CURRICULUM VITAE

*.Personal Detail

Place of Birth/Date : Pangkal Pinang-Bangka /November 26th, 1971

Marital Status : Married

Citizen : Indonesia

Address : Bengkong Indah II Swadaya,RW01/RT08 Blok L No.05

Batam - Indonesia

Mobile Phone : +62-813-****-****

Email : **.****@*****.***

No. Passport : A4989373 expired April 2018

2.Background Education

1990 – 1994 : Bachelor Diploma of Mechanical Engineer, High School Engineer of Padang (ITP) GPA 2.97 Scale 4.0

3.Key Skill and Work Experience

I have been a total of over 20 years experience as a Professional QA/QC Inspector for Mechanical, Piping and Structure, covering all aspect of construction primarily in oil and gas/petrochemical, Ship construction new building and Ship repair, Power plant project, as well as general construction.

Strong coordination with good communication skills, self initiative, good investigation to solving problem and implementation skills, coupled with mechanical degree and strong determination, together with computer skills.

Specific ExpertiseS

Oil & gas/Refinery & Petrochemical as a QA/QC/Welding Inspector

Ship Construction as a Piping QC Engineer and Welding Inspector

DUTY & RESPONBILITY

• Ensure that all codes (ASME,AWS, API, etc) and that all client Specs are being adhered to.

•Ensure that a Quality Control Package is compiled for every project and that a QC number is assigned for that project and that all the guidelines in the QC manual are followed.

•Ensure that the materials listed on the drawing show material type, grade and schedule.

•Ensure that an engineering spec has been chosen for each project.

•Ensure proper material control is being done, whether using new or used fittings etc.

•Ensure that all welding procedures are suitable for the materials being welded and that the welders are qualified and tested to the procedures.

•Ensure the proper implementation of RBI (Risk Based Inspection) by managing the work process, method, equipment and contractors’ resources.

•Ensure the proper implementation of regulatory and non-regulatory certifications of equipment by managing the work process, method, equipment and contractors’ resources.

Assist Operations and Engineering in the selection and implementation of special inspection techniques.

4.Training and Certification

Certified Welding Inspector CSWIP 3.1 Level II, Certificate number.76545, and Expiry date 18/03/2018 by TWI UK,attendant Certificate Number 1QDO/652296, by jogyakarta - Indonesia

Welding Inspector API/IWS-B4T Cert No.0607.12-10BTM.1677 by B4T Bandung at BATAM

Welding Inspector Pressure Vessel ASME VIII. Div 1 & 2 conducted by PROFAB

Magnetic Particle Testing, ASNT Level II. Cert No.MT-1175

Liquid Penetrant Testing, ASNT Level II. Cert No.PT-1175

Ultrasonic Testing ( plate & pipe ) ASNT Level II. Cert No. UT-PP-11115

Radiographic Interpretation ASNT Level II. Cert No.RI-1145

Welding Association of Indonesia, Cert No.785.0507.WI.BTM by IWS training

BOSIET Cert no:137157072909130002, BY OPITO APPROVED COURSE, SMTC(GLOBAL).

5.Additional Skill and Expertise

Fluent in English oral and write

Familiar with to using a Computer Ms Office (Excel, Word)

Good knowledge with Welding process such a SMAW/MMA, MIG/MAG, SAW,ESW, GTAW/TIG

Understand to reading international Code and Standard (ASME B31.3, AWS D1.1, ASME IX, ASME VIII Div I.II, API 1104 and DNV OS F101)

6.Employment History

1. Periods : Desember, 2016 – March, 2017

Company : Edif-NDE Technical Service Singapore Pte.Ltd

Project Assigned : JV OFF-AEGEAN REFINERY PROJECT

CLADDING ( CRA ) PIPE SPOOL ( 16 Unit )

Client : Technicas Reunidas

Position : Sr.QA/QC/Welding Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test, Lamination test of Material.

Witness Hydro test activity

Ensure the piping/Tie in spool erection on the Jacket/Platform are correct and close the punch list

Ensure the Pile,Jacket orientation and before, during and after Installation.

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record to completion all document Installation.

2. Periods : August, 2016 - Desember, 2016

Company : Edif-NDE Technical Service Singapore Pte.Ltd

Project Assigned : PETRONAS RAPID Project

( P12B Solid product Jetty and Associated Handling Facilities

at TANJUNG SETAPA )

Client : PETRONAS

Position : Owner Rep.QA/QC Welding Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test, Lamination test of Material.

Witness Hydro test activity

Ensure the piping/Tie in spool erection on the Jacket/Platform are correct and close the punch list

Ensure the Pile,Jacket orientation and before, during and after Installation.

