PT. SAS International as Fabrication Coordinator
PT. Tripatra Engineering & Construction as Senior Engineer of Dept. Mechanical Static.
PT. SAS International as Project & Design Engineer
PT. SAS International-BBI Joint Operation as Design & Site Engineer. (Calculation of Pressure Vessel, Tank and Heat Exchanger).
PT. Daekyung Indah Heavy Industry as Staff Engineering (Design) Strength Calculation with Software Compress ex: Heat Exchanger, Pressure Vessel, Drum, Tower, and Tank. Project Experiences on PT. SAS International
Petrochina BCD-466, Supply & Installation of BGP 3rd Condensate Stripper Overhead Compressor, 3rd Memguard/Molsieve Towers & Filters, 3rd Membrane Unit and EMS Packages. Jabung – Jambi (April 2016 - Present) Gas Plant
- Review Quotation from Vendor
- Technical clarification of scope and able to project schedule
- Review Strength Calculation, Drawings & procedures
- Manage and monitoring fabrication
- Ensure that all procurement is made in compliance with project requirement such as specification, documents and time delivery.
- Witness for hydrostatic test and FAT
- Execution project at field for installs equipment to connecting with piping.
- Communication with all discipline to ensure project is clean and accordance with time delivery schedule
Project Experiences on PT. Tripatra Engineering & Construction ENI-Jangkrik Complex Project, Floating Production Unit (FPU). Jangkrik Field (also abbreviated as JKK) is a gas discovery made in March 2009. It is located about 70 km from the coast, in the Muara Bakau permit area, Makassar Strait, offshore Borneo of Indonesia, at a water depth ranging from 250 to 500 m. Eni, through its Indonesian subsidiary, operates the Muara Bakau PSC with a 55% interest, in joint venture with GDF Suez, holding the remaining 45% interest.
(12 May, 2014 – Jan 2016)
- Review Quotation from vendor
- Prepare & Clarification TBE (Technical Bid Evaluation) for Shell & Tube Heat Exchangers and Seawater Outfall Vortex
- Prepare Technical Data Sheet of STHE and Seawater Outfall Vortex
- Review P&ID
- Estimate weight and load for ensure transportation and lifting
- Strength Calculation of equipment static include transportation load from fabricator to site
- Prepare IDS (Inspection Data Sheet) and RDDS (Required Documentation Data Sheet) for STHE & Seawater Outfall Vortex
- Review document vendor, such as strength calculation, drawings and procedures
- Communication with all discipline to install and connecting
- Execute on Karimun site to installation of equipment, especially for static equipment. INPEX MASELA, Ltd. The FLNG FACILITY is designed to remain on-site for the entire design service life of thirty (30) years without need for dry-docking and for sales production capacity of 2.5 MTPA + within 10% of LNG comprising. Has engaged Contractor to perform FEED for development of a FPSO vessels an LNG plant known as “FLNG FACILITY” for the Abadi Gas Field Location.
(8 April, 2013 – 9 May, 2014)
- Reporting to the Lead Static Equipment Engineer, the main functions of the role will be to Carry out Thermal and Mechanical Design of the equipment
- Prepare Equipment Mechanical Datasheets and Strength Calculation
- Prepare Inspection Data Sheet of Pressure Vessels, Shell & Tube Heat Exchangers, and Plate Heat Exchangers.
- Evaluations as per relevant Technical Practices
- Follow the Ethics of Confidentiality on technologies licensed by Client or Third Party
- Ensure Project Filing is maintained as per Quality Procedures
- Liaise with other Groups as necessary
- Ensure Timely Production of Deliverables
- Carry out Proper Closeout of all Project related work ENI - FEED FPU (Floating Production Unit) JANGKRIK (Saipem–Tripatra–HHI JO)
(3 September 2012 – 5 April, 2013)
The concept studied in this FEED foresees:
- 7 Subsea Wells for JKK tied back to the FPU
- 4 Subsea Wells for JNE, tied back to the FPU (as option)
- A Barge Shaped FPU, performing Full Offshore Process;
- Export treated gas and condensate to onshore near Sapi existing plant.
- Prepare List of all equipment static.
- Review design Pressure Vessels & Heat Exchangers
- Analyzing data and information using valid methods
- Estimate weight and load for ensure transportation
- Prepare Technical Specification of Pressure Vessel
- Prepare IDS of Pressure Vessels and Heat Exchangers
- Prepare RDDS of Pressure Vessels and Heat Exchangers
- Strength Calculation of equipment static include transportation load from fabricator to site.
