Post Job Free

Resume

Sign in

Project Management Mechanical Engineering

Location:
Gilbert, AZ
Posted:
June 05, 2017

Contact this candidate

Resume:

JOE MCKENZIE

**** * ********** **, ******* AZ ***97 480-***-**** ac0oo5@r.postjobfree.com

SUMMARY OF SKILLS AND PERSONAL STRENGHTS

10+ years with 2D & 3D design and Pre Construction experience, includes: Managing Sales, Marketing, Estimating, Engineering, Strategic business planning, ACAD MEP, CADmep Fabrication, Fab Pro, Navisworks Manage, Recap,

(Revit includes basic knowledge). File Management & Doc Control, Estimating, Change Orders, & Budgets. Competent with Coordination, Fabrication Drawings/Spooling, BOM and BOQs, P&ID. I have written Project Execution Plans for numerous Projects including BIM Standards for 4 different companies. Design IT and all VDC responsibilities, Project Management, I have been a welder of High Purity piping and I have installed pipe of all types, so my advantage is that I have worked on all phases to completion of the projects. BS Mechanical Engineering Oklahoma State University __Stillwater Oklahoma Do not currently have a PE, but definitely have getting it as a priority. I have owned a construction company and managed large numbers of employees. My background has had success with all titles and positions

COMPUTER SKILLS

Software

Auto Cad, Fab Pro, CAD MEP, CADmep Fabrication, ESTmep, Recap, Navisworks Manage, Revit, Scene, BIM360. All Autodesk Platforms

Microsoft Office, Bluebeam Revu, Outlook, Power Point, Clarizen, Skire

Design & Computer IT- Trouble Shooting, Software Installation License

Plumbing K-37 Dual commercial and residential contractors license AZ EXPERIENCE

8/15-2/16

1/15-5/15

12/13-10/14

Plumber - Brewer Enterprises

Piecework plumbing of the underground, Top Out phases I chose to do this and also have continued to help confidential companies with Engineering and VDC Design Coordination.

I have been with Brewer for 3 months now with hopes of helping their company to become more efficient and profitable. I am currently seeking to work with a more established company in a position to challenge my talents and background experiences with mechanical engineering, VDC, Project Management, Operations Management, Design Coordination and BIM expertise.

Operations Manager, Broadway Mechanical

Manage; Sales, Marketing, Estimating, Engineering, Detailing, BIM

Estimated High/Mid Rise Residential Plumbing and Mechanical Projects

Strategic business planning and expansion into diversified markets

Recruit and train new staff. Evaluate existing staff, recommend and write procedures for MEP Professionals, Engineers, Estimators, Cad staff, Quality Assurance, Mechanical Engineers and Project Engineers.

Set Procedures for Integrate Design/Build, Design/Assist and Plan Spec. process. Wrote BIM Standard and Project Execution Plan.

Conduct Value Management Sessions with Detailers and Draftsman, Alternative Systems analysis and phased construction planning.

Weekly Financial Reports and Reviews

Evaluate and implement sustainability initiativesWrote BIM Standard and Project Execution Plan. Summary: I changed the process from estimating to design coordination. Helped build a data base for ESTmep so the pass down from estimating to engineering, and then to design was smoother transition. This was proven to save numerous hours for each department by utilizing design, starting from estimating phase. This made it easier to keep to budget, and save money because engineering had a basic concept of how it was bid utilizing basic routing, material type, and most cases equipment. This helped cut time for the engineers due to the extra information utilizing ESTmep. Design then messaged routing and coordination based on designated zones or other obstructions. This was improvement based on old process of each phase scraping and starting over. Senior BIM Manager, Charter Mechanical

Semi-Conductor and Large Commercial Projects

Coordination Meetings with A/E

Clean Room Experienced

Managed the day to day tasks amongst the BIM and Detailing Departments. Meetings/ ARs/ Routing/ Coordination

Set Procedures for Integrate Design/Build, Design/Assist and Plan Spec. process

Project Management, Daily Log, Budgets, Sequencing of workflow

Created Background Models of the site, for Coordination.