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

3. Periods : Juni, 2016 – August, 2016

Company : OTI ( Oilfield Technical Inspection ) SDN.BHD

Project Assigned : Long Term contract for the EPCI OF WELHEAD

Platform,Associated Pipelines and Tie-in works( offshore )

BONGKOT & ARTHIT Field Development Project

Client : PTTEP

Position : Sr.QA/QC/Welding Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test, Lamination test of Material.

Witness Hydro test activity

Ensure the piping/Tie in spool erection on the Jacket/Platform are correct and close the punch list

Ensure the Pile,Jacket orientation and before, during and after Installation.

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record to completion all document Installation.

4. Periods : Jan, 2016 – Mei, 2016

Company : Technicas Reunidas

Project Assigned : RAPID Project ( Pengerang –JOHOR ), Fabrication 80 unit

Vessel ( Daekyung Indah Heavy Industry, Fabricator )

Client : PETRONAS

Position : Sr.QA/QC/Welding Inspector / Expeditor

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication.

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication.

5. Periods : April 2014 – Desember 2015

Company : OTI ( Oilfield Technical Inspection ) SDN.BHD

Project Assigned : Long Term contract for the EPCI OF WELHEAD

Platform,Associated Pipelines and Tie-in works( offshore )

BONGKOT Field Development Project

Client PTTEP

: Nong Yao Welhead Processing Platform( WHP & WPP)

: Installation pipelines with Half Shell conection pipe 12”to 8”

And 10” to 6” Down Hill weld of processing, Installation

2 jackect & 2 Platform ( Offshore )

Client : Mubadala Petroleum

Position : Sr.QA/QC/Welding Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Lamination test of Material.

Witness Hydro test activity

Ensure the piping/Tie in spool erection on the jacket/ Platform are correct and close the punch list

Ensure the Pile/Jacket orientation and before, during and after Installation.

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record to completion all document Installation.

6. Periods : July, 2013- April 2014

Company : TIMAS Suplindo

Project Assigned : PETRONAS ( Bukit Tua Development Project )

Fabrication Jacket, Platform, Conductor Make Up 6 Unit,

Pile,Riser (Onshore )

PT.PAL, PT.Lintech-Surabaya-Indonesia

Jacket, Pipelines, Platform Installation, (offshore )at Surabaya

Sea

Position : Client Rep.Sr.QA/QC/Welding Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test,(Lamination test of Material )

Witness Hydro test activity

Ensure the piping/Tie In spool erection on the Platform are correct and close the punch list

Ensure the (nozzle of vessels),Pile,Jacket orientation and before, during and after fabrication?Installation. .

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record to completion all document fabrication/Installation.

7. Periods : February, 2013- July,2013

Company : Conoco Phillips

Project Assigned : Sumpal Expansion Project

Inlet Separator Tag no:20MBD-201&Structural

Transalindo Eka Persada – Batam Indonesia

Position : Client Rep. Sr. QA/QC Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

8. Periods

: July, 2012 – February, 2013

Company

: PROCESS GROUP AUSTRALIA

Project Assigned

: NEWCASTLE GAS - STORAGE TANK FACILITY COMPLETED

ONE PACKAGE IN MC DERMOTT-BATAM ISLAND–INDONESIA

Position

: Client Sr.QA/QC Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

9.Periods

: January, 2012 – July, 2012

Company

: SIEMENS USA

Project Assigned

: DORAD 800MW COMBINED CYCLE POWER PLANT

IN PROFAB - BATAM ISLAND – INDONESIA

Position

: Client Rep.Sr QA/QC Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

10.Periods

: January, 2011 – January, 2012

Company

: HALLIBURTON ENERGY SERVICES

Project Assigned

: SURFACEWELL TEST EQUIPMENT(Separator,surge

Tank,Storage Tank,Piping,,Fleer Boom)

Structural (Skid, piperack,Module )

IN PROFAB - BATAM ISLAND – INDONESIA

Position

: Client Sr. QA/QC Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

11.Periods

: July, 2010 – January, 2011

Company

: VME PROCESS

Project Assigned

: FPSO TUPI PILOT(One package Module)

IN ULTRACO - BATAM ISLAND – INDONESIA

Position

: Client QA/QC Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

12.Periods

: August, 2008 – July, 2010

Company

: BUMI ARMADA Sdn.Bhd

Project Assigned

: Project 72 M Anchor Handling/Offshore Support Vessel IN PT.Drydocks Word Pertama - BATAM ISLAND – INDONESIA

Position

: Client QA/QC Inspector

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

13.Periods

: July, 1998 – August, 2008

Company

: PT. PROFAB INDONESIA

Position

: Senior QA/QC Inspector

Project Assigned

:

