Keith R. Johnson *
Email: *********@*****.*** LinkedIn: http://www.linkedin.com/in/keithrobertjohnson Phone: 909-***-**** Location; Southern California Email: *********@*****.*** LinkedIn: http://www.linkedin.com/in/keithrobertjohnson Phone: 909-***-**** BIGGER HEADER
Seeking a role in development, transition and/or readiness project management for new product development, operational transitions and/or technological initiatives implementation. INDUSTRIES YEARS ROLES _WORK EXPERIENCE (% TIME) WORKGROUP PROJECT MANAGEMENT - Provided leadership for project teams, coordinated research and development in automotive/ semiconductor OEM manufacturer(s) and software development projects. New design processes developed utilizing a Design mock up to retain design intent and check against customer and branding requirements, created the Engineering mock up to test, vendor 1st articles, create Engineering Bills of Material’s and tolerance studies and then created the Production model to train, finalized Manufacturing Bill of Material, scheduled in cut-in, and conduct endurance testing. Project Planning created full SW and product SDLC project plans through initiation, planning, execution, monitoring and control and close in phase gate project that had some elements of agile functional inclusion. Solely responsible for on-time coordinating code integration from five functional manager groups for a 245 mil/yr. software development project. Developed (5) project plans for automotive products ranging from 50K-150K. Trained in Agile Scrum. Quality Management Approach, Planning, Assurance Procedures, Control, and Tools. Test Case mapping to project requirements and storyboard development. Conducted Beta testing planning and execution with customers, and Facilitated software “bug scrub” meetings. Utilized 3D structural analysis into drawing design process. Member of Change Control and Material Review Boards. Conducting impact analysis and reintegration requirements into project plan through coordination. Managed project risks occurrences and response actions. Set project priorities/cost parameters for design engineers, fabrication tooling and established resource requirements Retail Security & IT Infrastructure (1) Global Services Field Technician New Business Services (3) Business Planning Associate Network Operations/Telecom (5.5) Network Frame Maintainer R&D/Automotive (1) R&D Project Manager
Automotive Transport (2.5) Business Owner - Transport Surveyor/Architectural (2.5) Land Surveyor, Architectural Software Development (2) Software Project Manager
R&D/Semiconductor (6) Mechanical Design Engineer
Network 42%
Electrical - Mechanical
Assembly 31%
Cost Accounting 11%
Scheduling 8%
Training 8%
Team Leadership 42%
Project Planning 31%
Quality Control 11%
Change Management 8%
Tasks and Priorities 8%
Mechanical Design Engineer
Manufacturing Engineer
Quality Assurance
System Level Design
Product Engineering
Keith R. Johnson 2
Email: *********@*****.*** LinkedIn: http://www.linkedin.com/in/keithrobertjohnson Phone: 909-***-**** Location; Southern California Email: *********@*****.*** LinkedIn: http://www.linkedin.com/in/keithrobertjohnson Phone: 909-***-**** BIGGER HEADER
ENGINEERING - System level automation design, prototyping and support for chemical process rotary robot. Increased customer maintenance cycles 250% through refinement in machining techniques. Tested Programmable Logic Controller variables for motion control velocity and acceleration values for batch timing count studies and to set gearing/stepper motor product sourcing specifications. Designed a world’s first fire suppression system approved by Factory Mutual. Redesigned chemical containment fume hood utilizing 3D air flow and empirical/smoke analysis to improve safety and lower operating costs. Achieved customer exhaust facility air draw savings of 20% through by baffle redesign. Machine coded CNC routers. Utilized 3D printing of parts for prototyping and proof of concept tests. Quality Assurance, Practical use of Standard Measurement Instrumentation for inspection of 1st Articles, rejected parts and assemblies utilizing Geometric Dimension and Tolerance. Oversaw training to designers of ANSY 14.5 drawing standards and externally at vendor by holding product assembly training sessions explaining the critical factors in our parts and assembly requirements. Led SEMI/ISO 9001 compliance. Manufacturing engineering Implemented Lean and 5S Kaisen principles in production work instructions, tooling, and inventory control and purchasing. Corrected inventory errors up to 30k per assembly part number family group and updated 60% of the engineering bills of materials in less than 2 months while setting newly implemented Kanban inventory levels for manufacturing engineering, time studies estimated that labor savings increase by 30% by our redesigned Jig and GMP changes. Investigated and solved build