Mechanical Engineer with **+ years of working experience. Specialized in Design of fixed equipment, rotating equipment and packaged system. Design of process equipment - pressure vessel, heat exchanger, packaged system / Air compressors / Air handling units. My background includes the Chemical, Refining, Pharmaceutical, Semiconductors, Nuclear and Industrial markets with experience in both the manufacturing shop and the design office. Which provides a holistic approach to every project. Developed a corrosion management system for Saudi Aramco – Aromatic plant. Worked in power plants, laboratory, mini – pilot plants and clean rooms.

Education:

Master of Science in Mechanical Engineering, Manhattan College, NY

(September 1991)

Bachelor of Science in Mechanical Engineering,

Maharaja Sayajirao University of Baroda, India. (August 1987)

Computer Skills:

AutoCAD, AUTO Lisp, MS Excel, MS Word, Compress, PV Elite, Disasu, CodeCALC, HTRI, Aspen Tech B-Jack, Navis Works, C++, HTRI, Visual Basic, PDF Exchange, MS VISIO.MS Project

Certificate: Web Application Developer (October 1999)

C++ Programming (May 1997)

HVAC Skills:

Checked and Calculate the heating and Cooling load for a Religious facility. Set up a maintenance Program, set up Contractor for Routine and Emergency maintenance for 65000 sq. facility. (2002-2003). Exposure to cGMP

Representative assignments include:

KBR-Executive Engineer – Mechanical, Newark, Delaware (2016- March 2017)

Worked on (EPC) Earth project -(Chemours) - Purchasing Capital goods and Equipment worth $20 Mils - High Alloy and Stainless steel pressure vessels, e.g. Columns, vessels and internals for the columns. Datasheet preparations, technical bid evaluations, order placement, checking drawings, ITP’S, weld procedures, following up with vendors, clients, process, I & C, CSA, project team.

Jacobs Engineering, Mt. Laurel, NJ – Process Mechanical Engineer (2012 – 2016)

FEL-3 project for Honeywell Apollo 2, Honeywell Poseidon

PES – Naphtha Hydro treater tower and Internals Specifications / datasheet / Technical bid Evaluation

Preparation of material requisitions, specification, datasheets, checking vendor drawings and calculations for vessels, tanks, Heat Exchangers, packaged equipment.

Prepared and Technical Bid Evaluation for price and conditioning of the bids for process equipment from different vendors and making recommendations

Corrosion Management system for Saudi Aramco Company

Purchasing of HVAC/ Plant Air compressor / Air Handling Unit

Worked on a project where a CMP and a Risk Based Inspection plan were developed for a new refinery coming online on 2017.

KBR-Technical Advisor, Mechanical, Newark, Delaware (2009 – 2012)

Worked on Husky Refinery and Blackhawk projects (E.I. DuPont Project FEL2 and FEL3 level)

Work completed includes writing specifications, datasheet / design of Pressure vessels and Tanks Per ASME VIII, Div 1, API650, API 620, checking of Drawings and Code calculations.

Work interaction with various disciplines – CSA, Process, Instrumentations and

controls, Civil Engineering and Clients.

Participated / Suggested different approaches for Value Engineering to reduce cost.

Sonaref Refinery Project, Lobito, Angola, Africa &

Husky KNHT Project, Lima, OH

Completed FEED and EP work for the Sonaref Project: Mechanical design of pressure vessels for Sonaref Project for various units – SGP, Merox, Penex, Naphtha, Sulfur recovery. Interactions with various Disciplines – Piping, CSA, Process, Instrumentations and controls, Civil Engineering.

Reviewed and approved completed drawings, prepared calculations using DISASU Software; he also prepared Technical requisitions on SGP Pressure Vessels, Issuing Various Documents on the Documentum document management software).

Worked on Technical Review of the Bids for Reactor Vessel on Husky Project.

