End-User : University of the Philippines/NSC Architect/ Designer : J-Bros Construction

Const. Mngt. Team : Office of the Campus Architect Gen. Contractor : J-Bros Construction

Company : Office of the Campus Architect-UP Diliman Architects + Engineers

August 02, 2010 to February 28, 2013

Project Inspector/QA.QC. As part of the implementing agency we directly communicate with the end-user, construction management team and general contractor in order to monitor the progress of the project within stipulated Time limit and within the budget. Evaluate progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, and estimate every material to be used in the project. Project Name : Proposed Institute of Electrical & Electronics Engineering Bldg. 2 Project Address : Engineering Complex

Velasquez Street, University of the Philippines

1101 Quezon City

Owner/End-User : University of the Philippines/IEEE Architect/ Designer : TCGI Architects + Engineers

Const.Mngt.System : Philipp’s Technical Consultants Corp. Gen. Contractor : China State Philippines Construction Corp. Company : Office of the Campus Architect-UP Diliman Architects + Engineers

April 22, 2010 to February 28, 2013

Project Inspector/QA.QC. As part of the implementing agency we directly communicate with the end-user, construction management team and general contractor in order to monitor the progress of the project within stipulated Time limit and within the budget. Evaluate progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, and estimate every material to be used in the project. Project Name : Proposed Institute of Biology Building Project Address : Engineering Complex

Velasquez Street, University of the Philippines

1101 Quezon City

Owner/End-User : University of the Philippines/NSC Architect/ Designer : TCGI Architects + Engineers

Const.Mngt.System : RN Ferrer & Associates, Inc.

Gen. Contractor : J.D. Legaspi Construction

Company : Office of the Campus Architect-UP Diliman Architects + Engineers

April 20, 2010 to February 28, 2013

Project Inspector/QA.QC. Ensure high standard of Quality Assurance in the execution of work and completion of the project within stipulated Time limit. Comprehensive monitoring of project implementation activities by the construction management team together with the contractor to ensure complete compliance with the drawings, technical specifications and various stipulations contained in the construction contract document. Prepare and evaluate every progress billing and variation order for additive and deductive cost of the project. Check and monitor every testing of materials, and estimate every material to be used in the project.

Project Name : Proposed Institute of Environmental Science & Meteorology Bldg. Project Address : National Science Complex

University of the Philippines

1101 Quezon City

Owner/End-User : University of the Philippines/NSC Architect : CADA Architects + Planners

Designer : DCCD Engineering Corp.

Const.Mngt.System : Office of the Campus Architect Gen. Contractor : Prismodial Construction Corp.

Company : Office of the Campus Architect-UP Diliman Architects + Engineers

City Assessor Office

2/F City Hall Bldg.

City Hall Drive

7200 Ozamiz City

January 22, 2001 to September 16, 2009

Building Officer/Tax Mapper II. Prepare detailed cost estimate from as-built structures. Conduct site inspection and appraise remaining structure in the field for taxation purposes as per Section 203 and 204 under the Republic Act 7160. Proposed Residential Bldg. (One-Storey Project)

P-1 Urban Ville, Molicay

7200 Ozamiz City

February 2003 to June 2003

Project Engineer. Prepare the scope of work, design plans from structural to architectural finishes, programs of work, estimating the bill of materials and labor cost to identify the overall cost of the project. Secure all permits in different agencies of local government offices and private offices. Conduct a weekly meeting with the field engineer and foreman who mobilize the project for them to follow the schedules and scope of work for proper and early completion of the project. When problem arises settle it in fairness with the end-user. Residential Bldg. (Proposed Two-Storey Renovation)

#634-A Ostia Avenue, Tinago

7200 Ozamiz City

June 1999 to July 1999

Project Engineer. Prepare the scope of work, design plans, and estimate the bill of materials in view of the present price list of all the materials to identify the cost of the renovation. Monitor and supervise every manpower activities for proper implementation during carpentry works, masonry works and architectural finishes. Trans-Asia (Philippines), Inc.

4/F Bloomingdale Bldg.

205 Salcedo Avenue, Legaspi Village

1229 Makati City

September 16, 1997 to September 15, 1998

Site Engineer/QA.QC. Ensure high standard of Quality Assurance in the execution of work and completion of the project within stipulated Time limit. Comprehensive monitoring of project implementation activities by the construction management team together with the constructor to ensure complete compliance with the drawings, technical specifications and various stipulations contained in the construction contract document. Maintain the quality assurance of all materials needed in the project from start to finish.

Project Name : Proposed Westmont Bank Tower (38th Storey Bldg.) Project Address : 6789/91 Ayala Avenue

Salcedo Village, Makati City

Owner/Developer : Sta. Lucia Realty Development Inc. Architect : MOS & Associates

Gen. Contractor : D.M. Consunji Inc.

System : CW-400 Curtain Wall

Company : Trans- Asia (Philippines), Inc.

