Lewis F. Denison
*** **** **. ********, ** *****
Phone: 570-***-**** Home, 570-***-**** Cell
Email: *-****.*@*******.***
MANAGEMENT / SUPERVISOR / TECHNICIAN
An accomplished business professional with proven leadership and strong work ethic who prides himself on integrity, honesty, and personal accountability. Excellent problem solver who can determine root cause and come up with the solution to prevent future problems. An exceptional organizer and facilitator with outstanding communication and time management skills. Extremely self motivated and results oriented team leader that brings experience and diligence into the work place. Always looking for cutting edge technology to reduce overhead and increase the bottom line. Proficient with many computer software programs including Microsoft Excel, Outlook, Project, PowerPoint and Word, also proficient in SAP systems. Adept at learning new applications in a short period of time. Very strong team motivator who knows how to get the job done in both union and non-union environments.
PROFESSIONAL EXPERIENCE
Smart Watt Energy Inc. 2016-2017
Electrical Foreman
Lead a team of electricians for upgrade of lighting systems in various manufacturing facilities, office environments, and outside lighting areas.
Responsible for set-up of working lay down areas, provide access to lighting over manufacturing equipment and offices. Rebuilt, replaced or installed new LED lighting fixtures giving equal or above previous lumens with better electrical savings.
Keystone Automation, Inc. 2014-2016
Field Electrical Manager
Lead team of electricians for installation of electrical control systems and start-ups of machines. Responsible for fabrication of manufacturing machines to include specification and installation of mechanical, electrical, pneumatic, and hydraulic components. Responsible for overall project startup and commissioning.
Bilfinger Industrial Services 2005-2014
Construction Manager
Directly responsible for the installation of electrical projects up to $2.5 million in an industrial facility. Performed feasibility studies, design reviews, and risk assessments. Responsible for creating project schedules, directing labor, and conducting safety and project meetings. Coordinated outages and equipment downtime with the operating plant. Responsible for safety and security for multiple projects.
Highlights of achievements:
• Lead multimillion dollar project to upgrade MCCs on (8) papermachines.
Lead projects which resulted in no loss time or recordable injuries for over 2 years.
• Identified new product enhancements that have improved efficiency of several plant operations.
Ronco Machine and Rigging 1997-2005
Electrical and Instrumentation Technician
Directly responsible for the installation, repair and maintenance of industrial equipment. Lead team of electricians dedicated to minimizing downtime and equipment malfunctions.
Restaurant Owner 1995-2000
Owner/Partner
Owned and managed all aspects of a small restaurant. Managed a staff of approximately 15. Responsible for planning, purchasing, food preparation, maintenance, and accounting.
Proctor and Gamble 1977-1995
Electrical and Instrumentation Technician
Directly responsible for the installation, repair and maintenance of industrial equipment. Troubleshoot, repair and maintain diaper lines to minimize downtime periods. Coordinate preventive repairs to maintain equipment in good running order. Work with engineers to install projects to improve the machines capabilities. Equipment included electrical, hydraulic, and pneumatic systems.
EDUCATION
Keystone College
Computer skills Classes
ACCREDITATIONS
OSHA 30 Hour Construction Safety
First Aid and CPR
TPM Installation
SAP Training
Project Management
Electrical Contractor
Aerial Platform Lift Licensed
US Air Force Veteran