E-mail Address : *********@*******.***
Telephone Numbers : (Mobile) 002***********
Family Name: Mohamed Hassan Name: Mohsen
Nationality: Egyptian. Date of Birth:
Educational Attainment: B Sc. Mechanical Engineering Alexandria University
(1974)
Profession : Project Manager
Languages : Arabic "Native", English Very Good "Read, Write &
Speak".
Social status : Married, have two children.
Summary of Experience:
Having more than thirty years experience of working in various projects
related to Oil & Gas facilities, and petrochemical plants.
Most of the experience is related to maintenance of Petrochemical
plants/shutdowns, EPIC projects management, project construction management
of process equipment, piping system engineering and design, new
constructions of pipelines, piping/equipment replacement/upgrading and
related construction works.
Worked extensively and gained hands on experience with respect to Oil &Gas
Processing Facilities, special heavy equipment such as Shell & Tube heat
exchangers, Fin-Fan coolers, Valves of all types used in highly corrosive
atmosphere, high pressure vessels, towers and Centrifugal Pumps. Perform
the role of Project/Construction Manager and Team Leader in various project
activities.
Responsibilities include Project Management, technical evaluation/
tendering for EPC projects, project engineering, material/equipment
procurement, replacement jobs, construction activities, plant
modifications, shutdowns, tie-ins, upgrade of existing facilities, pre-
commissioning and commissioning of related activities.
Familiar with live operation requirement, risk assessment, root cause
analysis (RCA) and HSE regulations in running plants.
Executed several projects as project and construction manager, covering EPC
Onshore Gas/oil projects, HAZOP study, tie-ins to existing facilities,
construction works, revamp and shutdown works. Manage EPC and engineering
projects in UAE (GASCO), SYRIA (AFPC), Qatar and EGYPT.
Have strong understanding and extensive experience in Project management,
coordination of multi-disciplinary and multi-cultural project teams for
vetting and supervision of the project.
Experienced and have good knowledge of Shell DEP, QP Standards and
international codes ASME, ASTM, API and TEMA.
Have experience in piping/ pipeline metallic, GRV, PVC Material along with
construction activities.
Verification and vetting of drawings including discipline checks and
compliance with specifications.
Experienced with construction and deliverables of piping /pipelines above
and underground such as Design Basis, crossing reports, alignment sheets
drawings, route maps, pipelines Station approach drawings, material
specifications, piping wall thickness calculations, expansion loops, MTO's,
field supports, etc..
Main Courses attended:
o Project Management course for PMP
o Quality Management System
o Management and Supervisory skills
o CAESAR II software & applications
o Cost estimation.
o Plant Design System (PDS - Intergraph)
o Basic first aid course, H2S awareness and escape course and HSE
related courses.
Major project Experience:
From September 2011 till June 2013: (Qatar)
COMPANY : Black Cat Engineering and Construction Ltd
POSITION : Project Manager.
EPIC for Upgrading the Instrument Air System at KNDS within Dukhan Field
Client:: Qatar Petroleum
QP compressor package have been in service for long time and have become
unavailable with frequent failures, the controls of the existing units are
obsolete and cannot be integrated into the DCS System.
It has been established that the Instrument Air System upgrade shall be
implemented by constructing a new Instrument Air Compressor facility.
Complete with new oil-free Rotary Air Compressors, Filters, Air Coolers,
Air dryers, wet air receivers, Additional Air Receivers& Buffer Tanks and
with foundation fieldbus redundant PLC-based Master control which is fully
integrated with the plant DCS.
EPIC project of Waste Water Treatment Package at Dolphin Energy Co.
Client: Dolphin Energy Ltd - Qatar.
Procurement, residual engineering and installation of nine related
filtration, pumping spent soda Skids including civil foundations,
interconnecting piping, erection of dirty/clean backwash tanks and
underground GRV drainage piping, integrating to existing DCS System and
commissioning.
From year Jan. 2007 till 30.07. 2011: (Abu Dhabi- UAE)
COMPANY : Abu Dhabi Gas Industries Ltd (GASCO)
POSITION: Project Manager.
