Post Job Free

Resume

Sign in

Piping /HVAC / QA - QC /Instrumentation / Ducting

Location:
Almaty, Almaty Province, Kazakhstan
Salary:
6000 US Dollar
Posted:
September 04, 2017

Contact this candidate

Resume:

Dear Prospective Employer,

I would like to apply with your company for the position of Piping /HVAC / QA - QC /Instrumentation / Ducting / material coordination and third party inspection for fabrication Installation and maintenance, and PROJECT CO-ORDINATOR. The attached resume covers my 20 plus years of Piping, HVAC Erection, HVAC Maintenance, Ducting, Piping Maintenance, Installation, Instrumentation, Commissioning, Pre-Commissioning, Inspection, Star-Up, Handover & Maintenance experience, Electrical works, PROCURMENT & MATERIAL COORIDNATION, outlines my abilities as a leader and Representative of Company and knowledge of Auto Cad and Revit and other Software.

Specification, DW-144, DW-143, SMACNA, ASTM. ASHRAE,

And Snip ROK 4.02-42-2006. SNiP RoK 4.02-05-2001, Gost, GGTN, SNiP 2.04.14-88 etc.

Address: 6th Kumbharwada, Kharwa Cross Lane, 4th Ansari Manzil, Room no. 12, Ground Floor, Mumbai 400 004. India.

Email: ac1468@r.postjobfree.com

ac1468@r.postjobfree.com

Mobile India: +919*********

Home India: +912*********

Residence Address

Avangart, Strret 3,

Building 33, Quarter 45,

Atyrau- 060001.

The Republic of Kazakhstan.

Home Kazakhstan : +771********

Mobile Kazakhstan: +770********

: +770********

In addition to, I speak English, Russian, Hindi and Urdu.

Mohammed Irfan Ansari

Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, third party and environmental impact studies, feasibility assessments

Review of Project specification and P&ID s Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.

Develop Construction Engineering Technology in line with Company Policy and Procedures.

Functional expertise in handling the production operations with key focus on bottom line profitability by ensuring optimal utilization of resources

Elaborates construction feasibility analysis evaluating the available materials & drawings.

experienced in managing the office activities like manpower recruiting, managing accounts, managing office staff there daily activities (monitoring) etc.to insure the preparation and submission of Mechanical Completion Certificates and Package’s (MCC) to COMPANY is as per Contract, plan schedule, Regulatory Authority (GOST, GGTN) and that all Certification Documents (Engineering/ Procurement/ QA/QC) are Traceable and complies with Project Specification.

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.

Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports

Assist Design Department in solving Piping Modification and Technical Problems in the Field

Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location and orientation.

Preparation of “AS BUILT” drawing Preparation of field piping system test packages, including system limit on P&ID and piping Isometricss.

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

Ensure that hydro test reinstatement is to be done as per procedure.

Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.

Well experienced in managing the office activities like manpower recruiting, managing accounts, managing office staff there daily activities (monitoring) etc.to insure the preparation and submission of Mechanical Completion Certificates and Package’s (MCC) to COMPANY is as per Contract, plan schedule, ISO 9000, Regulatory Authority (GOST, GGTN) and that all Certification Documents (Engineering/ Procurement/ QA/QC) are Traceable and complies with Project Specification.

Installation, testing, pre-commissioning, commissioning & operation of Heating, Ventilation & Air Conditioning Systems comprising of Chillers, Ducting, Heaters, Humidifiers, Air Handling Equipment, HVAC, LC & LS Lines, Copper piping, Vasda piping system, chilled water piping, insulation of piping, Cladding of piping, installation of instrumentation piping etc.

Conducting materials inspection by its documents or with its physical Condition / match with client specification.

Preparation of weekly & monthly report and submit to Department Manager for the same.

Preparing closeout reports for MEP activities as per Projects requirements.

Preparing Method Statements, Quality Control Procedure, Inspection Test.

Following up with the Client for Approvals (materials, drawings and others).

Conducting materials inspection by its documents or with its physical Condition / match with client specification.

Responsible fabrication of Galvanized and Stainless Steel Ducts and equipment’s in factory supervises Technical work of employs, inspection, Quality.

Ensure that RoK PRC quality requirements are met prior to starting and during site work.

Ensure proper installations are done as per the approved design drawings and project specifications.

As Built Drawings & documents are prepared and that all activities are carried out in accordance with Company’s HSSE policies & procedures.

Estimation of resources required for installation in the form of manpower, machinery & materials.

