Post Job Free
Sign in

Engineer Process

Location:
Katy, TX
Posted:
July 14, 2017

Contact this candidate

Resume:

ERIKA ROLO

**********@*******.*** Mobile: +1-832-***-****

*/**/****

SENIOR PROCESS ENGINEER

BACKGROUND SUMMARY

Skilled process engineer with more than 19 years of experience in the oil and gas industry performing roles of increasing responsibility on global engineering projects.

Intimately familiar with EPC operations, FEED studies, Basic & Detailed Engineering, with an excellent working understanding of applicable industry codes and standards.

Extensive international experience (Venezuela, USA and UAE) petroleum refineries, gas processing, LNG production, upstream facilities for petroleum & gas petrochemical plants and solids handling.

Proficient in the use of the following software applications: HYSYS, PROII, PIPEFLO, FLARENET, PIPEFHASE, PIPESIM, ICARUS PROCESS EVALUATOR (IPE) and HTRI. Microsoft Office applications (Excel, Word, PowerPoint, Visio).

Multicultural leadership, proactive, dynamic, focused on teamwork, strong communication and coordination skills with the various engineering disciplines.

Eager to accept new challenges.

Bilingual: English/Spanish written and oral communication

Working toward PE registration license.

EDUCATION

UNIVERSIDAD CATÓLICA ANDRÉS BELLO (UCAB). CARACAS, VENEZUELA. 2003. MBA MARKETING UNIVERSIDAD SIMÓN BOLÍVAR (USB). SARTENEJAS, VENEZUELA. 1998. BS CHEMICAL ENGINEER Registered Profesional Engineer Venezuelan (Colegio de Ingenieros de Venezuela CIV N : 110.267) EXPERIENCE

BECHTEL OIL GAS AND CHEMICALS Houston, USA 2012 – January 2017 PROJECT: Wheatstone LNG Plant (WLNG)

Engineering, procurement, construction and commissioning for the new LNG plant, using ConocoPhillips Optimized Cascade

® process technology. The plant is composed of two (2) LNG trains with a combined capacity of 8.9 million metric tons per year. Senior Process Engineer responsible for determination of minimum design metal temperature (MDMT), Range, alarm and trip summary, process safety time calculations and vendor drawings review. Client: Chevron, Onslow, Western Australia

PROJECT: Australian Pacific LNG Plant (APLNG)

Engineering Group Supervisor (EGS) and Senior Process Engineer for the Australia Pacific LNG plant (APLNG), using ConocoPhillips Optimized Cascade ® process technology. The plant is composed of two (2) LNG trains. Each train is independent of the input gas supply for the treatment of acid gas, moisture and mercury removal prior to liquefaction and the nitrogen rejection for eliminating nitrogen introduced with the feed gas. Process aspects of the project include simulations, Heat and Material Balances, Process Design Basis, Process Description, PFD’s. Sizing emergency depressuring valve (EDP) for various units in the LNG plant using Hysys. Prepared relief device sizing calculations and datasheets for multiple overpressure scenarios used API 520/ 521 /526, ASME, Australian codes and client guidelines. HAZOP and SIL reviews, alarm and trip summary, process safety time calculations and vendor drawings review. Support Operability Assurance Group. Client: ConocoPhillips, Curtis Island, Australia.

PROJECT: SEZ HNUU & Platformer Revamp

Senior Process Engineer responsible for relief load calculations and relief valves calculations (ProII) at SEZ HNUU & Platformer Revamp, Reliance Industries, Jamnagar, India. Client: Reliance Industries Ltd (RIL), Jamnagar, India ERIKA ROLO

SENIOR PROCESS ENGINEER

**********@*******.*** Phone: +1-832-***-****

7/13/2017

TECNOCONSULT UK, Abu Dhabi, UAE 2009 - 2012

Business Development. Responsible for providing technical support in the preparation of proposals for the oil industry. Additional activities included the development of databases for the handling of information required in the preparation of proposals, company qualifications, and the compiling of documentation from previous projects for the use in proposals: Historical Database of Projects Executed, Historical Database of Proposals and Preliminary Company Qualifications. PROJECT: Construction works of twelve Gas Producer Tie-ins and Flow Lines Segregation for Units 6 & 7 Wells at BAB

Lead Process Engineer. Construction work compromised of twelve gas producer Tie-ins and segregation of Units 6 & 7 wells from flow paths shared with other wells, Responsible for the coordination and development of P&ID's, hydraulic calculations

(Pipesim), Cause and Effect Diagrams and Instrumentation Datasheets. Client: Abu Dhabi Company for Onshore Oil Operations ADCO. Abu Dhabi, UAE PROJECT: Addition of LPG Dehydration Unit

Lead Process Engineer. Installation of Liquid Petroleum Gas (LPG) Dehydration Unit which will act as the common standby for the existing dehydration units. Responsible for the coordination and development of PFD’s, P&ID's, Data collection in the field. Equipment and Instrumentation Datasheets, Hydraulic Calculations, Flare and Relief System design. Attendance to the HAZOP. General Coordination & Quality Activities.

