Post Job Free
Sign in

Power Plant Engineer

Location:
MAS, TN, 627859, India
Posted:
June 29, 2013

Contact this candidate

Resume:

CURRICULAM VITAE

Govindan.M

Communication Address

Mail ID: ***********@*****.***

School Street,Edaiyarthavanai post

Mobile: 096********,081******** Tenkasi,

-627859

Tirunelveli Dist

TamilNadu.

India.

OBJECTIVE

To work in the most challenging position with an organization

that provides ample opportunities to learn and to contribute.

PROFESSIONAL SUMMARY

. A result oriented professional with 5 years experience in Technical

Engineering Consultancy Services for complete Thermal Power Plant &

Boilers" and detail design & engineering service, Erection &

commissioning of Thermal Power Plant and Project Engineering.

. Currently associated with ARK Engineering & Power Consultants P Ltd,

Trichy as Electrical & Instrumentation Project Engineer..

. Ability to mentor a team and good interpersonal skill.

. Preparation of engineering specification for procurement of DCS &

Field instruments

. Technical evaluation of offers

. Preparation of control system drawings for closed loop controls

. Strong knowledge in turbine erection & commissioning coordinate with

Triveni Group of company, which handle Triveni turbines..

. Turbine erection and commissioning coordinate with CVL Group of

company and Triveni.

EDUCATIONAL PROFILE

Bachelor of Instrumentation and control Engineering in Arulmigu

Kalasalingam college Of Engineering,Srivilliputur. Affiliated to Anna

University, Chennai. -- 2007-2010.

Diploma in Electronics & Communication in MSPVL Polytechnic College,

Pavoorchatram.-- 2001-2004.

Responsibilities:

Technical Engineering Consultancy Services for complete Thermal

Power Plant & Boilers and detail design & engineering service such as.

> Finalization of control system philosophy

> Design of system architecture

> Preparation of input output list

> Preparation of engineering specification for procurement of DCS & Field

instruments

> Technical evaluation of offers

> Preparation of control system drawings for closed loop controls

> Preparation of interlock scheme drawings for digital control

> Set points and range finalization for analog inputs/outputs

> Preparation of junction box grouping.

> Cable schedules & DCS Termination Schedules

> DCS vendor drawing review

> Witnessing factory acceptance test under simulated conditions

> Site supervision services for erection and commissioning.

> Approval of P & ID and Electrical control circuit.

Achievements/Project Handled:

> 1x5 MW CPP,SPAC TAPPIOCA INDIA PVT LTD, Erode.

> 1x8 MW CPP, NR ISPAT POWER PVT LTD, Raigarh.

> 1x6 MW CPP, KOHINNOR PAPER & NEWSPRINT P LTD, Kolkatta.

List of Activities Done

> Preparation of DCS Input/Output list for power plant as per P & I

Diagrams.

> Preparing Specifications, Technical Data sheets, & Design Basis Report

for DCS.

> Working knowledge of various make DCS during Factory Acceptance Test

(FAT) .

> Preparation of field instruments Hook-up Diagrams and Impulse piping.

> Assistance for Erection and Commissioning of field instruments and

control valves.

> Knowledge of PID Controller.

> Calibration and trouble shooting of field Instruments.

> Preparation of Field Instrument list as per P & I Diagram.

> Preparation of Closed Loop, Open Loop logics, Interlocks, & write-ups for

a complete project.

> Preparation of Technical comparison chart for DCS.

> Attending Techno-Commercial meeting for DCS finalization.

> Inspecting Instrument Panels and DCS.

> Preparation of Signal cable schedule, Bill of material for Cables.

> Preparation of JB & Instrument location diagrams.

> Preparation of Termination details for field instruments, JB, DCS, and

MCC.

> Preparation of DCS Factory Acceptance Test (FAT) procedure.

> Reviewing DCS GA, System Configuration, and power distribution Scheme.

> Reviewing DCS Module loading drawings and Graphics design Philosophy.

> Reviewing ASH Handling System Drawings and Documents.

EXPERIECE

Name of concern: Naveen industrial corporation coimbatore

Designation : Electrical Technician

Working period : June 2004 to Dec-2006

EXPERIECE

Name of concern: Parasakthi Engineering

Designation : Site Engineer -E&I

Working period : 18th May 2010 to 16th june 2011

EXPERIECE

Name of concern: ARK Engineering and Power Consultants (P) Ltd

Designation : Project Engineer

Working period : 23rd june 2011 to till date.

ERECTION & COMMISSONING EXPERIECE PROFILE

> Field instruments installation, calibration and Loop checking.

> Understand control logics and P&ID Diagram related to process

> Understand and make the Hook up Diagram.

> Loop Checking of PLC and DCS Panels.

> Calibration of all, flow transmitter and indicators.

> To identify problems, report stating problems Solution of problems &

Suggestion to eliminate operational troubles.

> Preparation of I/O List.

> Installation of all instrumentation.

> Known about MOV operation.

> Known about contact type vibration sensor and non contact type

vibration sensor.

> Known about Woodward governor.

> Material indenting, Spares maintenance.

Part of my work in 6 & 8MWe project

> Woodward 505E configuration.

> Field instrumentation like speed sensor,vibration sensor,Axial

displacement,control valves,Transmitter and Temperature elements fixed

and calibrated.

> TCP, LGB panel and VMS panel erection and commissioning.

> MCC cable termination from DCS panel to MCC panel.

> Field instruments mounting and cable termination from field to J.B and

J.B to DCS panel.

> Flue gas analyzer installation and commissioning.

COMPUTER PROFICIENCY

Language: MS Office.

Operating System: Windows.

DECLARATION

I hereby declare that the information furnished above is correct to

the best of my knowledge and test of my understanding.

Date:

Venue: (M.Govindan)[pic]



Contact this candidate