Yuvaraj Mani
+91-974**-***** *********@*****.***
Page1
Professional Summary:
Around 7 years of Facility Management Technical experience in wide range of companies such as
Manufacturing
Building Management Service
Supply chain/Assembly Plant
Worked in various MNCs like Saint-Gobain Glass, DELL, MACLELLAN and EMRILL.
Managed the Team of 30+ Facility Management Technicians and Contractors.
Contributed as Junior Engineer/ Facility Supervisor/ Electrical in charge/Graduate Engineering Trainee
Well versed with PLC Control and Monitoring such as Allen-Broadly, SIEMENS of FURNACE System Operation
Experienced in Electrical Equipment Installation, Maintenance.
Have in-depth experience in BMS Service such as Honeywell, ABB and Schneider.
Contributed in Data Center Facility Management Service.
Proficient in HVAC System Trouble Shooting and Maintenance (Carrier, Daikin Mcquay and York)
Managed Diesel Generator Maintenance system for Fuel Systems, Batteries, Coolant Systems
Monitored 11KV/440 V substation with MV/LV Distribution Work. Closely followed Maintenance schedules for all Critical equipment
Well aware of ISO 45001- Occupational health and safety
Accurate Spare parts stock maintenance to respond to emergency and ad-hoc situations
As a Lead Trainer, Prepared Standard Operating Procedures (SOP). Safety Instructions. Operating Manuals, Hand-books for Quick reference, Building Layouts for Electrical, Lighting, Plumbing and Fire Water line Connections
Education
Graduate(BE-EEE) from KCG College of Technology-Chennai-Tamil Nadu
Additional Skills
AutoCAD 2012
5S Practitioner
Fire Fighter and Life Saver
Lead Trainer for New Joiners.
Yuvaraj Mani
+91-974**-***** *********@*****.***
Page2
Career Summary:
Company Industry Type Client
From
Period
To
Period
Years of
Experience
VASU Builders, Palakkad
Property
Developers
Not Applicable Mar-2017 Till date 5 Months
EMRILL Integrated
Facility Management
LLC-Dubai Service Industry
Novus Community
Management
Services Aug-2013 Feb-2017
3 Years
7 Months
McLellan Integrated
Service India Limited-
Chennai Assembly Plant
DELL Computers
Limited Oct-2011 Aug-2013
1 Year
11 Months
Saint-Gobain Glass
India-Chennai-India
Manufacturing
Plant Not Applicable. July-2010 July-2011 1 Year
Career History:
Company : VASU Builders, Palakkad
Role Electrical In-Charge Start duration Mar-2017
End duration Till date
Responsibilities:
Review electrical engineering drawings and refer issues requiring changes.
Assign job tasks and work as per electrical project schedules.
Review all electrical drawings with Lead men performing on assigned jobs to them.
Stimulate fabrication standards to ensure quality work attained from assigned staff.
Recruit, guide, train, monitor and terminate assigned employees as required.
Recommend effective solutions specified particular weight related to employment status of employees.
Schedule, assign, plan and supervise electrical shop personnel performance on different electrical projects.
Plan and prepare work and equipment usage schedules.
Develop electrical expenditures priority and equipment and appliance maintenance procedures.
Develop electrical material and labour forecasts.
Provide information on modification on work policies, safety regulations, electrical codes and specifications.
Yuvaraj Mani
+91-974**-***** *********@*****.***
Page3
Company : EMRILL Integrated Facility Management LLC-Dubai Client
Name
Novus Community Management Services
Role Facility Supervisor
Company
Type
Service Company Start duration Aug-2013
End duration Feb-2017
Responsibilities:
Coordinated maintenance programs with user units to determine relative priorities and on-time completion of work in critical operating facilities with available work force.
Assigned maintenance manpower within his assigned area to meet daily changes in operating requirements and priorities.
Recommended special work schedules, overtime or contractor participation to meet unusual or emergency situations.
Plan assigned field-wide, analyze and sequence all work requests; estimate required manpower,
Justified when necessary requests for additional manpower, overtime or extension of unit downtime.
Assured that all details of material and equipment are available at jobsite.
Executed the actual work during a period, coordinate activities of assigned craftsmen and such other personnel as are assigned (night shift coordination, etc.) to assist in the execution of the work.
Review Project Proposals to assure that maintenance aspects are considered in final design.
Coordinated maintenance work between Maintenance Divisions when services from various divisions are required.
Developed engineering standards, specifications, engineering practices and procedures for maintenance, repair and turnaround of plant equipment's.