Preparation of schedules for installation of HVAC systems including identification & mobilization of identified resources.

Ensures that the work is performed as per latest revisions of approved construction drawings.

Ensures that any deviation/ Non-conformance about any interference to work detected during execution, for referring to Field Engineering group Monitoring & Reporting of Daily Progress to Construction Manager and client.

Equipments, Compressors, Cooling Towers, AHU, FCU, piping and control systems & Ducting work. Ensures that all records of the works carried out are maintained.

Ensures that all Construction of HVAC systems are carried out in accordance with the Company's safety policies and procedures and as per specification.

Ensures that appropriate safety and protective equipment is used by Company & Contractor staff during Construction and that all accidents and incidents are efficiently reported as per requirements

Performs Emergency Response Role as required by company.

Modification of drawings ducting, chilled water pipe lines, copper lines, Instrumental piping & tubing.

HSE

Compliance with all HSE policies and processes and HSE performance criteria.

Assist in the delivery of milestone zero – No LTI

Contribute to the issuance of STOP observations

Reporting of near misses

Participate where required on HSE shop visits.

Assist in monitoring HSE compliance (PPE, Equipment, etc.) as part of Quality surveillance and audit activities

Report areas of concern to Company HSE personnel.

Worked in oil project – “Kashagan Experimental Development Project” ON Shore (Eskene West) as Piping HVAC Piping Installation and Instrument of Satellite Buildings, sub Stations, FTR Buildings (Felid Temporary Refuge Building) for AGIP KCO. The experience includes:

1.To study the construction drawings and guide civil construction people to put cut-outs in the wall during construction for piping, HVAC piping, ducting work etc.

2.Deciding the inspection points in the piping system installation and getting its approval.

3.Installation, insulation and testing of ductwork, AHU, Extractor fans, chillers, Instrumental Pneumatic Air system, chilled water pipes lines, portable water line, Humidifiers, Drain lines etc.

4.Ensures that the work is performed as per latest revisions of approved construction drawings.

5.Ensures storage & preservation of equipment / materials as per recommendation of manufacturers/ Contract specifications through Preservation Supervisor/ Warehouse.

6.Ensures that all Construction of systems are carried out in accordance with the Company's safety policies and procedures. Ensures that appropriate safety and personal protective equipment is used.

7.Installation of Instrumental cubic panels (fire &gas, telecommunication, DCS ESD Marshaling, power distribution etc. In SIS buildings).

8.Installation of pneumatic air system, Skid Compressor system, actuator, valves extractor fans, fire dampers, fire & Gas damper and blast dampers etc.

9.Tasting pneumatic lines, chilled water pipes line, vesda lines etc.

10.Installation, tasting of Low condenses & Low steam pipelines of heating system.

11.Commissioning and pre-Commissioning of piping Systems,HVAC system, Startup, final work down and Handover.

Maintenance on chillers, chilled water pumps, A.H.U, F.C.U., Fresh air unit, Exhaust Fan, Ventilation, & Pressurizing pumps.

Maintenance, Installation, and Modification of Capacitor Bank of different types.

Installation on GTN Carrier Chillers.

Take over and Hand over building projects with clients and Companies.

Worked on the palaces Installation and Commissioning of Chillers, F.C.U., A.H.U, Chilled water pumps, Exhaust fans, Solar system, Hot water system Humidifiers, and V.A.V system.

Termination & Installation of Electrical Panels, Cable Pulling, High & Low Voltage Chillers, A.H.U. F.C.U. and V.A.V. Systems etc.

B.M.S. System Installation & Commissioning, Panels, Wiring (Switches, Sensors) For Chillers, A.H.U. F.C.U. and V.A.V. Systems etc.

Maintenance of Commercial Buildings.

Worked on World’s largest Refrigeration Piping Plant in Mecca for Slaughter House for Installation.

Ducting, Fabrication, erection Installation & Commissioning and Air balancing.

Employment History :

Country : Kazakhstan Atyrau, Tenigaz, Akatau.

Project : Eskene West Railway Project, TCO, ERSAI, OPPB, Renco.

