Alexander M. Cernoch
*** *********, *******, ** *****
ac0c8a@r.postjobfree.com 713-***-****
EDUCATION & CERTIFICATES
THE UNIVERSITY OF TEXAS AT AUSTIN December 2011
Bachelor of Science, Mechanical Engineering
Minor, Business Foundations Program
ENGINEER IN TRAINING CERTIFICATE August 2013
PROFESSIONAL WORK EXPERIENCE
CHEVRON CORPORATION
DEEPWATER EXPLORATION AND PROJECTS, GULF OF MEXICO Aug 2016 Present
Lead Field Engineer
Onsite engineering point of contact for ~$1MM/day deepwater drilling and completions operations
Managed a team of 4 field engineers and vetted all onsite operational procedures and calculations
Accompanied new drillship from Korea to ensure all equipment and procedures were ready for drilling
operations upon arrival in the Gulf of Mexico
Ensured well control kill sheets were updated each hole section and mud weight change
Oversaw all critical operations and provided guidance to ensure procedures were executed per plan
Managed 28-day forecasting tool for all operations and logistics
Assisted with SIMOPs procedures for deepwater drilling, completions, and production operations
DEEPWATER EXPLORATION AND PROJECTS, GULF OF MEXICO Aug 2014 Aug 2016
Field Engineer
Provided onsite engineering support to ~$1MM/day deepwater drilling and completions operations
Developed and executed procedures for all drilling and completions operations
Performed all onsite engineering procedures and calculations
Ensured regulatory compliance throughout all operations
Designed and managed casing, liner, and tieback runs in ~30,000 ft. complex wells
Oversaw abandonment procedures, lost circulation prevention, and directional programs
Provided onsite engineering support for multi-zone frac-pack completions in lower tertiary reservoirs
Worked with office based team to model operations in Landmark Engineering Desktop Software
Coordinated call-out and return of all business partner rental equipment and service personnel
Managed rental costs by thoroughly examining and disputing invoices
Negotiated ~$300,000 in savings with business partners in 2016
Implemented fleet wide initiative to eliminate the call-out of unnecessary contingency equipment at
~$2,000 per casing/liner cement job
Documented casing strings, tubing strings, and cement details in WellView daily drilling reports
Filled in as day Drill Site Manager as needed
ASIA SOUTH BUSINESS UNIT, GULF OF THAILAND Sep 2013 Aug 2014
Field Drilling Engineer
Supported the drilling of ~40 infill wells in an offshore factory drilling environment
Provided onsite engineering support for drilling and abandonment operations, lost circulation prevention
and contingency plans, hole section look-backs, and WellView daily drilling reports
Managed complex wellbore challenges such as high temperatures, severe losses, and ballooning while
maintaining some of the highest ROPs in the world
Worked closely with directional drillers and MWD/LWD personnel to optimize bit selection, BHA design,
log interpretation, and manage drilling parameters for directional control
Developed cement slurry volume and displacement calculations, plug bumping/packer setting
procedures, LOT/FIT procedures, and BOP test procedures
Managed casing/tubing inventory on rig and developed tallies and space-outs
Analyzed the impact of sweeps pumped on ROP in the intermediate hole section and identified average
improvements of ~200 ft/hr
APPALACHIA/MICHIGAN BUSINESS UNIT, PENNSYLVANIA Jul 2013 Sep 2013
Wellsite Engineer
Worked with Wellsite Managers to improve process efficiency and to streamline safe work practices
around fracturing operations
Presented findings to Completions Superintendents and recommended updates to the business units
Hydraulic Fracturing SOP
ACCELERATED DEVELOPMENT PROGRAM (ADP), GULF OF MEXICO Jun 2012 Jul 2013
ADP Engineer
Rotated 21/21 on a 6th generation deepwater drillship while seconded to Transocean as a roustabout,
floorhand, subsea engineer, derrickhand, assistant driller, driller, marine engineer, and dynamic
positioning officer
Participated in all Transocean related daily jobs and responsibilities, job safety analyses, and pre-job
meetings
Developed a hitch evaluation form for ADP engineers that emphasized safety, participation, and
leadership
MAXDRILL PERFORMANCE DRILLING GROUP, HOUSTON Feb 2012 Jun 2012
ADP Engineer
Developed interval look-backs for deepwater Gulf of Mexico wells to capture drilling parameter
objectives, BHA design optimization, offset comparison, and improvement opportunities
TECHNICAL COURSEWORK
Drilling Practices, Primary and Remedial Cementing, Drilling Fluids, Solids Control and Waste Management,
Completions and Well Intervention, Geology and Geophysics for Drilling and Completions, Wellbore
Positioning and Directional Drilling, T.H. Hill Drill String Design, IADC Well CAP Drilling, Work over &
Completion Surface and Subsea, Supervisory Level, Schlumberger Cementing, Schlumberger Fracturing
and Stimulation, Schlumberger Wireline, Subsea Mudlift Drilling Fundamentals, Subsea Solutions Subsea
Equipment 101, Performance Drilling Practices, Financial Acumen and Decision Analysis