CURRICULUM VITAE
*.Personal Detail
Place of Birth/Date : Pangkal Pinang-Bangka /November 26th, 1971
Marital Status : Married
Citizen : Indonesia
Address : Bengkong Indah II Swadaya,RW01/RT08 Blok L No.05
Batam - Indonesia
Mobile Phone : +62-813-****-****
Email : **.****@*****.***
No. Passport : A4989373 expired April 2018
2.Background Education
1990 – 1994 : Bachelor Diploma of Mechanical Engineer, High School Engineer of Padang (ITP) GPA 2.97 Scale 4.0
3.Key Skill and Work Experience
I have been a total of over 20 years experience as a Professional QA/QC Inspector for Mechanical, Piping and Structure, covering all aspect of construction primarily in oil and gas/petrochemical, Ship construction new building and Ship repair, Power plant project, as well as general construction.
Strong coordination with good communication skills, self initiative, good investigation to solving problem and implementation skills, coupled with mechanical degree and strong determination, together with computer skills.
Specific ExpertiseS
Oil & gas/Refinery & Petrochemical as a QA/QC/Welding Inspector
Ship Construction as a Piping QC Engineer and Welding Inspector
DUTY & RESPONBILITY
• Ensure that all codes (ASME,AWS, API, etc) and that all client Specs are being adhered to.
•Ensure that a Quality Control Package is compiled for every project and that a QC number is assigned for that project and that all the guidelines in the QC manual are followed.
•Ensure that the materials listed on the drawing show material type, grade and schedule.
•Ensure that an engineering spec has been chosen for each project.
•Ensure proper material control is being done, whether using new or used fittings etc.
•Ensure that all welding procedures are suitable for the materials being welded and that the welders are qualified and tested to the procedures.
•Ensure the proper implementation of RBI (Risk Based Inspection) by managing the work process, method, equipment and contractors’ resources.
•Ensure the proper implementation of regulatory and non-regulatory certifications of equipment by managing the work process, method, equipment and contractors’ resources.
Assist Operations and Engineering in the selection and implementation of special inspection techniques.
4.Training and Certification
Certified Welding Inspector CSWIP 3.1 Level II, Certificate number.76545, and Expiry date 18/03/2018 by TWI UK,attendant Certificate Number 1QDO/652296, by jogyakarta - Indonesia
Welding Inspector API/IWS-B4T Cert No.0607.12-10BTM.1677 by B4T Bandung at BATAM
Welding Inspector Pressure Vessel ASME VIII. Div 1 & 2 conducted by PROFAB
Magnetic Particle Testing, ASNT Level II. Cert No.MT-1175
Liquid Penetrant Testing, ASNT Level II. Cert No.PT-1175
Ultrasonic Testing ( plate & pipe ) ASNT Level II. Cert No. UT-PP-11115
Radiographic Interpretation ASNT Level II. Cert No.RI-1145
Welding Association of Indonesia, Cert No.785.0507.WI.BTM by IWS training
BOSIET Cert no:137157072909130002, BY OPITO APPROVED COURSE, SMTC(GLOBAL).
5.Additional Skill and Expertise
Fluent in English oral and write
Familiar with to using a Computer Ms Office (Excel, Word)
Good knowledge with Welding process such a SMAW/MMA, MIG/MAG, SAW,ESW, GTAW/TIG
Understand to reading international Code and Standard (ASME B31.3, AWS D1.1, ASME IX, ASME VIII Div I.II, API 1104 and DNV OS F101)
6.Employment History
1. Periods : Desember, 2016 – March, 2017
Company : Edif-NDE Technical Service Singapore Pte.Ltd
Project Assigned : JV OFF-AEGEAN REFINERY PROJECT
CLADDING ( CRA ) PIPE SPOOL ( 16 Unit )
Client : Technicas Reunidas
Position : Sr.QA/QC/Welding Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test, Lamination test of Material.
Witness Hydro test activity
Ensure the piping/Tie in spool erection on the Jacket/Platform are correct and close the punch list
Ensure the Pile,Jacket orientation and before, during and after Installation.
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record to completion all document Installation.
2. Periods : August, 2016 - Desember, 2016
Company : Edif-NDE Technical Service Singapore Pte.Ltd
Project Assigned : PETRONAS RAPID Project
( P12B Solid product Jetty and Associated Handling Facilities
at TANJUNG SETAPA )
Client : PETRONAS
Position : Owner Rep.QA/QC Welding Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test, Lamination test of Material.
Witness Hydro test activity
Ensure the piping/Tie in spool erection on the Jacket/Platform are correct and close the punch list
Ensure the Pile,Jacket orientation and before, during and after Installation.