Developed schedules, and worked within a strict project time line to complete these tasks to meet the deadline.
Conducted failure analysis of mechanical and electrical failures as well as unexpected maintenance problems and operational problems related to equipment.
Coordinated supplies of linen etc. in order to maintain sufficiency Responded to emergencies as requested or needed.
Delegated work to meet business objectives and goals. Maintained a high standard of personal appearance and grooming. Vacuuming carpets and mopping and sweeping tile floors.
Trained New Joiners and conducted skill assessment
Compliance with all health and safety standards.
Liaised with building monitoring systems service provider with highlighting problems and rectifying the same.
Ensured that safety training was provided to staff and that proper safety practices were followed.
Liaised with equipment vendor, consultant and contractor on engineering drawings, calculations and quotations for procurement of new equipment, equipment spare parts, troubleshooting and repair as well as for the installation and improvement.
Ensured proper execution and closure of work orders for repair with regard to manpower availability& skills and health & safety.
Implemented successfully 5S system in the maintenance department and production plant to improve occupational health and safety, ergonomics and efficiency.
Recorded and interpreted essential workshop data such as equipment utilization, stock (spare parts) records, repair frequencies and information necessary for budgetary and cost control. Yuvaraj Mani
+91-974**-***** *********@*****.***
Page4
Company : MacLellan Integrated Service India Pvt Limited.Chennai.TN Client Name DELL Computers India Limited
Role
Junior Engineer- Facility
Maintenance
Company
Type
Assembly Plant Start duration Oct-2011
End duration Aug-2013
Responsibilities:
Developed engineering standards, specifications, engineering practices and procedures for maintenance, repair and turnaround of plant equipment.
Conducted failure analysis of mechanical and electrical failures as well as unexpected maintenance problems and operational problems related to equipment.
Liaised with equipment vendor, consultant and contractor on engineering drawings, calculations and quotations for procurement of new equipment, equipment spare parts, troubleshooting and repair as well as for the installation and improvement.
Ensured proper execution and closure of work orders for repair with regard to manpower availability & skills and health & safety.
Implemented successfully 5S system in the maintenance department and production plant to improve occupational health and safety, ergonomics and efficiency.
Recorded and interpreted essential workshop data such as equipment utilization, stock (spare parts) records, repair frequencies and information necessary for budgetary and cost control.
Scheduled, supervised and inspected maintenance, turnaround, installation and repair of a maintenance team consisting of over 20 technical specialists and 2 maintenance specialists.
Data center facility arrangement as per requirement at DELL COMPUTERS INDIA LTD
Conducted troubleshooting in conveyors, Buffers and AC&DC Drives.
11kv/ 440v substation with all accessories and cable work and MV/ LV Distribution network
HVAC systems troubleshooting and maintenance.
Diesel Generator set operation, maintenance of Fuel Systems, Batteries, Coolant Systems Company : Saint-Gobain Glass(Sekurit) India Limited-Chennai.TN Role Graduate Engineering Trainee Start duration July-2010 End duration July-2011
Responsibilities:
Contributed in Sekurit-Project Department.
Performed the tasks of providing technical assistance to coordinate new systems associated with capital investments
Responsible for providing technical support to maintenance, operations and technical Service on instrumentation problems including issues related to the and programmable logic controllers
PLC control and monitor the whole FURNACE system operation such as heating filament temperature monitoring and maintaining, sequentially feeding glass into furnace, error detection while passing glass through conveyors, commanding previous and after equipment to ready state.
Good ability in service and maintenance of all types of industrial instruments Like Pressure Gauge, Temperature Gauge, Temperature Scanner, Weighing Machine, RTD Sensor, Conductivity Sensor, PH Sensor
Completed electrical installation, engineering, HMI and PLC application software development, servicing and training, and commissioning of user support
Yuvaraj Mani
+91-974**-***** *********@*****.***
Page5
Education:
Programme Institution\University Year of Passing
Percentage of Marks
B.E- Electrical and
Electronics Engg
KCG Engg College/
Anna University. Chennai.TN
2010 68 %
D.E.C.E-
Diploma in Electronics and
Communication Engineering
Little Flower Polytechnic-
Chennai.TN
2007 92 %
Industrial Training Institute
(ITI)- Electrical
NCVT-Salem.TN 1997 86 %
Personal Details:
Name Yuvaraj Mani
Date of Birth 02-July-1984
Marital Status Married
Permanent Address
S/o.K.Mani
11/367, Kosathara, Chittur
Palakkad- 678 101-Kerala.India
Languages Known
English, Tamil, Malayalam – Fluent, Hindi-Fair