- Communication between process team and static for ensure design of FPU. PHE ONWJ (Pertamina Hulu Energy Offshore North West Java) as Engineering & Integrity
(12 March, 2012 – 31 August 2012)
I have handled some project such as:
- Estimate man hour and material
- Prepare schedule for shutdown area
- Making continual improvement of products, processes and systems an objective for every individual in the organization
- Establishing goals to guide, and measures to track, continual improvement
- Analyzing data and information using valid methods
- Making decisions and taking action based on factual analysis, balanced with experience and intuition
- Control system by system on scope and make construction language Project Experience on PT. SAS International (January, 2010 – March 2012): Modification of BGP Heat Exchanger - Lean Amine Trim Cooling Service; TAG NO. 610-E-107B ~ (BCD-434(R)-CA) - PetroChina International Jabung, Ltd
(December 16, 2011 – Feb, 2012)
Job description:
Supervising and technically directing a small single discipline team of engineers and designers
Prepare documents for bid Committee (Proposal)
Review new inquiry/tender files
Prepare planning & schedule input to Estimate Confidence Packages and project plans for classified estimates
Overall control on review of different levels of schedule presented by user
Make and reviews progress report for accuracy of progress measurement
Technical design (drawing and strength calculation)
Prepare progress Engineering and Production
Supported technical team, ensure the work process is implemented and communication within the team.
Check the construction works to ensure the construction is performed in accordance with project technical requirement and schedule
Communication with client and vendor for ensure all documents as per specification
Aware in planning, progress monitoring, forecasting and reporting
Prepare of project specification, such as NDE Procedure, Fabrication Procedure, etc.
Prepare documents for approval and document for construction
Ensure for the Vendor of the inspection and fabrication
Ensure that all procurement is made in compliance with project requirement such as specification, documents and time delivery.
Witness for hydrostatic test and FAT
Coordinator of execution project at field for installs this equipment to connecting with piping. Supply of Propane Condenser Replacement; TAG NO. 920-E-101B – (BCD-395(R)-CA) PetroChina International Jabung, Ltd, (January 2010 – February 11, 2011) Job description:
Supervising and technically directing a small single discipline team of engineers and designers
Prepare documents for bid Committee (Proposal)
Technical design (Data Sheet and Assembly drawing)
Check, review estimate and summarize base cost
Prepare technical specification to be issued with RFQ to vendor/sub contractor
Request and expedite the required data from Engineering and other related departments
Review drawing and strength calculation
Prepare progress Engineering and Production
Prepare of master schedule
Supported technical team, ensure the work process is implemented and communication within the team
Aware in planning, progress monitoring, forecasting and reporting
Prepare of project specification, such as NDE Procedure, Fabrication Procedure, etc.
Prepare documents for approval and document for construction
Ensure for the Vendor of the inspection and fabrication
Ensure that all procurement is made in compliance with project requirement such as specification, documents and time delivery.
Witness for hydrostatic test and FAT
Communication with client and vendor for ensure all documents as per specification Replacement In Kind of Cold Box Chiller (Expander Cold Box Chiller and Absorber Overhead Chiller; TAG NO. 655-E-101/104 (BCD-400-CA), (March 2010 – May 15, 2011) Job description:
Prepare documents for bid committee (Proposal)
Prepare documents for approval and documents for construction
Technical design (Assembly drawing)
Prepare planning & schedule input to Estimate Confidence Packages and project plans for classified estimates
Coordinator of execution project at field for handling, cold insulation and installation
Review list of material and sub-vendor list
Review drawings and strength calculation
Ensure that all procurement is made in compliance with project requirement such as specification, documents and time delivery.
Managing all aspects of discipline design and engineering project activities including multi- discipline aspects
Overall control on review of different levels of schedule presented by user
Make and reviews progress report for accuracy of progress measurement
Communication with client and vendor for ensure all documents as per specification
Supervising and technically directing a small single discipline team of engineers
Prepare tools and all documents for the shipment and make erection procedure.
Prepare equipment of the Cold Insulation.