1.JN984 Client Enerflex Process PTY LTD

Project Assign :Queen Island Australia

Glycol Sure Drum – 10 unit

Glycol flash Drum - 10 unit

Gas Dehydration Reboiller – 30 unit

Still Column & Reflux Condensor 30 unit

(Completed equipment with piping & structural every one package)

2.JN982 Client HEEREMA MARINE CONSTRACTORS AUSTRALIA (HMC)

Project Assign : NORTH RANKIN B PLATFORM – INSTALLATION

Fabrication 2 unit (WP101 Unit 1 and 2) DRILL RIG SUPPORT CASING

with totally Length 150 Meters (54 Circum and 54 Long seams) thickness 50mm

3.JN931 Client Petreco (Cameron – Singapore)

Project Assign : MINAS SURFACTANT PROJECT SFT-2

Fabrication 9 Module Completed Package (Piping process, Pressure Vessels, Storage Tank and Skid)

4.JN950 Client HESS (INDONESIA-PANGKAH) LTD

Project Assign : ONSHORE OIL TREATING FACILITY AND LPG RECOVERY PLANT PANGKAH LIQUID DEVELOPMENT PROJECT

Fabrication 1 Module Completed Package (Piping process, Pressure Vessels, Storage Tank and Skid)

5.JN986 Client UHDE SHEDDEN for PT. Kaltim Nitrate Indonesia

Project Assign : FINAL SCRUBBER, PRILLING SCRUBBER, NITRIC ACID TANK VENT SCRUBBER and AN CONCENTRATOR 4 UNITS

Fabrication Stainless steel Pressure Vessel FINAL SCRUBBER

(Tag No. 32C002 with size 5000 I.D x 17500 H)

Fabrication Stainless steel Pressure Vessel PRILLING SCRUBBER

(Tag No. 32C002 with size 7000 I.D x 17500 H)

Fabrication Stainless steel Pressure Vessel NITRIC ACID

(Tag No. 32C002 with size 457 O.D x 5050E/FOF)

Fabrication Stainless steel Pressure Vessel AN CONCENTRATOR

(Tag No. 32C002 with size 1550 I.D x 750 I.D x 17300 H)

6.JN894 Client VEOLIA WATER SOLUTION for MODEC S’PORE

Project Assign : MEDIA FILTERS 5 UNITS

Fabrication 5 Module Completed Package (Piping process, Pressure Vessels and Skid)

(Tag No. F-044101A-B-C-D-E with size 3750 I.D) CIP STORAGE TANK 5 units include Skid

Fabrication 1 Module Completed Package (Piping process, Pressure Vessels and Skid)

(VACUUM DEAERATOR VESSEL Tag No. V-044201A)

7.JN836 Client VME PROCESS for MODEC

Project Assign : FPSO JUBILEE FIELD UNIT, 6 UNITS

Fabrication Pressure Vessel HP – SEPARATOR

(Tag No. MBD-1015 A-B with size 4420 mm I.D x 10363 mm)

Fabrication Pressure Vessel IP – SEPARATOR

(Tag No. MBD-1125 with size 4267 mm I.D x 10363 mm)

Fabrication Pressure Vessel ELECTROSTATIC TREATER FLASHES

(Tag No. MBD-1130 with size 3048 mm I.D x 7315 mm)

Fabrication Pressure Vessel ELECTROSTATIC TREATER

(Tag No. MBK-1140 with size 3962 mm I.D x 16460 mm)

Fabrication Pressure Vessel LP – DEGASSER

(Tag No. MBD-1150 with size 3048 mm I.D x 7315 mm S/S)

8. JN883 client VEOLIA for WOODSIDE BURRUP PTY.LTD

Project Assign : PLUTO LNG, 6 UNIT

Fabrication Skid Carbon Filter, piping, Structural Platform and Pressure Vessel

9. JN842 Client SIEMENS, BUMI ARMADA BERHAD

Project Assign : OML 120 OYO FIELD DEVELOPMENT FPSO, 8 UNITS

Fabrication Pressure Vessel VERTICAL FLOATATION CELL VESSEL

(Tag No. 01-555-0-VH-04 with size 1800 O.D x 2900)

Fabrication Pressure Vessel HP SEPARATOR DEOLING HYDROCYLONE

(Tag No.01-555-0-VZ-01A -01B with size 457 O.D x 950)

Fabrication Pressure Vessel LP SEPARATOR DEOLING HYDROCYLONE

(Tag No.01-555-0-VZ-02A -02B with size 457 O.D x 950)

Fabrication Pressure Vessel TEST SEPARATOR DEOLING HYDROCYLONE

(Tag No.01-555-0-VZ-03A -03B -03C with size 324 O.D x 950)