and process issues and created standard operating procedures help improved build cycles. Made in house or buy decisions through cost benefit analysis, capacity schedule loading. OPERATIONS - Production Forecasted shop loads and process procedures establishing Shop Floor Control (SFC) for production. Specified equipment, tooling, materials, methods of manufacturing are needed for build cycle improvement, safety and quality issues. Established minimum/maximum inventory levels from sales projections and Material Requirements Planning. Assigned costs to assemblies to roll up for costing. Conducted training classes for Field Service and Production. Electrical/mechanical assembly and machine shop tooling experience, test units, velocity meters, in clean room environments. Hands-on electrical and mechanical assembly and machining skills in robotics, wet process tools, fire suppression systems, circuit boards, DNA temperature cyclers, chemical wet process tools, automotive products. Network CO tech for 20K+ telecom customers maintaining main distribution frames (5), installs/removals and troubles, maintenance. Integrated network to outside plant. Provide access/disable/trouble-shoot support for local loop into system network via central office distribution frames. Field technician dock and lock security for retail merchandising, break fix and healthcare informatics IT infrastructure. SOFTWARE MS Word
Publisher
MS Excel
Google Docs
MS PowerPoint
ClearQuest
AutoCAD
Pro-Engineering
SmartCam
Essbase
Visibility
Ask ManMan
MAS90
MS Project, Visio
SharePoint
Visio
Adobe Photoshop
Adobe Illustrator
Corel Draw
Corel Capture
PageMaker
Keith R. Johnson 3
Email: *********@*****.*** LinkedIn: http://www.linkedin.com/in/keithrobertjohnson Phone: 909-***-**** Location; Southern California Email: *********@*****.*** LinkedIn: http://www.linkedin.com/in/keithrobertjohnson Phone: 909-***-**** BIGGER HEADER
WORK EXPERIENCES Global Services Field Technician SECURITY & IT SOLUTIONS, Mobile Technologies, Inc., West L.A., CA - < 1yr present Business Planning Associate BUSINESS SERVICES Financial Mgt and Business Start-up Services, Carlsbad, CA – 3yrs Central Office Frame Maintainer – NETWORK OPS/TELECOM Verizon Communications, Big Bear Lake, CA - 5 1/2yrs Project Manager - R&D/ AUTOMOTIVE Big Bear American Made Choppers, Inc., Big Bear Lake, CA <1 yr. Business Owner – AUTOMOTIVE TRANSPORT KRJ Trucking, Inc., Big Bear City, CA - 3 yrs. Land Surveyor/Architectural Drafting – SURVEYOR/ARCHITECTURAL Mapco, Big Bear City, CA - 2 1 2 yrs. Project Manager – SOFTWARE DEVELOPMENT Hyperion Solutions, Inc., Sunnyvale, CA – 2 yrs. Mechanical Design Engineer – R&D/SEMICONDUCTOR Akrion PED (Submicron Systems) Santa Clara, CA – 6 yrs. __EDUCATION Master of Science, Capella University - School of Business and Technology, 12/2013 Information Technology with a Project Management Specialization– graduated “with distinction” Bachelor of Science, California State Polytechnic University Pomona - College of Environmental Design Urban and Regional Planning
__CERTIFICATE PROGRAMS Capella University, SharePoint, Web Expressions, MS Project, 2010-2013, Minneapolis, MN VzLearn, CompTIA Project +, 2010 Verizon
VzLearn, IT Business Analyst, 2010 Verizon
Project Management Institute (PMI), Managing Risks on Projects, 2001, Burlington, VT Hyperion Solutions, Hyperion Essbase, 2000, Sunnyvale, CA University of California Santa Cruz Extension, Introductory JAVA Programming DeAnza College, Pro Engineering – R2000i, Cupertino, CA Camco Solutions Inc., Smart Cam – v.11.5, Milpitas, CA, Center for Manufacturing Education, Material & Capacity Requirements Planning (MRP), APICS Coursework Basics of Manufacturing, Sunnyvale, CA Cal Poly Pomona, Geographical Information Systems (GIS), Pomona, CA Mesa College, AutoCAD, San Diego, CA
_VOLUTEERING Fund Raising Coordinator – VET SERVICES – 2 1 2 yrs. present, Pause-4-Paws, Inc., Big Bear City, CA
Assisted in planning and execution of fund raising activities to provide free cat neutering for Bear Valley. Highlight: Planning 1st year car/motorcycle show for 2017. San Bernardino County Commissioner – COUNTY SUPERVISOR APPOINTED – 2 yrs. Big Bear Valley Recreation and Park District, Big Bear Lake, CA Representing the area of Erwin Lake for land purchase and cost benefit site analysis development of facilities, new construction and safety concerns. Highlight: My analysis led to purchase of Erwin Lake Tennis Ranch – $2.1 million. Building Designer/Surveyor - SURVEYOR/ARCHITECTURAL - 2mo., Paid, donated back to school Thaba-Tseka Technical Institute (TTI), Lesotho, Southern Africa Designed school building for Elementary School grant proposal. Conducted site feasibility survey for Toyota auto shop building site. Conducted 1st town road survey for District Secretary (Governor). Donated computers to school for lab. Highlight: Conducted 1st town survey of Thaba-Tseka!