Check the construction works to ensure the construction is performed in accordance with project technical requirement and schedule
Ensure documents of the Cold Insulation for approval to client Project Experience on PT. SAS International – BBI Joint Operation (January, 2009- January, 2010):
Amine Product Exchanger (SK-25-E-01), Stabilizer Reboiler (SK-35-E-03), & Amine Reboiler (SK- 25-E-06) ~ PERTAMINA – HESS Jambi Merang Development Gas Production Facilities PT. TRIPATRA
(January 2009 – January 2010)
Job description:
Supervising and technically directing a small single discipline team of engineers and designers
Prepare the documents for approval and documents for construction
Technical design (data sheet and drawing)
Communications with client for ensure all documents as per specification.
Prepare of project specification document
Managing all aspects of discipline design and engineering project activities including multi- discipline aspects.
Review drawings and documentation such as Mill certificate etc. MITSUI & Co, Ltd
Paiton Expansion Project (August – December 2009)
Job description:
Design Calculation of Pressure Vessel and Tank (Package)
Supported by technical team, ensure the work process is implemented and communication within the team.
Prepare the document for approval and construction
Check drawing and document such as Mill certificate. Project Experience on PT. Daekyung Indah Heavy Industry (2006 – 2008): PT. Rekayasa Industri
(October – December 2008)
Job description:
Design Calculation of Pressure Vessel and Heat Exchanger
Prepare weekly and monthly progress report
Prepare the document for approval and document for construction
Technical design (Data Sheet & Technical Drawing)
Prepare of project specification document.
PT. Amoco Mitsui PTA. Ind
(June - December 2008)
Job description:
Design calculation of Tower
Prepare the document for approval and document for construction
Communication with client for ensure all the document as per specification
Prepare of project specification document.
Review drawing and document.
Supported by technical team, ensure the work process is implemented and communicate within the team
Custom complain report
Prepare equipment requisition, specification, data sheet, drawings, calculation, and technical recommendations.
Ensure that all procurement is made in compliance with project requirement such as specification, documents and time delivery.
PT. Asahimas Chemical
(February – June 2008)
Job description:
Modification part of Heat Exchanger, such as Tube, Pass Partition, Baffle, and Tubesheet
Supported by technical team, ensure the work process is implemented and communicate within the team
Technical design (Data Sheet and Drawings)
Customer complain report
Review drawing and document
Assistant coordinator of execution project at field
Visit to supplier factory for performance test equipment
Prepare of project specification document
Communication with client for ensure all the document as per specification
Ensure that all procurement is made in compliance with project requirement such as specification, documents and time delivery
Chiyoda Corp.
(November 2007 – March 2008)
Job description:
Prepare the document for approval and document for construction
Technical design (Data Sheet & Technical Drawings)
Review drawing and document
Prepare of project specification document.
ABB LUMMUS (1 package)
(August 2007 – April 2008)
Job description:
Design calculation of Pressure Vessel, Tank and Drum
Prepare equipment requisition, specification, data sheet, drawings, calculation, technical recommendation
Prepare weekly/monthly progress report
Prepare the document for approval and document for construction
Technical design
Review drawing and document
Supported by technical team, ensure the work process is implemented and communicate within the team
Customer complain report
PT. Asahimas Chemical
(March – July 2007)
Job description:
Design calculation of Heat Exchanger
Prepare weekly progress report
Prepare the document for approval and document for construction
Technical design
Communication with client for ensure all the document as per specification
Prepare of project specification document
Review drawing and document.
Visit to supplier factory for performance test equipment. PT. Alkindo Mitra Raya
(February – April 2007)
Job description:
Design Engineer
Repair Ellipsoidal Head on shop
Prepare weekly and monthly progress report
Prepare the document for approval and document for construction
Technical design
Witness for Hydrotest
Visit to supplier factory for performance test equipment
Prepare of project specification document
Communications with client for ensure all documents as per specification. Educational Background
University : Indonesia Institute of Technology, majoring in Mechanical Engineering subject Manufacturing. Specification of thesis Reduction Thickness to Cold Rolling Process Effect with Hardness and Material Micro Structure Modification Alloy Cu-Zn, with ASTM C38500 Standard. Objectives : Hard worker, adaptive, highly self motivated, dynamic, creative, able to work in team or individual also in under pressure due to deadline. Trainee : First Aid & Fire Fighting, PATI (Perhimpunan Ahli Teknik Indonesia) Software skills : Microsoft office (word, Excel, Microsoft project), Visio drawing. Compress Software, PV elite, E-Tank and Auto Cad.
Familiar with ASME, TEMA, API,& also familiar with global communication such as mail and local network.