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
3. Periods : Juni, 2016 – August, 2016
Company : OTI ( Oilfield Technical Inspection ) SDN.BHD
Project Assigned : Long Term contract for the EPCI OF WELHEAD
Platform,Associated Pipelines and Tie-in works( offshore )
BONGKOT & ARTHIT Field Development Project
Client : PTTEP
Position : Sr.QA/QC/Welding Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test, Lamination test of Material.
Witness Hydro test activity
Ensure the piping/Tie in spool erection on the Jacket/Platform are correct and close the punch list
Ensure the Pile,Jacket orientation and before, during and after Installation.
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record to completion all document Installation.
4. Periods : Jan, 2016 – Mei, 2016
Company : Technicas Reunidas
Project Assigned : RAPID Project ( Pengerang –JOHOR ), Fabrication 80 unit
Vessel ( Daekyung Indah Heavy Industry, Fabricator )
Client : PETRONAS
Position : Sr.QA/QC/Welding Inspector / Expeditor
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication.
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication.
5. Periods : April 2014 – Desember 2015
Company : OTI ( Oilfield Technical Inspection ) SDN.BHD
Project Assigned : Long Term contract for the EPCI OF WELHEAD
Platform,Associated Pipelines and Tie-in works( offshore )
BONGKOT Field Development Project
Client PTTEP
: Nong Yao Welhead Processing Platform( WHP & WPP)
: Installation pipelines with Half Shell conection pipe 12”to 8”
And 10” to 6” Down Hill weld of processing, Installation
2 jackect & 2 Platform ( Offshore )
Client : Mubadala Petroleum
Position : Sr.QA/QC/Welding Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Lamination test of Material.
Witness Hydro test activity
Ensure the piping/Tie in spool erection on the jacket/ Platform are correct and close the punch list
Ensure the Pile/Jacket orientation and before, during and after Installation.
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record to completion all document Installation.
6. Periods : July, 2013- April 2014
Company : TIMAS Suplindo
Project Assigned : PETRONAS ( Bukit Tua Development Project )
Fabrication Jacket, Platform, Conductor Make Up 6 Unit,
Pile,Riser (Onshore )
PT.PAL, PT.Lintech-Surabaya-Indonesia
Jacket, Pipelines, Platform Installation, (offshore )at Surabaya
Sea
Position : Client Rep.Sr.QA/QC/Welding Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test,(Lamination test of Material )
Witness Hydro test activity
Ensure the piping/Tie In spool erection on the Platform are correct and close the punch list
Ensure the (nozzle of vessels),Pile,Jacket orientation and before, during and after fabrication?Installation. .
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record to completion all document fabrication/Installation.
7. Periods : February, 2013- July,2013
Company : Conoco Phillips
Project Assigned : Sumpal Expansion Project
Inlet Separator Tag no:20MBD-201&Structural
Transalindo Eka Persada – Batam Indonesia
Position : Client Rep. Sr. QA/QC Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
8. Periods
: July, 2012 – February, 2013
Company
: PROCESS GROUP AUSTRALIA
Project Assigned
: NEWCASTLE GAS - STORAGE TANK FACILITY COMPLETED
ONE PACKAGE IN MC DERMOTT-BATAM ISLAND–INDONESIA
Position
: Client Sr.QA/QC Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
9.Periods
: January, 2012 – July, 2012
Company
: SIEMENS USA
Project Assigned
: DORAD 800MW COMBINED CYCLE POWER PLANT
IN PROFAB - BATAM ISLAND – INDONESIA
Position
: Client Rep.Sr QA/QC Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
10.Periods
: January, 2011 – January, 2012
Company
: HALLIBURTON ENERGY SERVICES
Project Assigned
: SURFACEWELL TEST EQUIPMENT(Separator,surge
Tank,Storage Tank,Piping,,Fleer Boom)
Structural (Skid, piperack,Module )
IN PROFAB - BATAM ISLAND – INDONESIA
Position
: Client Sr. QA/QC Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
