CURRICULUM VITAE
[pic]
ROLANDO A. ALCALDE
Nationality : Filipino
Blk. 432 Clementi Ave.3 # 11 - 280
Singapore 120432
CP# +65-86550994 in Singapore
CP # +63-916******* in the Philippines
*******************@*****.***
Permanent Resident in
Singapore UIN # S2748328C
Position Applied : FSO OPERATION SUPERVISOR &
Senior Lead Mech'l Commissioning Engineer.
QUALIFICATION
. Bachelor of Science Honors Degree in Mechanical Engineering
. University of The East, Manila Philippines
. Chartered Engineer ( 1979 )
. Member, Institution of Marine Engineering,
. Science & Technology ( 1979 )
. Associated Marine Officer Union of the Philippines
PROFESSIONAL PROFILE
OIL AND GAS INDUSTRY, FSO, Jackup, FPSO & DRILLING RIG -
. More than 32 years field of Oil and Gas, Petro chemical and power
plant industry in on land and offshore. Helihoist, Conventional
rigs, Jackup,TLP, Semi Submersible. FPSO / Platform Mobilized
rigs, rig crews, and rig support equipment into very remote areas
and ensured the continuance of logistical and maintenance programs
to conduct an efficient works operation in those areas.
. My experience covers specialization in technical and hook-up and
commissioning & Start-up.Involved also in engineering design RIG,
FPSO ( HVAC ) Air conditioning, procurement, fabrication, QA/QC &
construction assembly of turbine rolls royce, crane & boiler.
. Involved in Oil & Gas, Marine / Drilling System & Offshore
Commissioning, Construction / Engineering Supervision & Inspection,
conversant with Mechanical Completion Database systems ( MIPS .
Project Track, CMS, PIMS & Win PCS),FSO, Jack-up and Semi-
submersibles Drilling Rig, Floating Production Storage and
Offloading FPSO, Production Platforms with extensive and hands-on
experience with Diesel Engines ( GM EMD, WARTSILA, CATERPILLAR &
DETROIT ) and Utility & Auxiliary Systems Equipments, Conversion
and upgrading ( Complete Re-tubing ) of HP Boiler to Dual Fired (
IHI, Kawasaki ).
. Have been in various countries job assignment that include in the
Middle East, Saudi Arabia, Dubai, Adu-dhabi, Kuwait, Libya, Guam
USA, Thailand, China, Singapore, Malaysia, Indonesia & Brazil, for
oil and gas industries in onshore & offshore. Attended also various
training and seminars, computer literate and can well operate
current computer softwares to accomplish a given task.Experience
includes international and domestic locations with onshore offshore
supervision.
. Conversant with standard engineering practices and international
codes and standards (ANSI, ASME, BS, etc). Well verse with EXXON,
SHELL DEP'S / MESC codes, Petronas Technical Specs. (PTS).
. Preparation of workpack for offshore project implementation on
various Sarawak Shell Bhd. (SSB). topside major maintenance and
modification projects.
. I am working in FRIGSTAD SCARABEO9 OSLO RIG.SEMI SUBMERSIBLE in
Singapore as a Senior Lead Mechanical/Piping Commissioning
Engineer.
CAREER EXPERIENCE
Seniour OPERATION SUPERVISOR Date -June
2011 to May 2013
( Owner ) SHELL Company.
Project:
SHELL FSO Gumusut-Kakap Deepwater Oil and Gas Project - Offshore
Technology.Offshore East Malaysia, Sabah, Blocks J & K.
. I am three(3) years a Marine Operations Supervisor onboard FSO Gumusut
Kakap .
. The FSO (Floating, Storage and Offloading) is moored with eight anchor
chains on a swivel turret in the water depths of approximately 4,000
feet (1,250 meters).
. The scope of supply for phase one of the project includes 15 subsea
trees, five manifolds, subsea drilling systems, control systems,
flowline connections and related subsea equipment and life-of-field
support.
. Kakap is a purpose-built storage tanker delivered in August 2006. It
receives the condensate produced from the PUQC (Process, Utilities,
Quarters and Compression) in offshore East Malaysia, Sabah, Blocks J &
K, in water depths
. Field through subsea flow line, flexible riser and fluid swivel.
. I am the overall in-charge of Marine Operations and the safety of all
personnel onboard in close liaison with the Facility Manager.