Estimating and Change Orders for Semi-Conductor projects

Weekly Financial Budget Reviews.

Fabrication/Spool Drawings including BOM, BOQ, & QAQC, As-Built, Clash Reports & View Points.

Responsible for all Design IT, Doc Control and File Management

Wrote BIM Standard and Project Execution Plan.

Created Templates, Palettes, and Data Base Content

LEED

Training for all VDC professionals to add proficiency to the department. Helped save man hours based on process and software utilization.

04/13-12/13

Senior VDC Specialist, HP D.R.A.W

Semi-Conductor, Pharmaceutical and Large Commercial Projects

Coordination Meetings with A/E

VDC Design includes Process Piping, Mechanical, Electrical, and Architectural

Conduct Value Management Sessions with Detailers and Draftsman, Alternative Systems analysis and phased construction planning.

Project Management, Estimating, and Customer Relations and Marketing, Hiring and Layoffs of Employees

Estimating and Change Orders for Semi-Conductor & Pharmaceutical projects

Data Base Improvement, SQL

Model Coordination, Fabrication/Spool Drawings, BOM & BOQ, Clash Detection/Reports and Viewpoints and value engineering

Point Cloud, Scans used for Coordination and Design

Utilized Total Station surveying data to improve coordination and consistency of design coordination. 01/10-04/13

BIM Manager, Brycon Construction

Semi-Conductor and Large Commercial Projects

Project Management

Clean Room Experienced

Coordination Meetings with A/E

Recruit and train new staff. Evaluate existing staff, recommend and write procedures for MEP Professionals, Engineers, Estimators, CADD staff, Quality Assurance, Project Engineers and Field Engineers

Set Procedures for Integrate Design/Build, Design/Assist and Plan Spec. process.

Conducted employee Reviews

Project Review and weekly Financial Reviews. Pull Planning for sequencing of trades.

Mechanical Engineering, Sizing, Riser Diagrams, Flow Charts, Equipment Selection

PEP (Project Execution Plan) BIM Standard and Doc Control, File Management

Started from scratch and built the BIM Dept. up to 50 multi-discipline VDC specialists

VDC Design includes Process Piping, Mechanical, Electrical, and Architectural

Project Management, Estimating, Budgets and Customer Relations, Sequencing of workflow, Weekly Reports and Budget Reviews, Design IT

Fabrication/Spool Drawings including BOM, BOQ, & QAQC, As-Builts, Clash Reports & View Points.

Training CAD MEP-Fab Pro, Navisworks, Recap, and Survey Control to 3D

Point Cloud, Scans used for Coordination and Design

Took part in the Hiring Process and also Layoff

Improved Profits and Production

LEED & LEAN Construction Practices

Orbital welding and installation and PVDF welding and installation, also High Purity Pipe Bending.

I took this department from only myself and duplicated myself as many times as possible. Built my design team from 1 to 55 VDC professionals. Included training of software and design review. I built the Execution Plan and BIM Standards and work flow that kept my team above the curve under extreme schedules. 08/04-12/09

Owner/COO, CMAC Plumbing and Construction Inc.

Strategic business planning and expansion into diversified markets

Conduct Value Management Sessions, Alternative Systems analysis and phased construction planning

Lead presentations (By Outside Firm) and marketing, RFQ/RFP and Proposal leadership

Large Commercial, Multi Family, and Custom Homes

Coordination of Day to Day Functionality, Estimating, Change Orders, POs, Profit & Loss, Contracts

3D Design and Cad Layout/Coordination: Plumbing, Dry Mechanical, Architectural, and Electrical

Project Management, Scheduling,

Mechanical Engineering, Sizing, Riser Diagrams, Flow Charts, Equipment Selection

VDC Design includes Process Piping, Mechanical, Electrical, and Architectural

Installation of underground plumbing, top out and trim phases.

Take-offs and ordering materials

Design assist and turn key projects

Account Receivables, Payroll, Weekly Meetings with Management

Safety meetings and tool box talks.



Contact this candidate