Post Job Free

Resume

Sign in

Manufacturing Engineer

Location:
Detroit, MI
Posted:
June 24, 2017

Contact this candidate

Resume:

Ninad Oak

**** **** ******, *** *** Detroit, MI *8201 Ph.: 806-***-****

ac0zyd@r.postjobfree.com LinkedIn - https://www.linkedin.com/in/ninadoak/ SUMMARY

To secure full-time position in Industrial engineering which can utilize my knowledge for the benefit of the organization ACADEMIC QUALIFICATION

M.S. Industrial Engineering (GPA – 3.4) – Texas Tech University, Lubbock, TX (May 2017) Related Coursework - Advanced Manufacturing, Statistical Data Analysis, Manufacturing Facilities and Planning, Loss Assessment, Simulation with Arena, Reliability Theory, Project Management, Principles of Optimization B.S. Mechanical Engineering – University of Pune, India (May 2014) SKILL SET

Kaizen, 5S, Line Balancing, Pareto analysis, FMEA, PPAP, GD&T Engineering software – AutoCAD, CATIA, Pro-Engineer, Solidworks, Arena, MS Project, Minitab, Visio, PTC Creo, Programming Language – SQL, R programming, MATLAB

Utilities – MS-office

RELATED WORK EXPERIENCE

Trainee Engineer at Metalcraft, Pune, India June 2014 – July 2015

• Assisted in implementing and improving the standard operating procedures

• Prepared models in AutoCAD and Pro-E in accordance with customer requirements

• Reduced downtime by assisting in troubleshooting activities

• Maintained a clean and organized workspace to minimize unnecessary movement of workers (5S)

• Prepared Bill of Materials (BOM) required for the product

• Gained primary knowledge of GD&t and PPAP

Student Assistant at Texas Tech University Hospitality Services, Lubbock, TX Oct 2015 – May 2017 Process Intern at Whirlpool of India Ltd, Ranjangaon, Pune, India June 2016 – Aug 2016 Productivity Improvement of Assembly line

• Participated in Line balancing activities by conducting extensive time studies along the assembly

• Listed Value and Non-Value-added activities and removed non-value adding activities

• Calculated Capacity of line, Takt time, compared takt time with average process times to identify bottlenecks

• Provided proposals with better man management, reduced workstations, and better line efficiency

• Line Balancing reduced man hours by 15%, Identified bottlenecks, increased line efficiency, and reduced idle time Quality Improvement on Refrigerator Thermoformed Liners (Bottleneck process)

• Analyzed production data of three months from thermoforming machine for defects

• Key Input and Output variables were used to generate cause and effect matrix

• To narrow down results pareto analysis was done to find causes for 80% of defects

• FMEA was done to further identify high risk cases

• Defects were reduced by 30% due to this exercise ACADEMIC PROJECTS

Graduate

1. Manufacturing Facility & Planning – Facility Design Project Aug 2015 - Nov 2015

• Designed facility layout for machine shop, cafeteria, parking lot, restroom, and offices of a Cotton Industry; with a total area constraint of 60,000 SF

• Modeled the solution using methodologies of Graph-Based Method, TCR, Weighted Least Square

• Executed the Graph Based Methodology layout for facility using AUTOCAD and saved 2850 SF for future development, without disturbing outputs and productivity 2. Project Management Course Project Aug 2016- Nov 2016

• Launched a new product called ‘Cordstrictor’ with a sole purpose of developing easy cable management systems for critical service environments

• Used Scheduling techniques like Gantt charts, precedence diagrams, CPM, PERT to calculate min days for the project

• Conducted economic feasibility study, risk analysis, quality management on the project Undergraduate

1. Applying a magnetic field on liquid line of vapor compression system is a novel technique to increase the performance of the system Aug 2013 – May 2014

• Got a reduction in energy use for chiller of 15 Liter

• COP was improved by up to 21% for hydrocarbon refrigerants

• Publication link- http://www.sciencedirect.com/science/article/pii/S0306261916312296# 2. Experimental investigation on freeze concentration system Feb 2014 – May 2014

• Publication link- http://www.ijaiem.org/Volume4Issue7/IJAIEM-2015-07-05-4.pdf CERTIFICATES

SIX SIGMA GREEN BELT, SQL Basic, Introduction to supply chain management, Process Improvement HONORS AND ACTIVITIES

• Recipient of Graduate School Scholarship, Texas Tech University 2015-2017



Contact this candidate