Post Job Free

Resume

Sign in

Electrical Field Engineer

Location:
Houston, TX
Posted:
May 22, 2017

Contact this candidate

Resume:

SAMUEL U. IBE

***** ********* ****** ***.*** Houston Texas 77099

Mobiles/ Email: 832-***-****. ac0feu@r.postjobfree.com

Key Experience

w Field Supervision – Quality Control – Inventory Experience – Heavy equipment Operation – Good multi-tasking ability – Exceptional problem solver – Safety compliant – Strong communication skills – excellent computer skillsw

A confident and result oriented professional engineer with over 7 years’ experience in the Engineering industry. Proven abilities in execution of Engineering projects, achieving set targets, and delivering exceptional standard services. Passionate about being part of a dynamic and resourceful team that will be unrelenting in its quest for excellence, professionalism and career development.

Areas of Expertise

Quality control, Team leadership/Motivation, Progress reporting, Field Supervision and Good Customer Client Relation

Professional Development

Project Management Institute Certified Associate in Project Management (CAPM). 2012

Institute of Management and Technology Enugu, Enugu State. 2005

Higher National Diploma

Ajeromi Ifelodu High School Osho Drive Olidi-Apapa Lagos Nigeria 1999

Professional Experience and Significant Achievements

Project Management Contractor Nov 2011-Jun 2014

Bechtel LNG Contractor Limited

Plot 1680

GM PLAZA, Sanusi Fafunwa Street,

By Karinmu Kotun Street,

Victoria Island, Lagos Nigeria.

Responsibilities: (Electrical Field Engineer Electrical)

Ensured all activities which include construction, maintenance and operations of project facilities/equipment are performed in accordance with manufactures standard and Project Environmental, Safety and Health policies.

Provided technical support to Electrical and Instrument Superintendents and their designees.

Regularly updated the Construction Site Management on matters relating to installation and quality control.

Established with the client personnel the parameters on installation, electrical testing, and turnover of systems, rotating equipment, and electrical equipment.

Established and maintained communications with the Project Design Groups to resolve field installation concerns, design conflicts, queries, and constructability.

Determined areas of priorities for equipment and bulk raceway installation through consultation with Project Supervision and the overall project schedule.

Participated in page turn-ups to review the project schedule, and worked with Project Supervisors to develop appropriate schedules, man loading curves, and task durations as required.

Performed routine inspections of on-going work activities on a continuous basis and oversee a final check out of rotating and electrical equipment, control wiring circuits, and instrument loop checks prior to turnover to the start-up group or the client.

Performed Troubleshooting, resolved, and responded to identified electrical and instrumentation circuitry problems.

Executed field material take-offs from design drawings; initiated material requisitions for electrical testing equipment, spare parts and bulk electrical material.

Updated current as-built information for the electrical installation and record prints for all underground electrical distribution systems, lighting, grounding, fire protection, communications, cathodic protection, heat tracing systems, raceway, cable, jumpers, and termination changes.

Maintained an open dialogue with site and factory vendor representatives to assess requirements and to have proper vendor representatives at the site to support installation, testing, or troubleshooting.

Interfaced with other project discipline engineers such as procurement, cost control, schedulers, craft supervision, client’s management representatives, maintenance, operations departments, start-up personnel, equipment/material vendors, subcontractors, quality control, and safety.

Reviewed design drawings for construction requirements to determine if enough information is identified for constructability.

Performed verification of conduit sizes fill, cable size and type, raceway design and layout, single lines drawings, loop drawings, panel and circuit schedules, termination and jumper lists, P&IDs.

Establishes good safety practices and client requirements for maintaining workers safety on electrical circuits. Assisted the site’s designated tagging authority, responsible for coordinating construction site’s Lockout/Tagout procedure.

Maintained maintenance records, electrical testing results, system and facility records, non-conformance dispositions, start-up, design, or field documentation changes, as-built drawings and site electrical database.

