Mark Goodman
**** ******* *****, ******, ** ***** 920-***-**** *******.******@*****.***
Objective
To obtain employment as a mechanical technician that will utilize my extensive experience and provide the opportunity for challenges, responsibility, and advancement.
Education
■ U-W Stout – Technical Education – Mechanical Design
■ Fox Valley Technical College – Mechanical Design
Experience
Direct-Start – Contractor at CMD December 2016-Present
Supporting new machine with designs and detailing.
Technical Employment Services – Contractor at Georgia-Pacific April 2016-October 2016
Supported Innovated Group on machine updates.
Learned Inventor and 3D AutoCad programs
PDS – Contractor at Valmet September 2015-March 2016
Supported Roll Service with updates to paper machine rolls
Learned Catia Cad program
Kelly – Contractor at Pierce February 2015-July 2015
Supported Rescue Group doing detail drawings
Learned Medusa Cad program
Technical Employment Services – Contractor at Kimberly-Clark 2011-2014
Contracted at Kimberly-Clark, Neenah Cold Spring Facility in the Maintenance Department
Supported Reliability Team with predictive and preventative maintenance
Supported Die Shop with updates on cutting modules
Converted AutoCAD module drawings to SolidWorks drawings
RCM Technologies – Contractor at Kimberly-Clark 1996-2011
■ Contracted at Kimberly-Clark in the Family Care and Infant Care sectors
■ Diaper Plant: Part of installation team that worked with outside contractors to install two new machines
■ International Group: Updated drives to servo motors and travelled to Columbia for installation ■ Air Systems Group: Documented existing ducting at mill site
Kimberly-Clark Corporation Mechanical Designer 1981-1996
New Product Sector
■ Responsible for equipment layout on a first of its kind machine. Specified and ordered packaging equipment. Worked with machine shop to assemble, de-bug and check out equipment modules. Team member on the start-up coverage group that optimized machine efficiency.
■ Trained machine crews to operate packaging equipment
■ Machine efficiency was at twelve month projection point when coverage ceased after four months
Child Care Sector
■ Responsible for ordering packaging systems for new converting lines on first expansion. Held lead mechanical role on following expansion for ordering converting line and packaging systems. Supervised the installation of the above equipment at the plant. Worked with construction, electrical, air systems, and plant engineering teams as well as numerous outside vendors.
■ Led staff of four designers on mechanical project totaling $20MM+
■ Project completed ahead of schedule and above projected pace of production
Infant Care Sector
■ Worked in air systems, improvement groups packaging and product
■ Supervised installations and assisted with start-up procedures at numerous plants ■ Initiated cost saving ideas for conveyors and bagger size parts
Computer Skills
SolidWorks have used for 8 years
Inventor
Catia
AutoCAD
Word
Excel