. The offshore oil production is a round-the-clock operation analogous
to any petroleum terminal.
. The stored condensate is exported according to the instructions of our
client,Shell(Shell Oil Company).
. I must ensure that offtake operations are well organized, from
preparations, tanker approach to moor in tandem with the FSO and safe
transfer of the cargo along with the necessary documentations.
. The FSO is manned by expatriate senior officers and Filipino crew.
. Shore logistics of Shell Malaysia Operations is based in offshore East
Malaysia, Sabah, Blocks J & K, in water depths.
FSO Puteri Dulang May 2010 to May 2011
FSO OPERATION SUPERVISOR
I am Lead Operation Supervisor
on board FSO Puteri Dulang,
Petronas Carigali Sdn. Bhd.
. Petronas Contracted to Petronas Carigali Sdn. Bhd. On handling of
cargo (crude oil), shuttle tankers,
Terminal and Port Operation.
. Liaise and communicate with tanker calling for terminal together with
Petronas Carigali Sdn Bhd
. Primary duty includes cargo work e.g. discharge/offloading plan,
schedule and operations, mooring of tankers, tanks management and
ballast operation.
. Tanks management includes tank heating requirement, cargo tanks inert
gas pressure, advising PCSB on tank top situation, tank de-bottoming
of water traces, ullaging and sounding.
. Maintain FSO stresses and stability by monitoring load calculations.
. Liaise with tanker ship, cargo and buyer surveyor representatives
onboard during discharge of cargo.
. Crude testing in laboratory (BS&W, density, ppm and etc.) together
with independent, buyer and PCSB surveyors to witness.
. Since there is no cargo supervisor, I assume the duties of cargo
supervisor and assist FSO Master on days to days work.
. Work on board FSO on 14 days on/off basis. Shift 12 hours on-off day
and night.
. Appointed as Safety Officer during tank entry and major maintenance
work carried out.
. Supervising on PERMIT TO WORK (PTW) and assist Master in carry out
Site Safety Procedure (SSP).
. Identify and rectification of HSE hazard reported day to day.
Health, Safety and Environment (HSE) Committee 2010.
Superintendent Consultant:
Date April 2009 to April 2010
Senior Mech'l / Piping Commissioning
( Owner Side ) JVPC Project -
Rang Dong FSO The Japan Vietnam
Petroleum Co Ltd (JVPC)
is currently operating in the
Rang Dong Oil Field, Block 15-2,
approximately 140km offshore of Vung Tau,
Southern Vietnam, known locally as Rang Dong.
. Initially employed as a Project superintendent on the JVPC Rang Dong
Offshore Project in Vietnam,
. Creating commissioning procedures and review, engine room and top side
. Ensure that the Contractors execute the activities in accordance with
the commissioning specifications and HSE policy.
. Lead, direct and motivate the commissioning team throughout the
commissioning phases of the Project
. Report to the Commissioning Manager on all matters related to
commissioning, and attendance in daily meetings to discuss work
progress
. P&ID review and as built improvements
. Take part in the review and acceptance of the Commissioning Dossiers
FSO handover and operation training
Senior Mech'l/ Piping Commissioning Lead Eng'r: Date-Aug
2006 to March 2009
( Owner Side ) Frigstad Offshore Private Limited-
Keppel Fels Shipyard Singapore
Kan Tan IV a Semisub type of drilling rig..
Semi-Submersible Operations:
Kan Tan IV (Three Well Exploration Programme)
Project : Kan Tan IV a Semisub type of drilling rig..
. Commissioning of mechanical rotating machinery, gas turbines, turbines
compressor, levelling and carrying out the alignment of generator to
gas turbine gearbox and turbine to compressor, flushing of all lube
oil and hydraulic oil lines, pumps, compressors, diesel generator sets
etc.
. Performance testing, documenting check sheets, test reports, plant
status reports and generating necessary P.T
. Lead preparation, planning and safe execution of installation and
commissioning of rotating equipment and turbo machinery.
. Developing new procedures for commissioning and start up for all
processing system of platform, inspection test tecord and system
description.
. Prepared and develop document for deliverables of pre commissioning
and HUC commissioning system procedures, work pack, check sheet
overview and system limit.
. Lead the commissioning effort for all activities during static and
dynamic commissioning, FAT and SIT.