Consultant + Engineers

RELEVANT TRAININGS / SEMINARS ATTENDED

Philippine Solar Energy Society

Andy Hotel, National Highway, Cebu City, Philippines November 19-20, 2016

MEPF, Sanitary, Water Treatment, Wastewater Technology, Plumbing & Environmental Design in Cebu Department of Labor and Employment (DOLE) / PEME Consultancy, Inc. EDSA Shangri-la Plaza Mall

Mandaluyong City, Philippines

March 25, 2014 to March 28, 2014

Construction Occupational Safety and Health (COSH) Constructors Performance Evaluation System (CPES)

The Construction Industry Authority of the Philippines/Philippine Domestic Construction Board Institute for Small-Scale Industries (ISSI), U.P. Diliman Campus, Quezon City, Philippines September 05, 2012 to September 07, 2012

Accreditation of the Technical Employees of the University of the Philippines as Constructors Performance Evaluators

(CPEs)

Philippine Institute of Civil Engineers, Inc. (P.I.C.E.) 36th National Convention, Cebu International Convention Center, Cebu City, Philippines November 25, 2010 to November 27, 2010

Engineering for a Better Philippines

Association of Structural Engineers of the Philippines (A.S.E.P.) San Carlos Pastoral Formation Complex, Guadalupe, Makati City, Philippines October 21, 2010 to October 22, 2010

Code Updates of National Structural Code of the Philippines Philippine Institute of Civil Engineers, Inc. (P.I.C.E.) 35th National Convention, CAP-John Hay Trade & Cultural Center, Baguio City, Philippines November 26, 2009 to November 28, 2009

Leading the Way to Green Buildings and Infrastructure Philippine Institute of Civil Engineers, Inc. (P.I.C.E.) 27th National Convention, Waterfront Hotel, Cebu City, Philippines November 29, 2001 to December 01, 2001

Harnessing INFORMATION TECHNOLOGY Toward the Advancement of the Civil Engineering Profession. Civil Service Commission (Region X)

G/F ABC Bldg.

City Hall Drive, 7200 Ozamiz City

Mentoring Principles and Omnibus Rules and Other Pertinent Civil Service Laws and “Mamayan Muna Hindi Mamaya Na Campaign”. March 20, 2001 (8 hours)

Values Orientation Workshop. March 21-23, 2001 (24 hours) MicroCADD Technologies Co.

Quezon City, Metro Manila, Philippines

Computer-Aided Project Management (PRIMAVERA) it covered creating and modifying a plan schedule, project monitoring and controlling budget, managing resource and estimating and documentation. July 12, 1998 – August 16, 1998

(33 hours)

Computer-Aided Structural Analysis and Design (STAAD III) it covered theory of structural analysis and design, computer analysis of 3D reinforce concrete structures, computer aided design of reinforce concrete structures and structural detailing and documentation. July 11, 1998 - August 15, 1998 (33 hours) Computer-Aided Design, Drafting and Color Rendering (AutoCAD) it covered basic computer operation, drafting of 2D and 3D perspectives, lot input, area and file utilities, configuring AutoCAD and plotting. March 22, 1998 – June 7, 1998 (83 hours)

EDUCATIONAL BACKGROUND

M.S. in Remote Sensing. College of Engineering, University of the Philippines, Diliman Quezon City, AY 1998-99 B.S. in Civil Engineering, Misamis University, Ozamiz City, Philippines, March 1996. Member of Junior-Philippine Institute of Civil Engineers (J-PICE), Ozamiz City Chapter, 1995-1996. Active in college games, especially in intramural games like table tennis, chess, volleyball and basketball.

PROFESSIONAL MEMBERSHIP

Philippine Institute of Civil Engineers (PICE), Cebu City Chapter, Dec. 1996 to Present. EARLY BACKGROUND

Grew up in Ozamiz City, son of former City Budget Officer. Attend public schools prepared for college at National High School, Ozamiz City, and Graduated March 1991. Battalion staff in citizen army training and a member of a school band and played during intramural games like table tennis and chess. SPECIALS SKILLS

Driving Skills and Computer Literate.

PERSONAL INTERESTS

Enjoy swimming, table tennis, and chess as time allows, basketball, volleyball, badminton. PERSONAL DATA

Born: 05/29/1974

Married with two children.

Enjoy excellent health.

Height: 5’ 9”

Weight: 158 lbs.

Willing to relocate and travel if position merits. CHARACTER REFERENCES

1. Dr. Ringer T. Manalang - Architect IV

Office of the Campus Architect

G/F Coral Bldg.

Lakandula cor. De los Reyes Sts.

University of the Philippines-Diliman, 1101 Quezon City Tel.no. : 981-8500 Loc 3968

2. Engr. Philip P. Almeda - Engineer III

Office of the Campus Architect

G/F Coral Bldg.

Lakandula cor. De los Reyes Sts.

University of the Philippines-Diliman, 1101 Quezon City Tel.no. : 981-8500 Loc 3971

3. Engr. Conrado E. Cortez - Engineer III / Structural Engineer Office of the Campus Architect

G/F Coral Bldg.



Contact this candidate