Operations/Construction Manager/Construction Material Sales and Rental / Superintendent/General Superintendent
Developed production operation facilities following budget requirements.
Oversaw production from start-up to customer delivery.
Developed time lines for construction projects, working with Engineers,
Architects, Sub Contractors. Supplying them with submittals, as built documentation, negotiated change orders.
Project Estimations, working with Sub contractors developed estimations, and bids for construction projects.
Developed and implemented salary rates, job descriptions, and safety training programs for employees.
Worked with contractors throughout the southern U.S., meeting both face to face with them and over phone and Internet.
Followed blueprints.
Reviewed plans, drawings, blueprints, etc., offering suggestions for improvements.
Increased production, saving time and labor costs.
Delivered products and services on time.
Ran crews constructed formwork, poured concrete for vertical walls for pump stations, flood protection walls, flatwork etc.
Over seen site work.
Computer Skills
Microsoft Excel
Microsoft Word
Visio similar to Auto Cad I own this program.
Some Auto Cad I also own this program have not sent much time on it.
Publications
Co- Authored Audio Cassette Bill and Steve Wilson’s
“Keys to Bow Hunting Success” Covered Type of Equipment Needed, Shooting Practice, Blind & Stand Preparation, Scouting and Safety.
Certifications
Have been certified for the operation of most heavy and light equipment from
Fiction, Hydraulic, Cranes, and Bobcats, Fork lifts, etc.
NRA Instructor Pistol and Personnel Protection in the Home.
Which allows me to Teach a classes to residents of Louisiana allowing getting a canceled weapon permit.
Instructor State of Louisiana Hunter Education
Class that has to be taken to get a Louisiana Hunting License
Have up to date TWIC CARD
Honors
NRA 4 Man Team International Civilian Skeet National Record member
U. S. All American Sheet-Shooting Member 1974-1984
Louisiana Innovated Business of the year 1994 part owner
Four Time NCAA National Championship Team Member
Nicholls State University 1977-1981
Only NCAA National Championship for the University
Public Office
Lafourche Parish Councilmen 1980-1984
Lafourche Parish President 1988-1992
Developed and Implemented Hurricane Preparedness Program
Which was use for Hurricane Andrew which covered everything from the time the storm entered the Gulf through mitigation with state and federal agencies.
Emergency Operation Requirements, EOC, Organizational Charts, Staff Organization, Supplies, Equipment, Floor Plans. Sample Emergency Ordinances, Traffic Control Maps, indentify Medical Assistance Shelters, General Public Shelters, Evacuation Plans, for six different zones throughout the Parish. Evacuation Checklists, Evacuation Zone Maps, Southeast Hurricane Evacuation Routes Maps, parish equipment Lists, Communications, Emergency Alert Systems, Utility Restoration, Reporting forms state and Federal, Emergency Phone lists, develop damage assessment teams, Activate damage assessment teams, compile damage reports, written video, photograph form. How to request and complete disaster declarations forms, state and federal, Debris clearance, ID card to return to evacuated areas. State and Federal mitigation reporting forms, state and federal mitigation contact information. List goes on and on.
I learned firsthand on how and why state and federal guidelines have to be followed to get funding. For mitigation programs, and other Hurricane related expenditures.
Work History Steven D. Wilson
February 2016- Present
Contractors Supply & Equipment Laplace La.
Forming, Shoring, design and rental, outside sales concrete Supplies and Accessories.
June 2014 – February 2016
Volute Municipal General Superintendent.
Projects Completed
Upper Kraak Pump Station Jefferson Parish La.
Oversaw relocation of utilities, Timber pile, Sheet pile shoring (used as backside of new addition of wet well concrete walls, pile installation, construction of additional sump well space, installation of a (2) new pumps, backup generator, new control house, demo old pump house, new roadway (Limestone). Fencing etc.
Stonebridge Lift and Trapp Canal Lift Station
Gretna La. Jefferson Parish La.
Oversaw relocation of utilities, Timber pile, Baker Box shoring New addition Fiberglass wet well, construction of additional sump well space, installation of a (2) new parish owned pumps, demo old pump station, new roadway concrete Fencing etc.
Sewer Capital Rehabilitation Program
Rehabilitation of the effluent Pump Station
City of Kenner La.
Replacement of (6) 20” pumps and motors, reconstruction of discharge manifold, installation of new valves, check valves, gate valves, etc. New electrical control system contained motor control facility, flow meters. Leak assessment surveying of main discharge pipeline from facility to river electron magmatic survey. New power
distribution switchgear and transformer. Installation new 48” valve.
January 2013- June 2014
Contractors Supply & Equipment Laplace La.
Forming, Shoring, design and rental, outside sales concrete Supplies and Accessories.
2005- 2012
CMC Construction Services, Baton Rouge La. I started by doing outside sales working out of New Orleans. I was asked to start up a forming and shoring yard in Baton Rouge. I located warehouse and office space, developed the yard, and hired employees. Once the rental yard was fully staffed, I have now moved back into sales and rental. April 2012 CMC made the decision to move all of their forming and shoring rental operations to their Houston facility. I decided not to relocate to Houston.
2003-2005
I worked for Coastal Bridge and Paving. Baton Rouge La. I was the lead carpenter on a four-lane cantilever bridge over the Intracoastal Waterway. Work my way up to superintend.
Left to go to work with CMC.
2001-2003 Bell South, Thibodaux La.
I ran a new trenching and boring division to install DSL service. I stayed only a year because their Union protested my hiring. I got a better offer to work for D-C Construction who had the contract to build the concrete pads and small structures that housed the DSL hardware.
1997-2001
Campbell Construction of Baton Rouge, LA, Superintendent had the maintenance and improvement contract with Bell South (now AT&T) for all for their switching warehouse facilities in South La. I was their superintendent in the New Orleans Area. All work performed was coordinated through me and done by sub-contractors, including paving parking lots, moving emergency generators from basements to third or fourth floors. We rewired and reinstalled, with new fuel lines, new fuel storage; we cut out interior and exterior walls, installed louvers, fans, windows, doors, etc. to Bell South’s Specifications.
1994- 1997
Ceanic Inc. Offshore Diving Company, as Operations Manager building a deep-water vessel dock facility at Port Fourchon, La. I supervised the installation of 1200 linear feet of steel sheet pile, the construction of pads, parking lots, and living quarters. I secured potable water for vessels, purchased materials and supervised the use of equipment, including forklifts and cranes. I hired the personnel and developed schedules for a 24/7 operation. This company changed ownership two times and ended up being owned by Stolt Comex Seaway out of Germany, and an operations manager who was over two other docks in the U.S. replaced me.
1980 – 1994
P.P. & S. Raceland La. Family owned polystyrene plant manufactured polystyrene buoys used to float pipeline in place. Also manufactured a line of polystyrene 3-d deer targets.