Post Job Free

Resume

Sign in

NACE Level 2 Certified Coatings Inspector

Location:
Brăila, BR, Romania
Posted:
July 13, 2017

Contact this candidate

Resume:

Iosif George Daniel

NACE Level * Certified Coating Inspector & Newbuilding Inspector

PERSONAL DETAILS

Iosif George Daniel

Barnutiu Simion No.18 Bl. A26 Ap. 45

E-mail address: ac0952@r.postjobfree.com

810321 Braila, Romania

Tel Ro: 004*-*********

Date of Birth: 13.12.1979

Tel No: 004**********

QUALIFICATION PROFILE

Experienced Coating Inspector with a wide-range of knowledge in marine, and oil and gas industry. I have long-term experience working as part of an owner's management supervision team in a Quality Inspector capacity. Supervising inspection workforce and ensuring that the execution of company policy and client / owners agreed specification, relevant standards, and codes of practice are adhered to. Working in a close liaison with owner’s site team inspections, yard production/QA dept., class surveyors, coating manufacturer’s inspection team and other professional authorities. Dedicated, show high sense of commitment and responsibility and able to make decisions.Core competencies and professional strengths include:

• Project management

• Documentation

• Health and safety rules

• Data sheet documentation

• Surface preparation

• Decontaminations

• Lightning items

• Repair procedure

• Pre-blasting and shot blasting

• Staging and de-staging (specific cargo chemical tanks)

• Ventilation

• Checking paint conditions

• Sea water test

• Stripe coating

• Sea water test

• Reporting

EDUCATION

2000

Edmond Nicolau Theorethical High School Gradueted

EMPLOYMENT HISTORY

05.2008 - Present

NACE Level 2 Certified Inspector & Newbuilding Inspector, Rolldock

Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

04.2007 – 04.2008

Newbuilding Inspector & Coordinator, Jumbo Shpping

Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

02.2006 – 03.2008

Paint and steel worck inspector, Eneea Shipping

Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

05.2003 – 02.2006

Quality control manager, Metacom sandblasting

Main activities and responsibilities: Quality control for all painting and steel works.

During activity, I have cooperated with paint applicator inspector, owner representative, Damen Services Galati.

PROJECTS

05.2014 - Present

MC-Class Module Carriers, BigRoll

Building in China Dalian at Cosco Shipyard. BigRoll is a joint venture of BigLift Shipping and Rolldock Shipping based in the Netherlands. BigRoll Shipping is building four, state-of-the-art MC-Class Module Carriers: BigRoll Barentsz, BigRoll Bering, BigRoll Baffin and BigRoll Beaufort. The Finnish Swedish 1A Ice Class is specifically designed for the marine transport of the major modules and equipment for large energy projects both onshore and offshore to remote areas. Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

02.2013 – 03.2014

ST - Class, Rolldock

Build in Germany Flensburg Flensburger Shipyard under my supervision the ST - Class (second generation of our multifunctional heavy lift, semi-submersible, roro vessels) examples: Rolldock Star and Rolldock Storm. Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports / weekly reports and checking the C.T.F (coating technical files).

2011 - 2012

Dry docks, Rolldock

I have attended many dry docks: Drydocks world Dubai, Drydock Singapore, Draydock Rotterdam Damen... Checking the condition of the W.B.T and the condition of the antifouling system, water jetting and coating the failures found and reporting all coating/environmental conditions.

04.2009 - 02.2011

S – Class, Rolldock

Build in India, Hazira in L&T Shipyard S-Class vessels under my supervision multifunctional heavy lift, semi-submersible, roro vessels examples: Rolldock Sun and Rolldock Sea. Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

04.2007 – 11.2008

Heavy lift vessels, Jumbo Shipping

Build in Romania, Galati Damen Shipyard Heavy lift vessels under my supervision multifunctional heavy lift, vessels examples: Jumbo Fairplayer and Jumbo Jubilee. Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

10.2006 - 03.2007

Bitumen Tankers, Eneea greece

Build in Bulgaria, Rouse JSC Shipyard Bitumen. Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files.

2003 – 2006

Chemical vessels, Damen

Build in Romania, Galati Damen Shipyard Chemical vessels. Responsible for the supervision of steel work and the coating work from primary surface preparation, secondary surface preparation to the final inspection. Inspection of the blasting coating and DFT, ensure the application according to the standard (ISO, NACE...etc). Checking the environmental conditions, testing for the surface profile, cleanliness, water soluble chemical salt, dry film thickness and adhesion. Ensure the coating application of the W.B.TK (water ballast tanks) has been carried out under PSPC rules. Find out the painting faults and failure. Control the immersion time for W.B.TK and flat & side and bottom. Make the daily reports/weekly reports and checking the C.T.F (coating technical files).

LANGUAGE

Romanian

Native language

English

Oral: Excellent. Written: Excellent

German

Oral: Basic. Written: Basic.

TRAININGS

2010

NACE – CIP Level 1

2012

NACE – CIP Level 2

TECHNICAL SKILLS

Software

AutoCAD-2D; AutoCAD-3D

NAVISWORK Freedom/ Simulate

Microsoft office Excel / Word / Power Point(Expert)

REFERENCES

Aart schreuder

Newbuilding Manager, Rolldock. Contact info: +316********, ac0952@r.postjobfree.com



Contact this candidate