Duties & Responsibilities:
- Share in conceptual study and preparation of EPC tender packages
for competitive bidding.
- Share inTechnical specifications review and selection.
- Contractors/Vendors evaluation.
- Conduct technical evaluation/bid analysis of tender bidders and
recomendation for award.
- Participate in HAZOP studies.
- Particpate in the development of project budgets and schedules.
- Lead negotiations for technical clarifications and variations to
minimize /eleminate commercial claims
- Direct and monitor the application of appropriate procedures and
standards in the execution of project activities, in line with
international codes and company best practices.
- Review and approve progress reports and invoices
- Supervise site construction activities.
-
EPC Projects handled:
- Sharing in engineering and execution of Petrochemical plants in Egypt
(VCM, PVC,
And chlorine plants). Evaluate technical proposals of centrifugal
pumps and Shell &
Tube heat exchangers.
- Gas Plant expansions in Abu Dhabi Gas Industries Ltd (OGDI & OGDII}
- Construction of pipelines and flow lines projects.
- Construction superintendent of oil gathering stations
- Onshore Oil & Gas Development facilities.
- Oil and Gas processing facilities comprised of separation and
stabilization
- Gas and water injection.
- Hydrocarbon and NGL recovery projects.
- Flaring systems.
- Upgrading of injection compressors capacity and related piping.
- Replacement of rich amine CS piping by upgraded SS material,
- Replacement of convection and radiation sections of heaters.
- Upgrading/Replacement of CS coolers bundle with upgraded incoloy
material.
- Capacity enhancement and de-bottlenecking projects.
- New electro chlorination units.
- Prepare, issue, and follow up through to commissioning and handover
of Engineering Packages and Construction "EPC" contracts.
- Review and comment on Engineering Piping Packages prepared by
consultants /EPC
Contractors.
- Review contract requirements for project execution, organize the
preparation of the Technical Document Register, and identify the
requirements and the scope of work,
- Review specifications of manual valves and piping materials, review
drawings (P&ID, GA, Piping Plans and Isos' etc Identify/comment
and resolve discrepancies and divergences from original proposal
through instigation of technical queries to EPC contractor.
- Review / supervise and comment on stress analysis reports prepared by
consultant in
CAESAR II software and modeling works in PDS, ensure that isometrics
are updated
as required. Monitor the identification of stress factors and layout
feasibility, resolve
design irregularities and Piping Clashes appear through PDS. Provide
stress and piping loads to civil engineering group.
- Carry out/evaluate stress analysis for piping systems by "CAESAR II"
software and
propose different scenarios to reduce stresses in critical
locations.
- prepare, review/comment of all types of manual valves, safety valves,
ESD and
control valves (mechanical part).
- Evaluate deviations/ exception to tender/ engineering documents of
technical
proposals.
- Define man-hours estimate.
- Define engineering deliverables and schedule.
- Define interface with other disciplines.
- Organize technical proposal write up related to the piping package of
projects.
- Identify particular technical and execution feature that may have an
impact during
project execution.
From year 1998 until 2006: (Abu Dhabi/ UAE)
COMPANY : Abu Dhabi Gas industries Ltd (GASCO)
POSITION : Senior Dev. Engineer.
- Study field problems and propose remedial measures.
- Piping systems design, and management of EPC Piping projects.
- Prepare Scope Of Work and EPC packages of different projects.
- Conduct technical evaluation/bid analysis of tender bidders and
recomendation for award.
- Procure materials necessary for modifications and upgraded
equipment.
- Familiar with maximo system and CAESAR II stress analysis software.
- Investigate and study recommendations of stress analysis for
different piping systems.
- Work execution follow-up.
- Material specification review.
- Review design for piping, pipelines, tanks, pressure vessels,
towers, centifugal pumps.
From year 1996 to 1998: (SYRIA Arab Republic):
COMPANY : AL-FURAT Petroleum Company (AFPC)
POSITION : Project/Construction Engineer
Duties & Responsibilities:
- Construction engineer/coordinator of pipelines and flowlines.
