Amruta Shukla
(Open for re-location)
******.********@*****.*** - LinkedIn: www.linkedin.com/in/shuklaamruta16 - 682-***-****
OBJECTIVE
Seeking a challenging position in which I can utilize and further develop my expertise in the field of Industrial Engineering.
SOFTWARE TECHNOLOGIES
MINITAB, ARENA, WITNESS, SIMIO, MS Project, SAP, R Programming, Microsoft Office, WorkPro, AutoCad, MATLAB, SolidWorks, SQL, MODAPTS
EDUCATION
Master of Science – Industrial Engineering May 2017
University of Texas Arlington GPA 3.70/4
Relevant Coursework: Quality Control, Operations Management, Advanced Statistics, Production & Inventory Control, Project Management, Logistics & Supply Chain Management, Production and Costing
B.Tech- Industrial Engineering May 2015
Pandit Deendayal Petroleum University, India GPA 7.4/10
Vice Chair American Society for Quality student chapter
CERTIFICATION
Six Sigma Green Belt Certified, Institute of Industrial and System Engineers (IISE)
R Programming Certificate, John Hopkins University
WORK EXPERIENCE
Continuous Improvement Engineer Moksha Thermoplastics Pvt. Ltd., August 2014 – August 2015
Identify, document and implement standard work procedure and Quality checks related to Production, Maintenance, Quality Assurance and Packaging
●Identified product defects using Root Cause Analysis and evaluated possible failure using FMEA and prevent them through preventive and corrective actions
●Designed a 5S implementation system and carried out KAIZEN projects to increase identify and eliminate waste
●Developed Material Requirement plan and Master Production Schedule to meet customer demand
●Employed EOQ Model to manage raw material inventory by calculating optimal order quantity and reorder point for important material classified through ABC analysis
Process Engineer Larsen & Toubro Ltd, India Jan 2014 – June 2014
●Using Value Stream Mapping and flowchart; scrap disposal system was analyzed and areas of improvement were identified
●The process was optimized using PDCA technique to improve process
●Identified KPIs for manufacturing departments to integrate continuous improvement in the system
●Increased Trip Utilization to 85-90% by creating routing plans and capacity planning
●Time and motion study was conducted to analyze movements of labor. Work standards and protocols were established to increase worker efficiency
ACADEMIC PROJECTS
Facility Design of Warehouse for a Mid-Tier Grocery Firm: Fall 2016
Designing facility plan for distribution centre of mid-tier grocery firm using AutoCAD. Estimating storage space, number of employee, Inbound and Outbound shipping area and type of equipment’s required. Managed inventory using warehouse management system.
Statistical Analysis of Soccer Team: Fall 2015
Using multiple linear regression forecasted performance of each soccer team by identifying variables and leveraging MINITAB for data analysis
Maximize holding strength of glue using design of experiment
To analyze and develop solutions for household problems using the best combination of Time to set and quantity of glue (Factors) impact the holding strength of hook on the wall (response). ANOVA, Bonferroni and Turkey pairwise comparison was used to find an optimal solution.