Post Job Free
Sign in

Technical Expert / Project Manager

Location:
San Juan, Puerto Rico
Salary:
100,000
Posted:
June 17, 2017

Contact this candidate

Resume:

787-***-****

E-mail: *************@*****.***

ANGEL A. VEGA, PE 14304

SUMMARY

For over 20 years, have been leading technical teams to assure reliable equipment and process in Pharmaceutical Operations as well as compliance to applicable regulations. Among the most remarkable achievements are: driving a culture change implementing Lean Manufacturing across a manufacturing site, Improve critical equipment reliability, increase manufacturing / packaging processes available time and elimination of process defects. The experience includes the technical support to process related to: granulation, blending, tablets compression and coating, capsules filling, suspensions preparation and packaging of blisters and bottles with vision systems for inspection of labels and printing. The activities executed includes: troubleshooting of systems, interaction with quality operations to document all events related to manufacturing batches, Investigation of non-conformances and deviations, CAPA management and customer complaints. All these using the lean sigma tools. During the process I have developed knowledge in quality systems to document changes to equipment and systems. This includes: risk and cleaning assessment, qualification protocols, SOP and training. As additional roles during my career have executed key roles in the implementation of strategical projects for the organization like transfer of new products and the validation and start up of a new manufacturing suite. Also, have been named as SME for Maintenance, Calibrations, Facilities Design and Utilities Quality Systems. All these experience have help to develop a strong technical skills and broad knowledge of Equipment Reliability, Process Improvements and regulations to be in compliance with GMP, Safety and Environmental.

EDUCATION

BACHELORS DEGREE OF SCIENCES, ELECTRICAL ENGINEERING

University of Puerto Rico, Mayagüez Campus

COMPUTER SKILLS

BAS, SAP, MAXIMO, MIDAS, DCA, Autocad, Mini tab and Microsoft Office.

SKILLS

LICENSED ENGINEER (CIAPR) PROCESS INVESTIGATIONS

RCM FACILITATOR MANAGEMENT OF CHANGES

TOYOTA KATA COACH EQUIPMENT VALIDATION

SMED TRAINER PACKAGING INSPECTION SYSTEMS

VFD AND PLC APPLICATIONS SOLID DOSE MANUFACTURING

NFPA 70, 70E RISK ASSESSMENT

LEAN SIGMA PROJECT MANAGEMENT

EXPERIENCE

FITS, INC.

Manati, PR

Project Manager

August 2016 – May 2017

oAssure design of Hygienic Utilities (WFI, Clean Steam, Air, Nitrogen) comply with company specifications. Approve drawings and components recommended by designer

oSupervise construction and installation of Hygienic Utilities Systems and HVAC

oPerform systems start up and recommend fine tuning for operational parameters

oDesign process for WFI tank and loop sanitation

oDevelop solution for non-conformance conditions identified including documentation of changes

oApprove contractors Turnover Packages

oAssure all systems SAT, IOQ and PQ were executed

oPerform investigations for discrepancies identified during validations

oDevelop procedures for systems operations and sampling processes

DMCG

Arecibo, PR

Reliability Engineer

May 2015 – Aug 2016

oImplemented recommendations to assure tanks, vessels and piping in a Chemical Process Facility comply with API 510, 570 and 653 as well as ASME section 8

oDeveloped and implemented plan to assure chemical processes interlocks are tested

MERCK & CO

Arecibo, PR

Utilities Coach

Jan 2014– May 2015

oManage Site Utilities Operating Budget. Improved it from $7.2MM to $5.4MM.

oUtilities Systems SME. Assure water and compressed air systems are in compliance with company guidelines and regulatory agencies.

oPerform routinely interventions to system to test filters, perform chemical cleanings, replace gaskets and refurbish valves and pumps

oPerform investigation for test non-conformances and operations deviations. Implement CAPA as required

oComplete refurbish of a water distillation unit

oReplacement of a Water Softener unit

oConfiguration of automatic alarm level for conductivity monitoring

oModification USP water Cold loops operating sequence to be maintained within sanitization temperature while not in operation

oManage project for chilled water demand flow to control 17 AHU’S and Chilled water system equipment from BAS

oRecycling Water Project. Investment of approximately $40,000. Achieving reoccurring savings since January 2016 of $7,000 per month

oModifications to a 400HP boiler control system to operate in Low fire. Savings of 100 diesel gallons per day.

oImplemented a strong safety culture by assigning specific goals to team members in hazards identification and correction. No accidents in two years.

oLead site assessment and implementation of measures to be in compliance with NFPA 70E Arc Flash regulation and Machine Guarding.