- repare detailed engineering design and drawings for approved capital
budget projects, material specifications, detailed scope of work and
technical specifications.
- Carry out bid analysis evaluation and prepare recommendation for the
award.
- Study field problems that have design oriented solutions and propose
remedial measures.
- Participate in Hazops.
- Supervise the execution of project activities of pipelines and
equipment erection.
- Ensure compliance of drawings with specifications and standards.
- Participate in project briefing, bid evaluation and neogotiations.
- Flowlines coordinator.
From 1992 to 1995: (SYRIA Arab Republic):
COMPANY : Al-FURAT Petroleum Company (AFPC)
POSITION : Mechanical Maintenance Engineer
Duties & Responsibilities:
- Recommends the required remedial actions and plant modifications.
- Issue preventive maintenance procedures of various equipment.
- Prepare annual shutdown schedules and planned maintenance programs.
- Raises requests and follow up the replenishment of warehouse stocks.
- Study field problems and propose remedial measures.
- Prepare technical reports and various monthly, periodic reports to
keep management advised of status.
From 1984 to 1991: (Alexandria, Egypt)
COMPANY : Egyptian Petrochemical Company
POSITION : Graduated in the following Positions
Maintenance Manager of V.C.M. Plant; from 1990 till 1991
Duties & Responsibilities:
- Provide technical and maintenance information support.
- Monitor all kinds of mechanical maintenance in VINYLE Chloride
MONEMER plant (V.C.M.).
- Coordinate with the maintenance planning engineers, and other
operating sections in preparing planned maintenance programms for
all plants equipment installations, pipelines, vessels, towers ...
etc.
- Assess and follow up the equipment and facilities condition by
evaluating the results of performance checks and periodic
inspections.
- Prepares reports and studies to assist in evaluating the performance
of maintenance activities.
- Set up equipment history system.
- Raise requests and follow up the replenishment of store stocks to
assure the availability of spare parts required for both normal and
major repairs.
- Participate in training and development of the new engineers.
- During my practical experience, always keeping myself informed with
the engineering codes and regulations such as ASTM, ANSI, ASME, API
and TEMA.
- Review the specifications of various materials and their behavior
against acids facing practical problems of corrosion.
Section Head of Static Equipment (V.C.M. plant); from 1987 till 1989
Duties & Responsibilities:
- Supervision of mechanical maintenance planning office.
- Supervise the execution of major overhauls, specific repairs and
trouble shooting for towers, reactors, furnaces, heat exchangers,
vessels... etc
- Prepare planned maintenance programs.
- Recommend the required remedial actions and plant modifications.
Construction Engineer; from 1984 till 1987
Duties & Responsibilities;
- Construction engineer of reactors, furnaces, heat exchangers,
pipelines, compressors crackers and pumps,
- Study the licensor and general contractors proposals for P.V.C. and
V.C.M. plants, and preparing technical comments,
- Attend the negotiations, discussions and comment/approve the
technical proposals with the general contractors and licensors.
From 1974 to 1984: (Alexandria, Egypt)
COMPANY : Dyestuffs and Chemicals Company (ISMADYE)
POSITION : Graduated in the following Positions
Mechanical Maintenance and Planning section head; from 1979 till 1984
Duties & Responsibilities:
- Prepare preventive maintenance programs.
- Prepare schedules for major repairs and annual maintenance shutdown.
- Follow up and update master plan.
- Establish spare parts requests required for both normal and major
repairs.
- Prepare engineering specifications for the ordered equipment and
share in the technical evaluation of the offers.
Mechanical Maintenance Engineer; from 1977 till 1978
- Ensure safe and efficient operation of rotating equipment.
- Follow up maintenance of centrifugal pumps, plunger pumps,
centrifugal compressors, reciprocating compressors, agitators,
kettles, spray dryers, centrifuges... etc.
Workshop Mechanical Engineer; from 1974 till 1977
- Responsible for supervision of execution of piping work.
- Supervise machining workshop.
- Prepare requisitions for tools and materials.