Company : NSG

Period : October 2015 to Still working…

Designation : Senior QA / QC Engineer of Projects

Country : Kazakhstan Astana

Project : Abu Dhabi Plaza / Expo 2017 /and Astana city

Company : ZalStroyServicePlus

Period : November 2014 to July 2015

Designation : Project Site Engineer

Country : Kazakhstan Almaty

Project : Maintenance

Company : Philip Morris Kazakhstan LLP

Period : May 2014 to September 2014

Designation : Mechanical Department In charge

Country : Kazakhstan Astana

Project : Abu Dhabi Plaza and Astana City

Company : ACCM01

Period : May2013 to April 2014

Designation : HVAC & Piping Department In-charge

Country : Kazakhstan Atyrau

Project (Eskene West) : Kashagan Experimental Development Project”ON

Company : RENCO - KAT CONSTUCTIONS LLP

Period : September 2007 to March 2008.

March 2009 to November 2012

Designation : Supervisor / Instrumentation / Piping / Ducting/ HAVC.

Country : India Mumbai

Project : Maintenance, Installation and Erection

Company : CLASSIC COOLING SYSTEMS

Period : April 2005 to September 2007

Aril 2008 to February 2009

Designation : HVAC Pipping Site Engineer

Country : United Arab Emirates Abu Dhabi, Dubai.

Project : Maintenance and Projects

Company : AL- JADEED CONTRACTING ENGINEERINCOMPANY

Period : October 2001 to February 2005

Designation : HVAC Supervisor / Installation Department In charge

Country : Saudi Arabia Riyadh

Project : Installation / Maintenance

Company : AL-OWAIDHA GROUP OF CO. Pvt. Ltd. (Saudi Arabia)

Period : August 1997 to September 2001

Designation : HVAC Piping / Ducting/ Engineer.

Country : India Mumbai

Project : Maintenance

Company : SUPER CHILLERS

Period : August 1994 to July 1997

Designation : Piping / HVAC Project

Country : India Mumbai

Project : Hotel Maintenance

Company : Hotel Sea Princess

Period : August 1993 to July 1994

Designation : Hotel Maintenance IN charge.

As Employer

Country : Kazakhstan

Cities : Atyrau, Astana, Almaty, Aktobe

Company : MEY International

Period : April 2013 to May 2015

Designation : Executive Branch Director.

Distributer of Scaffolding (Krause), PPE, Nexans Cables, Teksan Electrical, HVAC Equipment, Piping, Ducting Machinery (Auto Line, Plasma Cutter, elbow-maker, Round Duct Machine Lock Former, Pittsburgh Lock Machine, Universal Swaging Machine etc.), Sheet Metal, RIDGID Tools, L&T (Larsen & Toubro) Electrical Contractor, Drainage Gutter (Gidrolica) System, Logistic LeeWard.

Personal Information:

Place Of Birth: : Mumbai India

Nationality : Indian

Date of Birth : 12/06/1974

Marital Status : Married

Passport Details : Pass port No : M 1471880

Issued Date : 01 - 09 – 2014 Expire Date : 31 -08 – 2024

Interest : New technology, New projects & Difficulties.

Hobbies : Cricket, Computer, Travel, etc.

Possess residence card of Kazakhstan

Educational Qualification:

Passed S.S.C. in March 1991 PUNE BOARD.

Technical Qualification:

Passed 2 years I.T.I (National Council for Vocational Training) in 1993 in HABIB TECHNICAL INSTITUTE. (N.C.V.T.).

Passed 1 year N.C.T.V.T. (National Council for Vocational Training) in 1994 in HOTEL SEA PRINCESS.

Passed 3 years Mechanical Diploma in 1997 from The ALIGARH MUSLI M UNIVERSITY.

Additional Qualification:

Completed MS Office 95, 97, 2000 & 2003 from SAK COMPUTERS.

Completed Auto Cad 2002 in First Class from SAK COMPUTERS.

Completed Auto Cad 2008 & 2009 In St.Angelo’s Computer Education (ISO 9001:2000 Certified Company)

Award Received:

Training in LG. ACADMEY UAE in Dubai for the tropical System as Engineer.

Training Completed for AGIP KCO Level 2 Signatory to Permit to Work course GEOO.HSE.PR002.000 Revision: A06 at Kashagan in Karbatan Project.

Training Completed for AGIP KCO Level 2 Signatory to Permit to Work course GEOO.HSE.PR002.000 Revision: A07 at Kashagan in Karbatan Project.

Sweet Gas Training.

Possess permit to work for On Shore Eskene West.

I wish to join your esteemed organization as Piping / HVAC / QC /Instrumentation / Piping / Ducting / material coordination and third party inspection for maintenance, and PROJECT CO-ORDINATOR. I promise to be dedicated to make your work area the safest and work hard for the appraisement of the company.

Thanking You, Yours Respectfully

iRFAN



Contact this candidate