Technical / Maintenance Expert

Aug 2005 – Dec 2013

oTechnical and Maintenance Support to Manufacturing Processes consisting of Granulation, Tablet Compression and Tablet Coating and Packaging. Systems Troubleshooting, Process defects and critical alarms investigations, CAPA and continuous improvements

oDeveloped maintenance technicians Capabilities Matrix to assure all the skills and knowledge necessary to provide manufacturing processes support.

oSupport to the introduction of 2 new solid dose products. Assure new facilities were aligned to site engineering procedures, design of maintenance strategy and technical support during qualifications and validations

oImplementation of peristaltic pumps to replace gear pumps in precision tablets coating process. Installation, control system tuning, Qualification, SOP

oCoached team for Tablets coater and gear pumps cleaning process modification. Risk and cleaning assessment, SOP and Cleaning forms revision

oUtilities and Maintenance lead in the construction of a new manufacturing suite. Approval of design and qualification protocols, FAT execution, verification of mechanical completions, PSSR and Start up.

oImplemented process for Management of Replacement Parts

oLed the Maintenance process stream in the SAP implementation. Design and SOP approval. Test execution.

oTechnical support during the automation of a blisters packaging line. FAT, SAT, IO/OQ, SOP and Modifications during start up

oDeveloped procedure to test high voltage magnetrons in a granulation/drying machine

oDesigned wiring, installed and qualified replacement for VFD obsolete models

oUpgraded speed control of a tablet press machine. From a mechanical system to VFD / PLC controlled. Installation, start up, qualification, SOP and training.

oLead a team to reduce under filled bottles and broken tablets customer complaints. Investigations, Root cause analysis, identification of actions, implementation and documentation of changes

Lean Six Sigma Project Manager

Nov 2004 – Aug 2005

oWorked with a team responsible Lean Manufacturing through the organization which enabled over $3MM in spending reduction over a 3 years period

oLed packaging line change over improvements. Identified opportunities, risk assessment, cleaning assessment, design of new process, implementation of changes and new SOP.

Maintenance Manager

June 2000 – Nov 2004

oResponsible to build and lead a team of Engineers and Technicians for the maintenance of Manufacturing, Packaging and Facilities.

oManaged Site Maintenance operating budget of 8.4MM

oImproved maintenance operations spending by $1.6MM in 4 years

oProvided technical support on process investigations related to equipment failures

oRedesigned Site High Voltage Distribution System maintenance

oImplemented PdM techniques for conditions based maintenance to eliminate 20% of PM workload and reduction in overtime by 50%

oAchieved savings over $500,000 in equipment parts replacement

oImplemented Mechanical Integrity Program to comply to PSM regulation

oSaved $150k in Maintenance cost by avoiding contracts to execute HEPA Filters Testing, Air Ducts inspections, Stainless Steel Passivation and Heat Exchangers Cleaning

oUpgraded Plant Fire Alarm System

Process Engineer

Jun 1998 – June 2000

oResponsible for the technical support of a Manufacturing process. Investigate deviations and implement CAPA

oImplemented actions to reduced 50% of quality deviations in Capsule Filling Process

oIncreased 20% in Capsule Fillings Machines output. This enable the elimination of one operating shift

oExecuted validation for capsules manufacturing process and coating suspensions holding time

oExecution of new Capsule Filling Machine Qualification

oExecuted Y2K verifications and implemented remediations for Part 11 compliance to process equipment PLC and computers.

Marion & Co

MANATI, PR

Project Engineer

Jun 1993 – June 1998

oManagement of Facilities Capital Projects

oIntegration of new BAS (Metasys) to control site AHU’S, Chillers and Fire Alarms

oInstallation of a new 20,000 cfm AHU with dehumidifier

oReplacement of obsolete dust collectors

oInstallation of a new 1500 ton chiller

oExpansion of site security system

oInstallation of infrastructure for new LAN

oAutomation of 6 vacuum pumps operation

oWAREHOUSE lighting retrofit

oUpgrade manufacturing areas AHU dehumidification control system

oDesign and installation isolated electrical emergency system for Laboratory and Communications room

oInstallation and commissioning of a new cooling tower electrical system

oQualification of automated control loops in an Hydrogenation process

AV ENGINEERING

MANATI, PR

Electrical Designer / Inspector

oDesign of Substation and Electrical System Distribution for the following projects:

PRASA sewer water pumping station – Orocovis 2003

Colegio Peritos Electricistas new facilities – Carolina 2003

New Christian Church – Aguadilla 2004

New air conditioning for Catholic Church – Isabela 2005

New private apartment complex – Cabo Rojo 2006

New Medical Surgery Clinic – Cabo Rojo 2007

Catholic church activity center – Sabana Hoyos 2008



Contact this candidate