. Work closely with Saipem eni. commissioning lead to organize handover
walkdown with participation from the start-up and operation groups
subcontractor and vendor.
. Identifies commissioning issues and work closely with Saipem eni. for
resulation.
. Identified and ensures required commissioning resourse need in place
and functioning at key project phases.
. Lead system handover to Saipem eni
. Ensures appropriate system MC, commissioning and handover
documentation and certification are raised.
Commissioning Engineer & QA/QC Eng'r July 2005 to
July 2006
( Client side ) ADDAX PETROLEUM DEV.
NIGERIA LTD. DUBAI,UAE. KNOCK ADOON PTE LTD.
Project Assigned: APD(N)L ANTAN FPSO SYS. OML
123,TB513
. Responsible for the definition of mechanical rotating and static
packaged equipment utilised within oil and gas production facilities
for new plant and Brownfield modifications and associated pipeline
transportation systems.
. Ensuring that all modifications in relation to piping and process
systems, and related facilities were correctly designed to the
applicable codes and standards. The provision of technical support to
the maintenance department with the resolution of anomalies found in
the field.
. Preparation of installation and commissioning deliverables and the
provision of assistance in construction and commissioning activities.
. Assisting the pipeline department with the design of Slug catchers,
separators, condensate stabilizer filters and metering equipment.
. I check the revision and issue of the ADDAX company Piping
Specification to cover all aspects of piping fabrication, selection,
installation and modification work within the Tsiengui and Obangue
fields.
. Reporting to Commissioning Manager & Chief Comm.Engineer in the
implementation and execution of Commissioning & Pre-Commissioning
/Start Up within assigned Sector ( Marine & Drilling sys. Secondary
Process Units, Scarabeo9 Utilities & SAR Expansion Project ) in
complete compliance to Project Safety Policies & Procedure, Quality
requirements, Schedule & Budget
Senior Mech'l/ Piping Commissioning Date- July
2004 to June 2005
Lead Eng'r:
( Owner Side ) Frigstad Offshore Private Limited
FRIGSTAD SCARABEO 9 RIG
Yantai CIMC Raffles Shipyard in Yantai,
Shandong.CHINA Operated by
CIMC Raffles Offshore Ltd.
Project: SCARABEO 9 RIG
COMMISSIONING SYSTEM HANDLED;
DRILLING SYSTEMS in Scarabeo 9
BULK MUD AND CEMENT SYSTEM = Using Bulk air max of 6 bar can transfer
barite from P tank to Surge tank to mud pit. Bulk Cement to cementing unit.
BULK AIR SYSTEMS = Use in operation transferring of barite P tank to P
tank, P tank to surge tank, P tank to mud pit and to loading station
manifold.
LP MUD SYSTEMS = Compose of Mud Mixing pump, Mud Charging pump, Brine pump,
Agitators in each mud pits and Pill pits. Charging pump feed Mud Pump.
AGITATORS = Commissioning of Agitators need Voltmeter, Megger tester,
Tachometer, Ammeter, Temperature gun, Run Agitator with clean mud pits and
water.
MUD RETURN SYSTEMS = Trip Tank fill by mud mixing pump. Run trip pump led
to Mud gas separator, Sand trap and Diverter mud return to trip tank.
HP MUD SYSTEM = Using charging pump to Mud pump produces 7 thousand psi
controlled by choke and kill manifold. Pressure must not exceed relief
valve setting.
MUD PUMP = Assist vendor in commissioning Mud Pump such as running the
charging pump. And providing modified blind flange with nozzle to meet
desire pressure.
BRINE SYSTEMS = To provide brine for mixing with mud in mud pits. Running
brine pump must see to it that it will go to right mud pit and double check
the valves.
TOP DRIVE = Usually NOV and Akers supply Top Drives assist them lifting and
installation, supply of hydraulic oil for HPU and running it, oil and
grease and load test.
DRAW WORKS = Help install drill line with roof access crew. From drill line
drum, dead line anchor, crown block, running block 6 wraps and draw works
(Wirth).
TUBULAR FEEDING MACHINE = Run HPU unit and provide assorted sizes of drill
pipes to vendors for function test. And steel weights for load testing.
CAT HEAD = Assist vendors power up HPU unit function test, provide load
cell for load test. All drill floor equipments tests and commissioning done
in drillers chair.