Sintehdumo Alifun Limited Jun 2010-Nov 2011

Brass LNG Project

Brass Island, Bayelsa State.

Nigeria.

ac0feu@r.postjobfree.com

Responsibilities: (Lead Maintenance Supervisor)

Supervised a 14 men maintenance team which comprised of Electrical/ Mechanical department, HVAC/Furniture department, Sewage/Water Treatment Department and Incinerator Department.

Ensured all maintenance and operations of the project facilities/equipment are performed in accordance with the manufactures Standard and Project Environmental, Safety and Health policies.

Liaised with Quality Control Staff to ensure project goals and objectives are attained.

Prepared and coordinated daily maintenance progress reports for management review.

Updated weekly, monthly, bi annually and annually maintenance logs of each facility and equipment in accordance with manufactures operation and maintenance manual.

Supervised the operation and maintenance of Activated Sludge Sewage Treatment plant that produce effluent in accordance with FME and Department of Petroleum Resources Effluent Specification.

Supervised the operation and maintenance of a Conventional Water Treatment Plant that treats raw borehole water to the World Health Organization portable water acceptable standard.

Supervised the operation and maintenance of Three Perkins 500KVA, 400V, 0.8PF, 50Hz Electrical Power Generating sets with built in automatic Synchronization panel ECM (Electronic Control Module) software.

Supervised the operation and maintenance of a C600 Pennram Incinerator that combusts nongaseous waste (liquid, solid and Sludge) to meet the EPA standard for smoke free operation and carbon monoxide emissions and World Health Organization emission standard.

Operated warehouse equipment such as forklift to move large pallets, boxes, and containers of merchandise.

Supervised the operation and maintenance of company’s maintenance material warehouse.

Unloaded incoming shipment trucks and moved maintenance materials to designated locations within the warehouse.

Performed items inspections for damages and ensured quantities matched with vendors/client shipment documents.

Performed weekly materials inventories in warehouse, raise requisition order for new shipments.

Prepared packaging materials and pallets of maintenance materials for new shipments.

Maintained warehouse logs and updated computer databases in accordance with company procedures.

Ensured that all team members have a clear understanding of the standard work procedures and applicable obligations.

Ensured warehouse equipment are properly maintained in accordance with manufacturer’s manuals.

Tagged all incoming materials and moved all items to proper location for storage.

Ensured proactive/corrective maintenance is carried out on project facilities/equipment with a key objective, following the operation and maintenance manual to minimize cost and obtain maximum life and economy of equipment/facilities.

Sintehdumo Alifun Limited Nov 2009 -Jun 2010

Brass LNG Project

Brass Island,

Bayelsa State.

Nigeria.

ac0feu@r.postjobfree.com

Responsibilities: Chief Operator Incinerator Plant

Ensured the smooth operation of Pennram C600 Incinerator Plant manufactured by Pennram Pennsylvania U.S.A

Ensured all operations at the incinerator plant is carried out safely.

Ensured excellent quality control measures and standard work practice procedures are complied with at all times.

Performed routine preventive maintenance on the plant.

Operated Forklift to load and unload waste skip into the Incinerator Plant.

Ensured daily housekeeping to create a safe working environment.

Prepared daily and weekly report for management review.

Prepared weekly work schedule.

Divine Power Products Feb 2007 – Oct 2009

# 40 Saka Tinubu Street

Victoria Island Lagos.

Nigeria.

Responsibilities: Electrical Engineer

Performed installation and maintenance of Heavy Duty Power Generators, Inverter systems, Uninterrupted Power Supply Systems.

Worked in assembling line of Power Generators, wiring and control panel assemble.

Referees

Dr. Rivers R. Glovers, I

4440 Lexingyon Bolivard

Missouri City, TX 77459

ac0feu@r.postjobfree.com

832-***-****

Slaton Drew

Project Manager Contractor (Bechtel LNG Contractors LTD.)

Brass LNG Project

ac0feu@r.postjobfree.com

713-***-****



Contact this candidate