Client: Abu Dhabi Oil Refining Company (TAKREER) Ruways Refinery. Abu Dhabi, UAE PROJECT: Replacement of 16" & 10” Gas pipelines @ BAB area Lead Process Engineer. Replacement of 16" & 10" Gas pipelines @ BAB area. Responsible for the coordination and development of Hydraulic Calculations, PFD’s, P&ID's, Equipment and Instrumentation Datasheets. Client: Abu Dhabi Gas Industries LTD (GASCO). Abu Dhabi, UAE TECNOCONSULT US Houston, USA 2006 – 2009

Business Development Responsible for providing technical support in the preparation of proposals for the oil industry. Additional activities included the development of databases for the handling of information required in the preparation of proposals, company qualifications, and the compiling of documentation from previous projects for the use in proposals: Historical Database of Projects Executed, Historical Database of Proposals and Preliminary Company Qualifications. PROJECT: Flare Gas Recovery Project SGRU-1242.

Sr. Process Engineer. Study to evaluate the adequacy of Flare B-103 with additional relief loads (Flarenet) and a new flare seal drum. Contingency Analysis.

Client: Valero Port Arthur Refinery, Texas. USA

PROJECT: Delayed Coker Expansion

Sr. Process Engineer. Relief load calculations and instrument specifications PSV’s calculations (Hysys) and Instrumentation Datasheets. Application of International Standards API 520 and API 521. Client: Hunt / Tuscaloosa. USA

PROJECT: #3 Crude Expansion Phase

Sr. Process Engineer. Responsible for the coordination and development Instrumentation Datasheets. Client: Marathon Petroleum Catlettsburg, KY. USA

PROJECT: Unit 3 Heat Integration Project

Sr. Process Engineer. Responsible for the coordination and development of Heat & Material Balances, PFD’s and PID’s development, Simulations (Pro II), sizing heat exchangers (HTRI). Hydraulics Calculations. Client: Conoco Phillips, Sweeny Refinery, Texas. USA PROJECT: Calcium Chloride Project, Trinidad

Process Engineer. Responsible for the coordination and development of PFD’s, P&ID's, Equipment and Instrumentation Datasheets, Hydraulic Calculations, Utilities.

Client: Carisal, Point Lisas, Trinidad.

ERIKA ROLO

SENIOR PROCESS ENGINEER

**********@*******.*** Phone: +1-832-***-****

7/13/2017

PROJECT: Capacity Expansion Project, Calumet Project, Shreveport, LA Process Engineer. Responsible for Hydraulic Calculations, sizing equipment, Equipment & Instrumentation Datasheets, P&ID’s and PFD’s.

Client: Calumet – Shreveport. USA

PROJECT: Alky Reliability Upgrade Phase II – Contactors & Effluent Treating Systems – Project Study Process Engineer. Developing PFD’s, P&ID's, Equipment Datasheet information, Hydraulic Calculations, Utilities. Client: CITGO – Lake Charles, Louisiana. USA

PROJECT: Kerosene/Jet Bender System – Project Study Process Engineer. Size equipment, Piping and Instrumentation lists for Blend Oil Hydrotreater (BOH) and Blend Light Cycle Oil Hydrotreater (BLCOH), new kerosene Hydrotreating Unit (HTU), and associated OSBL systems. Technical member of Technology Selection Team for Bender Revamp/replacement. Client: CITGO – Lake Charles, Louisiana. USA

TECNOCONSULT INGENIEROS S.A, VENEZUELA 2001-2006

PROJECT: Sulfur Recovery Unit Expansion and Unibon Revamp Project Study. Corpus Christi Refinery Process Engineer. Cost Estimates and Process Evaluation using the Icarus (IPE) software. Client: CITGO – Houston. USA

PROJECT: Ultra Low Sulfur Diesel Solutions for Corpus Christi Refinery Process Engineer. Cost Estimates and Process Evaluation using the Icarus (IPE) software. Client: CITGO – Houston. USA.