ROTARY TABLE = Assist vendors running HPU unit. Operate air winch in
lifting power slips and drill pipes for vendors function testing.
AIR AND HYDRAULIC WINCHES = Run Utility air and HPU for air and hydraulic
winches. Operate for lifting to assist vendors. Load testing be done before
using.
HPU UNIT = Pressure line, Drain line and Return line of HPU unit must be
chemical flush and hydro tested. Hydraulic oil must be flush to NAS 3 or 4
before using.
CHERRY PICKERS = Run HPU to power up cherry picker. Provide steel weights
for load test for official commissioning before using overhead jobs.
All other equipments in rig floor such as Mouse Holes, Tubular Chute,
Tubular Feeding Machine, Riser Chute, Pipe Deck Pipe Handler Crane, Bridge
Crane, Tongs,
Hydraulic Iron Rough Neck, Eagle light, Lower Guiding Arm, Belly Board
Monkey Board, Casing Board and others. Assist coordinate vendors during Pre
start up,
function tests, until official Commissioning. Close Test Memos sign by
Surveyor, Owner and Commissioning and hand over to owner.
Senior Mech'l/ Piping Commissioning Eng'r Date -July 2003
to June. 2004
( Client Side )
OCS-Offshore Commissioning Solutions.:
Noble Dave Beards.
SEMI SUBMERSIBLE RIG
Rodovia Rio Santos, KM 81 S/N
Fredio Frescao, 3 Andar, Jacuencanga
Angra Dos Reis R.J Brazil.
COMMISSIONING SYSTEM HANDLED;
MARINE SYSTEMS
PROJECT: Noble Dave Beard Rig.
. MAIN ENGINE SEA WATER COOLING SYSTEM = Cool Main Engine, Air
Compressors, AHU Units and VFD.
. BALLAST SYSTEMS = Use in trimming the rig. By transferring water
ballast to ballast tank and port to starboard in semi sub. Can do in
control Room by VMS.
. REMOTE CONTROL VALVES = Can work in control room by VMS. Transferring
of barite, fuel, ballasting, potable water, fire pump, changeover of
pumps, bilge etc.
. BILGE SYSTEMS = Removing of water from pump room, thruster room, bilge
well in columns, main deck and pump out to overboard or bilge holding
tank.
. POTABLE WATER SYSTEMS = Some rig this can be operate in control room
by VMS. For use in LQ. Cooling for main engine (expansion tank),
cooking and cleaning.
. FUEL OIL SYSTEMS = Piping must be chemical flush; hydro test, filter
install before the main engine and fuel oil purifier. Settling and
Service tank clean before filling.
. FIRE MAIN SYSTEM = Emergency Fire pump, FIFI pump, Deluge, Foam at
Heli deck, fixation system and water mist. Pre start in LQ need
manpower to avoid flooding.
. COMPRESSED AIR SYSTEM = For instrumentation, starting main engine,
pneumatic valves, air winches and utility outlets. And drier must work
properly.
. PNEUMATIC FIRE DAMPERS = This dampers must be close 15 seconds during
fire when supply of air cut off and can be done in control room or
manually.
. MAIN ENGINE = Assist vendor in Pre start up. It's auxiliary properly
working (Starting air, Sea water cooling, Fresh water cooling and
Purifier). Maintain after comm..
Commissioning Engineer Date- May. 2000 to June 2002
PPL Shipyard Pte Ltd, Singapore:
Jack-Up Drilling Rig
Project : (P2028 - Setty, Egyptian Drilling
. Supervise preparation and execution of the pre-commissioning,
commissioning and startup activity also Factory Acceptance
. Test's in accordance with contractual requirements and project
objectives in terms of safety, quality and schedule.
. Interface with engineering disciplines, construction personnel and
coordinates activities of vendor rep. and subcontractors for new
building of Pacific Class 375
Senior Mech'l/ Piping Date:April 1999 to
April 2000
Commissioning Eng'r
( Client Side ): OCS-Offshore
Commissioning Solutions.
SEMI SUBMERSIBLE RIG
Address: Research Institute,
Dalian Shipbuilding Industry Co. LTD.
1 Haifang St. Dalian China
Project: Noble Dave Beards.
. I am an all round Engineer, Marine trained, with a total of 20 years
experience.
. I worked mainly in Merchant Marine, Dredging and Offshore drilling.