10. JN836 Client VME PROCESS for MODEC

Project Assign : FPSO JUBILLE FIELD UNIT,5 unit

Fabrication Pressure Vessel HP-SEPARATOR

Fabrication Pressure Vessel IP - Separator

Fabrication Pressure Vessel Electrostatic Treater Flashes Vessel

Fabrication Prssure Vessel LP - DEGASER

Fabrication Pressure Vessel Electrostatic Treater

11. JN853 Client VME PROCESS for MODEC

Project Assign : FPSO TUPI PILOT UNIT,10unit

Fabrication Pressure Vessel POLISHING FILTER COALESCER

Fabrication Pressure Vessel LOW TEMPERATURE SEPARATOR

Fabrication Pressure Vessel INLET GAS FILTER COALESCER

Fabrication Pressure Vessel REGENERATON GAS SEPARATOR

Fabrication Pressure Vessel MOLECULAR SIEVE ADSORBER

Fabrication Pressure Vessel PARTICULAR FILTER

12. JN865 Client SIEMENS,BUMI ARMADA BERHAD

Project Assign : OML 120 OYO FIELD DEVELOPMENTFPSO,15 UNIT

Fabrication Pressure Vessel, Storage Tank

Fabrication Pressure Vessel FLOATING CELL VESSEL

13. JN846 Client APACHE for CLOUGH

Project Assign :MARS COMPRESSOR PROJECT – PHASE 2A,5 UNIT

Fabrication Pressure Vessel SEAL GAS FILTER

Fabrication Storage Tank, Pipe Spool, Skid

14.JN804 Client CHEVRON THAILAND EXPLORATON AND PRODUCTION,JRMAPP

Project Assign : PROD.COMP SUCTION SRUBBER,7UNIT

Fabrication Pressure Vessel PROD’N COMPRESORSUCTION SCRUBBER

Fabrication Pressure Vessel EXPANDER SUCTION SCRUBBER

Fabrication Pressure Vessel PIPE LINE COMPRESSOR SUCTION

Fabrication Pressure Vessel VAP RECOVERY SUCTION SCRUBBER

15. JN743 Client APL

Project Assign : MONTARA PROJECT

Fabrication STRUCTURAL & PIPING

16. JN718 Client APL

Project Assign : RELLIANCE PROJECT

Fabrication STRUCTURAL

17. JN695 Client APL

Project Assign : MAARI PROJECT

Fabrication PIPING

18. JN492 Client VME For MODEC

Project Assign : BOABAB FPSO

Fabrication GAS PROCESSING MODULE

Install Vessel,Piping,Storage Tank

19.JN491 Client PT SEMPEC

Project Assign : BETARA PROJECT

Fabrication DECK 900T, JACKET 230T, PILLES 350T

Install Vessel, Piping, Storage Tank, Control Room(completed one Module)

20. JN464 Client KVAERNER PROCESS SYSTEM MALAYSIA

Project Assign : YETAGUN PHASE – 3PROJECT

Fabrication HP PRODUCTION SEPARATOR ( V-3101)

21. JN400 & JN411 Client MERPRO

Project Assign : CONOCO BELANAK

Fabrication SAND WASH PACKAGE

Fabrication TEST SEPARATOR

Fabrication SAND REMOVAL

22. JN318 Client JORDAN KENT METERING SKID

Project Assign : KUWAIT AMENAM

Fabrication METERING SKID

23.JN296 Client J.RAY.MC DERMOTT

Project Assign : NORT PAILIN DEVELOPMENT PROJECT

Fabrication SAND WASH PACKAGE

Fabrication TEST SEPARATOR

Fabrication SAND REMOVAL

24. JN280 Client Gas Service International Pte Ltd

Project Assign : Gelam Station & Air Serdang

Fabrication Storage Tank 4 units

Fabrication Piping, Skid

Install one package Vessel, Piping, Skid

25.JN166 Client PT.PETORSEA/GULF KAKAP

Project Assign : GULF KAKAP Project

Stage Suction Scrubber Cold Separator,Separator,Free Gas Knock Out Drum,Glycol/Condensate Flash Vessel, Hot OIL Expantion Tank,KH Gas Separator,KRA Gas Separator.

Job Description

Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)

Prepare and Review Welding traceability and Material traceability to comply with requirement

Ensure welding activity refer to Welding Procedure Specification

Prepare NDT request and witness NDT activity, review Radiograph film

Witness and conduct for Portable Material Identification, Hardness test and Ferrite test

Witness Hydro test activity

Ensure the piping erection on the module are correct and close the punch list

Ensure the nozzle orientation and before, during and after vessel fabrication

Submit original NDT report to higher authority or authorize personnel

Collect and keep properly all copy acceptance report from Client and Third Party

Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication

Best Regards

Arief Setiyawan



Contact this candidate