PROJECT: Modificaciones ID facilidades GAS GATHERING FASES I Y II - Detail Engineering. Lead Process Engineer – Simulation and Hydraulic Calculations, P&ID ́s, PFD ́s, Line List and Equipment & Instrumentation Datasheets. General Coordination & Quality Activities Client: SINCOR, Venezuela

PROJECT: Gas Gathering M830 (ID Modificación de Clusters) - Detail Engineering. Lead Process Engineer – P&ID ́s, line list, Tie-in list and Equipment & Instrumentation Datasheets. Coordinated and support other disciplines.

Client: SINCOR, Venezuela

PROJECT: FCCU’S Revamp Corpus Christi Refinery – Basic & Detail Engineering. Process Engineer. Link between Houston - Caracas Offices. Process aspects of the project including Process Design Basis, PFD, P&ID's, Equipment Data Sheet information, studies and evaluations, H&MB, Process descriptions, HAZOP Review, Process Scope Changes. General Coordination & Quality Activities. Client: CITGO – Houston. USA

Business Development. Responsible for providing technical support in the preparation of proposals for the oil industry. Additional activities included the development of databases for the handling of information required in the preparation of proposals, company qualifications, and the compiling of documentation from previous projects for the use in proposals: Historical Database of Projects Executed, Historical Database of Proposals and Preliminary Company Qualifications. PROJECT: GAS GATHERING. Sincor - Detail Engineering. Process Engineer – Simulation and Hydraulic Calculations, P&ID ́s, PFD ́s, Line List and Equipment & Instrumentation Datasheets.

Client: SINCOR. Venezuela

PROJECT: FCCU’S WET GAS SCRUBBERS. Lake Charles Refinery - Detail Engineering. Process Leader - Link between Houston - Caracas Offices. Coordinated and support to other disciplines. Attendance to the HAZOP. General Coordination & Quality Activities.

Client: CITGO- Houston, USA

ERIKA ROLO

SENIOR PROCESS ENGINEER

**********@*******.*** Phone: +1-832-***-****

7/13/2017

PROJECT: SOLIDS HANDLING EXPANSION PROJECT (SH2). Petrozuata - Detail Engineering. Process Engineer – Field Survey and utilities conceptual/basic design. P&ID ́s and vendor information. Responsible for Management of Changes. Attendance to the HAZOP. Operation Manual & Final Documentation Coordinator (Denver- Caracas).

Client: PETROZUATA. Venezuela

PROJECT: WELLS TOTAL 2002. Detail Engineering.

Process Engineer. – Hydraulic Calculations, Depressurization Dynamic Simulation, P&ID ́s Equipment & Instrumentation Datasheets.

Client: TOTAL OIL & GAS VENEZUELA (TOGV). Venezuela PROJECT: NEW NAVAL BASE OF EAST.

Process Engineer. – Design Fire Fighting System, Hydraulic Calculations, Inventory calculation for Diesel including logistic and transportation facilities, P&ID ́s and datasheets. Client: VENEZUELAN NAVY

PROJECT: MORICHAL UPGRADER UTILITIES & OFFSITES PACKAGE. Basic Engineering. Process Engineer –Responsible for the engineering & design of Relief and Flare System for the pioneer Aquaconversion Plant, including hydraulic calculations and API 520 /521 calculation for the entire facilities. P&ID ́s, PFD ́s, UFD ́s and datasheets.

Client: INTEVEP – PDVSA. Venezuela

PPC PROCESS PLANT CONTRACTOR S.A., CARACAS 1998-2001 PROJECT: UPDATING OF P&ID ́s AND PFD ́s SAN TOMÉ.

Process Engineer – Field Survey and CAD update P&ID project for Refinery El Palito Client: PDVSA, Venezuela

PROJECT: EXPANSION COMPRESSOR PLANT “ZORRO”. Basic Engineering. Process Engineer - Responsible of Design & Engineering of a Compressor Plant, Hydraulic calculation, P&ID ́s, PFD ́s, Line List and Equipment & Instrumentation Datasheets

Client: SADE-PEREZ COMPANC, Venezuela

PROJECT: EXPANSION COMPRESSOR PLANT “C-SUR”. Basic Engineering. Process Engineer - Responsible of Design & Engineering of a Compressor Plant, Hydraulic calculation, P&ID ́s, PFD ́s, Line List and Equipment & Instrumentation Datasheets

Client: SADE-PEREZ COMPANC, Venezuela.



Contact this candidate