. The last 2 years I am involved in new building projects of
SemiSubmersible,drilling rigs in Raffles Yantai. China(Scarabeo9 )
. Handled Chilled Media System involving static equipment s(pressure
vessels,storage tanks, special equipment, etc.) as well as rotating
machinery (pump,centrifuges, compressors etc.) in accordance with the
project specifications,company quality standards, safety issues,
applicable specifications, codes, norms and standards
. Carrying out the detail engineering(System review and check)
. Co-ordinate with other key personnel in other disciplines
. Conducted technical discussions with clients, vendors and
subcontractors.
. Set up scope descriptions and technical specifications and writes the
associated minutes of meeting
. Provide technical assistance at Construction Site
Senior Mech'l / Piping Comm.
Date- April 1998 to March 1999
(onshore / offshore)
Client Side
Prosafe Prod. PTE Singapore /
Proj. involved in FPSO TUI 300 ( UMUROA ) -
Client ( AWE ) Australian Worldwide
Keppels,Singapore. Gul Road Singapore
Project Assigned : FPSO TUI 300 UMUROA
Commissioning Handled Packages:
. Emergency Generator,
. Fresh water production unit,
. Nitrogen generator,
. Air/Nitrogen Receivers,
. Helicopter Refueling System,
. Lube oil/Diesel oil/
. seawater transfer pump,
. Offshore Pedestal Crane,
. Sterilizer/Hot water calorifier,
. Lifeboats,
. Life rafts,
. Sewage Treatment plant,
. Fuel oil booster pumps package,
. Pilot Transfer Arrangement,
. Laboratory Container,
. Fast Rescue boat,
. Submersible Cargo pump,
. Offloading Hose,
. Marine Compactor
. Writing off technical specs for above packages and evaluation
and selection of vendor proposals as per project technical,
commercial and rules requirement.
. Conduct meeting with various other disciplines and project and
operation staff for feasibility of design and layouts.
. Checking all detail engineering interface with client, vendor,
attending FAT class and other disciplines
. Involved in system design and layout of above packages and
site coordination for technical troubleshooting during
installation/commissioning. Involved in system design as per
rule requirements
Senior Comm. Engineer Mech'l / Piping Date-
Feb.1997 to March 1998
Client Side: TRANSOCEAN DEEPWATER DRILLING
Sembawang Shipyard Singapore
Project Assigned: RIG SEMI-SUBMERSIBLE
DISCOVERER 534
. Verification of feed design and input to detail engineering and design
review
. Responsible for handling all static and rotating equipments in Dry
Bulk Storage System, Cementing System, Mud Mixing and storage system,
High pressure mud system, Mud treatment system, Drill water, Bunker
Loading stations, Burner Boom, Base oil, Brine system,,Bilge
Separator, Incinerator
. Commissioning involved in all other equipments on Drill Floor
. Making Purchase Specifications, Technical bid evaluation, Vendor
selection, Vendor Data Review along with its calculations, Equipment
List
. Carrying out the detail engineering of the drilling system as per
operatibility, constructability and other design parameters
. Checking the design as per the relevant rules and regulations
applicable to the project and implementing the same in improving the
system design
. Conduct technical discussions with clients, vendors and subcontractors
for various BFE and OFE equipments and issuing Additional Cost
estimates and various design and site deliverables
. Involved in Freezing detail engineering, and conducting design reviews
using PDMS
. Machinery Arrangement and Equipment Layout considering key aspects of-
a. Maintenance and Material Handling
considerations
b.Accessibility
c. Constructability
d Operatibility
e General Arrangement
. Involved in Equipment installation and mechanical completion with
technical support to yard and site troubleshooting
Commissioning Engineer Client Side: SAIPEM Date- Dec. 1996
to Jan. 1997
s.a. ENi Sembawang Singapore
Project Assigned: ERHA NIGERIA DEEPWATER
( FPSO ) ESSO, Nigeria Limited
. Manage the team of commissioning professionals and technicians.to FPSO
Erha Nigeria Deepwater Project..
. As a focal point Coordinate with class survey, engineering, oil major,
construction team and vendors
. Witness and oversee installation & mechanical completion.
. Report & Comment on systems commissioning in due time.
. Manage Procurement and preservation, vendors for systems
commissioning.
. Review commissioning master schedule.