Amer Industrial Inc. Project Engineer -Wilmington, DE (2006 – 2009)

Company fabricates capital goods for the nuclear power industry. Managed, $4 Mil project – provided Piping spools, piping components for Taiwan Nuclear Power plant

Managed a team of 40 workers, QA/QC personnel and support staff.

Reviewed and approved completed drawings in accordance with the purchase order, specification, and customer requirements for the shop fabrication and control of their release.

As a Mechanical Project Engineer, Interfaced with Customers, Vendors, ASME Code Inspectors

Created necessary calculations, obtained document approval from customers as required. (Weld Procedures, Drawings, Calculations, etc.)

Created quality assurance Route sheets (Travelers) in conjunction with QA and Production, Maintained engineering project files.

Responsible for test samples, Bill of Material, developing draft Purchase orders for items Listed in BOM, reviewing the final PO.

Involved in the reviewing and dispositions of NCR’s and Car’s associated with project.

Prepared quotations estimates including cost of material, labor hours, engineering costs overheads and profit.

Performed mechanical design of Heat Exchangers with Codeware Compress software and thermal design with HTRI.

Performed re-rating of equipment with corroded thicknesses.

Doyle & Roth Manufacturing Company, NYC, NY (1993 – 1996 and 1998 – 2004)

Company fabricates pressure vessels and heat exchangers for industrial

Applications (Chemical, Pharmaceutical, Bio Technology, Oil and Refinery)

with different metallurgy.

Worked on thermal rating, mechanical design and pricing of heat exchangers and pressure vessel, vacuum chambers as per ASME Section VIII Div.1 and TEMA sales follow ups, sales lead.

Prepared drawings for fabrication on AutoCAD, Programming with AUTO Lisp.

Provided material procurement, and supervision of field job.

Provided mechanical design of heat exchangers with Aspen Tech B-Jack

software and thermal Design with Aspen Tech Hearten.

S & K Products Inc., Mechanical Engineer, Chestnut Ridge, NY (1996-1998)

The company produces equipment for the semiconductor industry. Provided the following services:

Provided sales and customer support, testing & debugging after unit was built.

Worked on two major successful projects as a Project Engineer from start to finish. Led an Engineering group of five engineers for these projects.

Designed a machine to meet clean room protocol, hazardous material area, and environment and material compatibility to meet requirements semi-conductor equipment specifications, and design to meet domestic & International codes.

Clean room working experience.

Best Medical Inc., Mechanical Engineer, Springfield, VA (1992-1993)

The company provides a variety of radiotherapy products for the healthcare industry. Provided the following services:

Developed, involved with the design of the pilot plant for a new product using Laser Welding techniques and mapping.

Responsible for process automation, computer control process interfacing multi-axes motion control and purchasing new equipment and computers (worth $250,000) for the automated processes of the new pilot plant.

Exposure to cGMP

Farberware, Manufacturing Engineer, Bronx, NY(1990-1992)

The company provides manufacturing of cookware products and kitchen appliances. Provided the following services:

Designed equipment improvement such as fixtures for bead blasting machine and an automatic sorting system, increasing the productivity of the plant.

Prepared operation process charts and plant layout.

Prepared detailed drawings for the date code stamps.

Implemented various productivity programs to reduce cost and production time.

Setup production lines for two new products, training of thirty personnel.

Purchased machinery and equipment worth quarter of million dollars.

Implemented a new technique; Electro – chemical etching for stamps (savings of thousands of dollars).

Implemented Ion-Exchanger for process waste removal (savings of millions of dollars per year).

AEC, Thermal Power Plant, Amadavad, India(1987- 1988)

Company is a fossil fuel power generation plants.

Provided the following services:

110 MW fossil fuel power plant start-up, shut down.

monitored and controlled power generation parameters.

Involved with the high voltage switching and console operation.

Involved with boiler and turbine interlock and protection checking.

Involved with steam, electric, water lines isolation and commissioning.

Helped Commissioning and Installing of 110 MW power Plants.



Contact this candidate