Abd Allah Isa Hmd elseed Isa
+249-********* Or + 966 050*******
E-mail: ac15b3@r.postjobfree.com
Personal Details
Date of Birth 01 Jan, 1973
Nationality Sudanese
Marital Status Married
Statement of Qualifications
Senior Survey Engineer
- 16 years of rich professional experience in Various Construction Projects including highways, irrigations, and bridges.
- Proven skills in Computer software, Quantity Surveying and Survey Equipments. Education
Jun.1998-May. 2001 Bachelor Degree in Surveying Engineering (Cartography & Geodesy) Institution: Sudan University of Science & Technology. Khartoum, Sudan Mar.1994 - Jun 1997 Diploma in Degree in Surveying Engineering Institution: Sudan University of Science & Technology. Khartoum, Sudan Personal Skills and Competencies
LANGUAGES: SPEAKING READING WRITING
English Good Good Good
Arabic Excellent Excellent Excellent
Work Experience
June. 2010- Present Employer: RASHEED IBRAHIM AL-OWIDAH Est. for Maintenance &construction.(KSA);
Position: Senior Engineering Survey
Responsibilities: Performing site surveying and construction of Medina Al- Monowarah Projects including traversing, levelling, details surveying and engineering construction for; GROUP17 DIR3,DIR4,SR2R. RIYAD CROSSING ARFAT/AZIZIA BRIDGE
Aug. 2005-Jan. 2010 Employer: MAM for Road and Bridges, Sudan Position: Senior Engineering Survey
Responsibilities: Part of the construction team, responsible for all works related to surveying and quantities including:-
- Atbara Marawi highway with total length of 94km.
- Wadi elsulim Halfa highway Northern Sector and Half City Roads with total length of 173km.
- Um Eltuor Elbawga highway with total length of 65km
- Atbara Sidon highway with total length of 66km
- Elmatama Elhogna highway with total length of 29km Dec. 2004-July. 2005 Employer: Elnoures Petroleum Service, Sudan Position: Quantity Surveyor and Survey Engineer
2
Responsibilities: all quantity survey and survey works related to project including:-
- pipe line drilling and back filling from Hadiga to Rogal pump No 6 with total length of 100km.
Mar.2003-Sep.2004 Employer: Arfal engineering for road and bridges construction, Sudan Position: Survey Engineer
Responsibilities: all quantity survey, contouring and survey works related to irrigation projects including:-
- Establishment of control and traversing networks, checking the horizontal and vertical alignments.
- As built Surveys, earthwork volume and stockpile surveys and helping in preparing of bills of quantities.
for Elgwabra agricultural scheme with total area of (100Fd), Elgnefab agricultural scheme with total area of (120Fd), Umsafaya agricultural scheme with total area of (1200Fd) and Sarsaf agricultural scheme with total area of
(600Fd)
Jun. 2002-Feb 2003 Employer: Sudan Engineering & Digital Information Centre (SEDIC), Position: Survey Engineer and construction supervisor Responsibilities: responsible for all survey work including ground and as-built surveys and setting-out surveys.
- Detailed Survey Elkalakla-Hasanab road with total length of (24km), Elazozab- Soba link road with total length of (12km) and Rehabilitation of Wadi Omdurman road with total length of (15km).
- As built Surveys, earthwork volume and stockpile surveys and helping in preparing of bills of quantities.
- Using surveying equipment's (Total station and level) and computer software to facilitate the work and gather data.
Special Training Courses
SET. 18-20, 2012 ZOOHAL Engineerring&Training Center in Autocad civil3d 2012&Earth Works.
Survey Instruments
GPS (hand held, Agricultural GPS, Geodetic and RTK), Total Stations, Digital Levels. Software & Programs
Civil 3D, Surfer, Trimble Geomatics Office, Leica Geo Office, ArcGIS, Pascal, land desktop