. Conduct project progress meetings and set sequence of systems
commissioning.
. Review and analyse planning updates.
. Review and approve pre-commissioning directives and commissioning Test
acceptance procedure.
. Lead the team for effective & quality workforce, with good HSE
standards.
. To ensure the systems compliance with testing standards & regulations
of classification societies and for warranties.
. Concise technical reports on mechanical completion, testing &
commissioning of systems for hand over management.
Mech'l /PipingCommissioning Engineer: Date - Oct 1995 to Nov. 1996
KEPPEL Far East Levingston Shipbuilding
Ltd.31 Shipyard Road, Singapore 628130
Project : Sta. Fe III Jackup Drilling Rig
. Liaise with Discipline Commissioning Engineers for all Mechanical
Systems and Interfaces reference to Secondary Process Units, Utilities
& SAR Expansion Sector, Provide expertise in preparation, construction
mechanical completions, commissioning and start-up of Sta Fe III Jack-
up Project.
. To develop the mark-up of System & sub-system boundary limits of
project drawings for all systems at P&ID level for Utility & Process
Systems.
. Populate MIPS Database for Mechanical Discipline ( MC & PC ITR's )
. To compile and develop detailed Commissioning and Function Test
Procedure CFTP's ensuring all design parameters and function logic
control are identified.
. Identify all temporary systems/tools/consumables required for all
phases of the project.
. Identify all first Fill lubrication / chemical requirements.
. Provide expertise in commissioning preparation, commissioning
execution & start-up and supervision of FSR and local Technicians
during Commissioning Activities.
. Lead a Team of Mechanical Technician in the execution of CFTP's on
Rotating Equipment (Coupling Alignment using laser and dial indicator
method, checking softfoots on rotating machineries and coordinate with
electrical dept for rotation check and no load/ load run of rotating
machineries/motors verifying temperatures and vibration)
QA/QC Engineer
Date- Oct 1994 to Sept.1995
Keffel Fels Shipyard Pte Ltd, Singapore:
Jack-Up Drilling Rig
Project - (P2020 - Aquamarine Driller, Vantage Drilling).
. Coordinate and inspect of all mechanical/marine and drilling packages
arrival, Factory Acceptance Test's,
. Installation and Mechanical Completion, liaise with owner
rep./classification surveyor also generating of punch list and Non
Conformance report during inspection including prepared final
documentation for new building
of Jack-Up Drilling Rig (P2020 - Aquamarine.
. Lead a Team of Mechanical Technician in the execution of CFTP's on
Process Systems
. Line check of lines and markup as per P& ID, flushing of lines prior
to putting in service and make logs of valve isolation,
. Simulate levels and pressure on static equipment and coordinate with
E&I for instruments testing and functions ).
. Endorse discipline specific formal Handover documents / Machinery Work
Pack from Contractors/Vendor at MC & pre-commissioning completion
stage confirming their acceptability.
Commissioning Engineer:
Aug.-1993 to Sept.1994
H.L. Engineering Sdn. Bhd.
Kuala Lumpur Malaysia.
Project Assigned: WEST PATRICIA TOPSIDE
Murphy Sarawak Oil Co. LTD
. Liaise within the Integrated Commissioning Team & Operations group to
ensure all Process / Commissioning / Operations Interfaces of
Mechanical Systems are as per Commissioning Execution Plan.for Marine
& Drilling System
. Ensure all Mechanical systems Commissioning scope is clear and have a
good understanding of job roles and responsibilities Supervise
Mechanical Start-Up Technicians and coordinate work front coverage
within the SAR Expansion & Utilities Expansion Sector.
. Supervise and Coordinate with Mechanical Start Up Technicians in
Witnessing Tri-Party Walk Down, Rotating Equipment Alignment, Motor
Solo Run & Machineries Lube Oil Flushing )
. Coordinate Mechanical input punch list during walk down of sub-system
/System hand over.
Commissioning Eng'r: PSC- Date -July 1992 to July 1993
Penang Shipyard Corporation SDN.BHD
Kuala Lumpur Malaysia
Benchamas BPP Expansion Proj. THAILAND
. Liaise within the Integrated Commissioning Team & Operations group to
ensure all Process / Commissioning / Operations Interfaces of
Mechanical Systems are as per Commissioning Execution Plan.for Marine
& Drilling System
. Ensure all Mechanical systems Commissioning scope is clear and have a
good understanding of job roles and responsibilities Supervise
Mechanical Start-Up Technicians and coordinate work front coverage
within the SAR Expansion & Utilities Expansion Sector.
