J.Kumar CRTG JV DMRC CC-24 Project, Delhi, India
CC-24 Project: Design & Construction of Tunnel by Shield TBM, Stations and Ramp by Cut & Cover method between Lajpat Nagar and Hazrat Nizamuddin Stations (Both including) for underground works on Mukundpur-Yamuna Vihar Corridor of Delhi MRTS Project of Phase-III
Graduate Engineer Trainee – Civil, 21 September 15 to Present – 1 Year 7 Months RESPONSIBILITIES HANDLED
Responsible for constructional work of “Cross Passages for passengers emergency evacuation design” between two MRTS running tunnels by TAM Grouting, Fore polling & NATM method for DMRC CC-24 Project
Constantly checking, preparing checklists and maintaining the construction sequence.
Responsible for after tunneling and finishing works.
Planning and execution of works as per design & drawing
Maintaining quality standards for all structural works
Preparation of daily, weekly, monthly, reports on work progress & evaluating as per planned schedules.
Supervision of working labour & subcontractors to ensure strict conformance to methods, quality & safety
Preparing BBS & Executing steel as per approved structural design
Client billing & Subcontractor billing
Material arrangement and quantity surveying
ACCOMPLISHMENTS
Construction of 1 Nos. Cross Passage tunnel 9 m length Between 2 MRTS running tunnels by Forepolling, Tam grouting and NATM excavation method with geotextile waterproofing and crystalline concreting
Individually handled construction of 1 Nos. Cross Passage 9.5 m long with sump by cut and cover method by installing 28 Nos. CBP piles, fixing of strut & waler 5 levels and manual excavation upto 25 m deep.
Fixing of permanent GI walkway in tunnel 805 m for DMRC CC-24 project
1st stage invert concrete in tunnel with shear connectors 3174 m
Fabrication & Erection of temporary rings to support main tunnels
Finishing works in tunnel, repairing works, secondary grouting, Pu grout and Handover of 2574 m long tunnels access to track contractor.
Academic Projects:
Analysis of design proposed by Meccaferri consultancy of reinforced soil embankments for N.H.A.I four laning of Kiratpur- Nerchowk Project
Detailed study on construction of cross passages between 2 MRTS tunnel of DMRC CC 24 Project and FEM Analysis using Plaxis 3d tunnel software.
Design of prestressed concrete bridge