11.Periods
: July, 2010 – January, 2011
Company
: VME PROCESS
Project Assigned
: FPSO TUPI PILOT(One package Module)
IN ULTRACO - BATAM ISLAND – INDONESIA
Position
: Client QA/QC Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
12.Periods
: August, 2008 – July, 2010
Company
: BUMI ARMADA Sdn.Bhd
Project Assigned
: Project 72 M Anchor Handling/Offshore Support Vessel IN PT.Drydocks Word Pertama - BATAM ISLAND – INDONESIA
Position
: Client QA/QC Inspector
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
13.Periods
: July, 1998 – August, 2008
Company
: PT. PROFAB INDONESIA
Position
: Senior QA/QC Inspector
Project Assigned
:
1.JN984 Client Enerflex Process PTY LTD
Project Assign :Queen Island Australia
Glycol Sure Drum – 10 unit
Glycol flash Drum - 10 unit
Gas Dehydration Reboiller – 30 unit
Still Column & Reflux Condensor 30 unit
(Completed equipment with piping & structural every one package)
2.JN982 Client HEEREMA MARINE CONSTRACTORS AUSTRALIA (HMC)
Project Assign : NORTH RANKIN B PLATFORM – INSTALLATION
Fabrication 2 unit (WP101 Unit 1 and 2) DRILL RIG SUPPORT CASING
with totally Length 150 Meters (54 Circum and 54 Long seams) thickness 50mm
3.JN931 Client Petreco (Cameron – Singapore)
Project Assign : MINAS SURFACTANT PROJECT SFT-2
Fabrication 9 Module Completed Package (Piping process, Pressure Vessels, Storage Tank and Skid)
4.JN950 Client HESS (INDONESIA-PANGKAH) LTD
Project Assign : ONSHORE OIL TREATING FACILITY AND LPG RECOVERY PLANT PANGKAH LIQUID DEVELOPMENT PROJECT
Fabrication 1 Module Completed Package (Piping process, Pressure Vessels, Storage Tank and Skid)
5.JN986 Client UHDE SHEDDEN for PT. Kaltim Nitrate Indonesia
Project Assign : FINAL SCRUBBER, PRILLING SCRUBBER, NITRIC ACID TANK VENT SCRUBBER and AN CONCENTRATOR 4 UNITS
Fabrication Stainless steel Pressure Vessel FINAL SCRUBBER
(Tag No. 32C002 with size 5000 I.D x 17500 H)
Fabrication Stainless steel Pressure Vessel PRILLING SCRUBBER
(Tag No. 32C002 with size 7000 I.D x 17500 H)
Fabrication Stainless steel Pressure Vessel NITRIC ACID
(Tag No. 32C002 with size 457 O.D x 5050E/FOF)
Fabrication Stainless steel Pressure Vessel AN CONCENTRATOR
(Tag No. 32C002 with size 1550 I.D x 750 I.D x 17300 H)
6.JN894 Client VEOLIA WATER SOLUTION for MODEC S’PORE
Project Assign : MEDIA FILTERS 5 UNITS
Fabrication 5 Module Completed Package (Piping process, Pressure Vessels and Skid)
(Tag No. F-044101A-B-C-D-E with size 3750 I.D) CIP STORAGE TANK 5 units include Skid
Fabrication 1 Module Completed Package (Piping process, Pressure Vessels and Skid)
(VACUUM DEAERATOR VESSEL Tag No. V-044201A)
7.JN836 Client VME PROCESS for MODEC
Project Assign : FPSO JUBILEE FIELD UNIT, 6 UNITS
Fabrication Pressure Vessel HP – SEPARATOR
(Tag No. MBD-1015 A-B with size 4420 mm I.D x 10363 mm)
Fabrication Pressure Vessel IP – SEPARATOR
(Tag No. MBD-1125 with size 4267 mm I.D x 10363 mm)
Fabrication Pressure Vessel ELECTROSTATIC TREATER FLASHES
(Tag No. MBD-1130 with size 3048 mm I.D x 7315 mm)
Fabrication Pressure Vessel ELECTROSTATIC TREATER
(Tag No. MBK-1140 with size 3962 mm I.D x 16460 mm)
Fabrication Pressure Vessel LP – DEGASSER
(Tag No. MBD-1150 with size 3048 mm I.D x 7315 mm S/S)
8. JN883 client VEOLIA for WOODSIDE BURRUP PTY.LTD
Project Assign : PLUTO LNG, 6 UNIT
Fabrication Skid Carbon Filter, piping, Structural Platform and Pressure Vessel
9. JN842 Client SIEMENS, BUMI ARMADA BERHAD
Project Assign : OML 120 OYO FIELD DEVELOPMENT FPSO, 8 UNITS
Fabrication Pressure Vessel VERTICAL FLOATATION CELL VESSEL
(Tag No. 01-555-0-VH-04 with size 1800 O.D x 2900)
Fabrication Pressure Vessel HP SEPARATOR DEOLING HYDROCYLONE
(Tag No.01-555-0-VZ-01A -01B with size 457 O.D x 950)
Fabrication Pressure Vessel LP SEPARATOR DEOLING HYDROCYLONE
(Tag No.01-555-0-VZ-02A -02B with size 457 O.D x 950)
Fabrication Pressure Vessel TEST SEPARATOR DEOLING HYDROCYLONE
(Tag No.01-555-0-VZ-03A -03B -03C with size 324 O.D x 950)
10. JN836 Client VME PROCESS for MODEC