. Supervise and Coordinate with Mechanical Start Up Technicians in
Witnessing Tri-Party Walk Down, Rotating Equipment Alignment, Motor
Solo Run & Machineries Lube Oil Flushing )
. Coordinate Mechanical input punch list during walk down of sub-system
/System
Commissioning Engineer: Date June
1991 to June 1992
Gulf Petromina Kakap, Indonesia
Project Assigned: Offshore Hook - Up Comm. KG.
Platform Natuna Gulf
Petromina Indonesia
. Assigned the tasks of ensuring that the requirements of the project
are met by consulting with the subject matter expert
. Responsible for assisting in design and equipment selection based on
availability and cost effectiveness
Play active role in project reviews, project meetings, hazard
identification, maintainability, hazard analysis, operability,
model reviews, and commissioning
Commissioning / Const.Eng'r Date - May 1990 to May 1991
Client Side:
Samsung Heavy Industries.
Carekawala Gas Field Dev.
Carigali-Triton Operating Sdn.
Thai, Nippon Steel Co.
CTOC Project Com..Samutprakan,Thailand
. Attend Field Acceptance Test FAT's at Vendors Manufacturing Facility
. Lead a Team of Mechanical Technician in the execution of CFTP's on
Rotating Equipment (Coupling Alignment using laser and dial indicator
method, checking softfoots on rotating machineries and coordinate with
electrical dept for rotation check and no load / load run of rotating
machineries/motors verifying temperatures and vibration)
. Lead a Team of Mechanical Technician in the execution of CFTP's on
Process Systems ( Linecheck of lines and markup as per P& ID, flushing
of lines prior to putting in service and make logs of valve isolation, simulate levels and pressure on static equipment and coordinate with
E&I for instruments testing and functions ).
. Lead the Mechanical Commissioning Team ( e.g. Technicians, Fitters
and Welders ) in the clearing of Punchlist, mechanical completion and
execution of ITR B Pre-Commissioning Scope On shore phase and
continuation of Commissioning and Start up scope until first Oil of
various systems handled in particular in location Offshore.
Hook-up & Commissioning Date - March 1989 to April 1990
Engineer :
Malaysia Shipyard Engineering
S/B Johor, MalaysiaProject
Done Accomplish as follow..
. LARUT-A CPP Topsides Esso Production Malaysia, Inc. (EPMI)
. ANDR-A Topsides (WH &Riser Platforms + Bridge & Vent Boom Petronas
Carigali Sdn. Bhd. (PCSB)
. -F23K-A Compression Topside Sarawak Shell Berhad (SSB)
. HITRA FPSO Modification Trenergy (M)
. Seligi-F and Raya-A Topsides Production Platforms Esso Production
Malaysia, Inc. (EPMI)
Mechanical/Piping Engineer: Date Jan.1988 to
Feb.1989
Sime Sembawang Engineering S / B
Pasir Gudang, Johor, Malaysia.
Project Done Accomplish as follow..
. M1PQ-A/M3PQ-A 70-MEN Living Quarters and M3PQ-A Integrated
platform.Sarawak Shell Berhad (SSB) Jerneh-A Production Platform. Esso
Production
Malaysia Inc. (EPMI)
. Guntong-D Production & Compression.Esso Production Malaysia, Inc.
(EPMI)
. Seligi-C & Seligi-E Production Platform Production Malaysia, Inc.
(EPMI)
Mechanical/Piping Engineer: Date-.Dec.1986 to
Dec.1987
Hitachi Sozen Ltd.
Ruwais Abu Dhabi
Abu Dhabi National Oil Co.
Refinery.&
Power Plant ADNOC UAE
. Responsible for ensuring that the Construction and Installation of
Static and Rotating Equipment including two Units of Reciprocating Gas
Compressor ( 4HE & 2HD NUOVO PIGNONE ) as part of the Plant Expansion
are executed in accordance to Project Specification, Standards and
Project Studies ((MTO, Engineering and construction detail drawing,
Installation and lifting procedure, site survey structural and
machinery dimensional layout, Quality Plan ) and Project Safety
. Coordinate Vendor