Project Assign : FPSO JUBILLE FIELD UNIT,5 unit
Fabrication Pressure Vessel HP-SEPARATOR
Fabrication Pressure Vessel IP - Separator
Fabrication Pressure Vessel Electrostatic Treater Flashes Vessel
Fabrication Prssure Vessel LP - DEGASER
Fabrication Pressure Vessel Electrostatic Treater
11. JN853 Client VME PROCESS for MODEC
Project Assign : FPSO TUPI PILOT UNIT,10unit
Fabrication Pressure Vessel POLISHING FILTER COALESCER
Fabrication Pressure Vessel LOW TEMPERATURE SEPARATOR
Fabrication Pressure Vessel INLET GAS FILTER COALESCER
Fabrication Pressure Vessel REGENERATON GAS SEPARATOR
Fabrication Pressure Vessel MOLECULAR SIEVE ADSORBER
Fabrication Pressure Vessel PARTICULAR FILTER
12. JN865 Client SIEMENS,BUMI ARMADA BERHAD
Project Assign : OML 120 OYO FIELD DEVELOPMENTFPSO,15 UNIT
Fabrication Pressure Vessel, Storage Tank
Fabrication Pressure Vessel FLOATING CELL VESSEL
13. JN846 Client APACHE for CLOUGH
Project Assign :MARS COMPRESSOR PROJECT – PHASE 2A,5 UNIT
Fabrication Pressure Vessel SEAL GAS FILTER
Fabrication Storage Tank, Pipe Spool, Skid
14.JN804 Client CHEVRON THAILAND EXPLORATON AND PRODUCTION,JRMAPP
Project Assign : PROD.COMP SUCTION SRUBBER,7UNIT
Fabrication Pressure Vessel PROD’N COMPRESORSUCTION SCRUBBER
Fabrication Pressure Vessel EXPANDER SUCTION SCRUBBER
Fabrication Pressure Vessel PIPE LINE COMPRESSOR SUCTION
Fabrication Pressure Vessel VAP RECOVERY SUCTION SCRUBBER
15. JN743 Client APL
Project Assign : MONTARA PROJECT
Fabrication STRUCTURAL & PIPING
16. JN718 Client APL
Project Assign : RELLIANCE PROJECT
Fabrication STRUCTURAL
17. JN695 Client APL
Project Assign : MAARI PROJECT
Fabrication PIPING
18. JN492 Client VME For MODEC
Project Assign : BOABAB FPSO
Fabrication GAS PROCESSING MODULE
Install Vessel,Piping,Storage Tank
19.JN491 Client PT SEMPEC
Project Assign : BETARA PROJECT
Fabrication DECK 900T, JACKET 230T, PILLES 350T
Install Vessel, Piping, Storage Tank, Control Room(completed one Module)
20. JN464 Client KVAERNER PROCESS SYSTEM MALAYSIA
Project Assign : YETAGUN PHASE – 3PROJECT
Fabrication HP PRODUCTION SEPARATOR ( V-3101)
21. JN400 & JN411 Client MERPRO
Project Assign : CONOCO BELANAK
Fabrication SAND WASH PACKAGE
Fabrication TEST SEPARATOR
Fabrication SAND REMOVAL
22. JN318 Client JORDAN KENT METERING SKID
Project Assign : KUWAIT AMENAM
Fabrication METERING SKID
23.JN296 Client J.RAY.MC DERMOTT
Project Assign : NORT PAILIN DEVELOPMENT PROJECT
Fabrication SAND WASH PACKAGE
Fabrication TEST SEPARATOR
Fabrication SAND REMOVAL
24. JN280 Client Gas Service International Pte Ltd
Project Assign : Gelam Station & Air Serdang
Fabrication Storage Tank 4 units
Fabrication Piping, Skid
Install one package Vessel, Piping, Skid
25.JN166 Client PT.PETORSEA/GULF KAKAP
Project Assign : GULF KAKAP Project
Stage Suction Scrubber Cold Separator,Separator,Free Gas Knock Out Drum,Glycol/Condensate Flash Vessel, Hot OIL Expantion Tank,KH Gas Separator,KRA Gas Separator.
Job Description
Verify mill certificate, welder pass, consumables, Fit-up and Visual weld Inspection, Follow The Client Specifications, Code, Standard and Drawing (All approval document for construction and latest revision)
Prepare and Review Welding traceability and Material traceability to comply with requirement
Ensure welding activity refer to Welding Procedure Specification
Prepare NDT request and witness NDT activity, review Radiograph film
Witness and conduct for Portable Material Identification, Hardness test and Ferrite test
Witness Hydro test activity
Ensure the piping erection on the module are correct and close the punch list
Ensure the nozzle orientation and before, during and after vessel fabrication
Submit original NDT report to higher authority or authorize personnel
Collect and keep properly all copy acceptance report from Client and Third Party
Attach all original report to Manufacturing Data Record (Dossier) to completion all document fabrication
Best Regards
Arief Setiyawan