CURRICULUM VITAE

[pic]

ROLANDO A. ALCALDE

Nationality : Filipino

Blk. 432 Clementi Ave.3 # 11 - 280

Singapore 120432

CP# +65-86550994 in Singapore

CP # +63-916******* in the Philippines

*******************@*****.***

Permanent Resident in

Singapore UIN # S2748328C

Position Applied : FSO OPERATION SUPERVISOR &

Senior Lead Mech'l Commissioning Engineer.

QUALIFICATION

. Bachelor of Science Honors Degree in Mechanical Engineering

. University of The East, Manila Philippines

. Chartered Engineer ( 1979 )

. Member, Institution of Marine Engineering,

. Science & Technology ( 1979 )

. Associated Marine Officer Union of the Philippines

PROFESSIONAL PROFILE

OIL AND GAS INDUSTRY, FSO, Jackup, FPSO & DRILLING RIG -

. More than 32 years field of Oil and Gas, Petro chemical and power

plant industry in on land and offshore. Helihoist, Conventional

rigs, Jackup,TLP, Semi Submersible. FPSO / Platform Mobilized

rigs, rig crews, and rig support equipment into very remote areas

and ensured the continuance of logistical and maintenance programs

to conduct an efficient works operation in those areas.

. My experience covers specialization in technical and hook-up and

commissioning & Start-up.Involved also in engineering design RIG,

FPSO ( HVAC ) Air conditioning, procurement, fabrication, QA/QC &

construction assembly of turbine rolls royce, crane & boiler.

. Involved in Oil & Gas, Marine / Drilling System & Offshore

Commissioning, Construction / Engineering Supervision & Inspection,

conversant with Mechanical Completion Database systems ( MIPS .

Project Track, CMS, PIMS & Win PCS),FSO, Jack-up and Semi-

submersibles Drilling Rig, Floating Production Storage and

Offloading FPSO, Production Platforms with extensive and hands-on

experience with Diesel Engines ( GM EMD, WARTSILA, CATERPILLAR &

DETROIT ) and Utility & Auxiliary Systems Equipments, Conversion

and upgrading ( Complete Re-tubing ) of HP Boiler to Dual Fired (

IHI, Kawasaki ).

. Have been in various countries job assignment that include in the

Middle East, Saudi Arabia, Dubai, Adu-dhabi, Kuwait, Libya, Guam

USA, Thailand, China, Singapore, Malaysia, Indonesia & Brazil, for

oil and gas industries in onshore & offshore. Attended also various

training and seminars, computer literate and can well operate

current computer softwares to accomplish a given task.Experience

includes international and domestic locations with onshore offshore

supervision.

. Conversant with standard engineering practices and international

codes and standards (ANSI, ASME, BS, etc). Well verse with EXXON,

SHELL DEP'S / MESC codes, Petronas Technical Specs. (PTS).

. Preparation of workpack for offshore project implementation on

various Sarawak Shell Bhd. (SSB). topside major maintenance and

modification projects.

. I am working in FRIGSTAD SCARABEO9 OSLO RIG.SEMI SUBMERSIBLE in

Singapore as a Senior Lead Mechanical/Piping Commissioning

Engineer.

CAREER EXPERIENCE

Seniour OPERATION SUPERVISOR Date -June

2011 to May 2013

( Owner ) SHELL Company.

Project:

SHELL FSO Gumusut-Kakap Deepwater Oil and Gas Project - Offshore

Technology.Offshore East Malaysia, Sabah, Blocks J & K.

. I am three(3) years a Marine Operations Supervisor onboard FSO Gumusut

Kakap .

. The FSO (Floating, Storage and Offloading) is moored with eight anchor

chains on a swivel turret in the water depths of approximately 4,000

feet (1,250 meters).

. The scope of supply for phase one of the project includes 15 subsea

trees, five manifolds, subsea drilling systems, control systems,

flowline connections and related subsea equipment and life-of-field

support.

. Kakap is a purpose-built storage tanker delivered in August 2006. It

receives the condensate produced from the PUQC (Process, Utilities,

Quarters and Compression) in offshore East Malaysia, Sabah, Blocks J &

K, in water depths

. Field through subsea flow line, flexible riser and fluid swivel.

. I am the overall in-charge of Marine Operations and the safety of all

personnel onboard in close liaison with the Facility Manager.

. The offshore oil production is a round-the-clock operation analogous

to any petroleum terminal.

. The stored condensate is exported according to the instructions of our

client,Shell(Shell Oil Company).

. I must ensure that offtake operations are well organized, from

preparations, tanker approach to moor in tandem with the FSO and safe

transfer of the cargo along with the necessary documentations.

. The FSO is manned by expatriate senior officers and Filipino crew.

. Shore logistics of Shell Malaysia Operations is based in offshore East

Malaysia, Sabah, Blocks J & K, in water depths.

FSO Puteri Dulang May 2010 to May 2011

FSO OPERATION SUPERVISOR

I am Lead Operation Supervisor

on board FSO Puteri Dulang,

Petronas Carigali Sdn. Bhd.

. Petronas Contracted to Petronas Carigali Sdn. Bhd. On handling of

cargo (crude oil), shuttle tankers,

Terminal and Port Operation.

. Liaise and communicate with tanker calling for terminal together with

Petronas Carigali Sdn Bhd

. Primary duty includes cargo work e.g. discharge/offloading plan,

schedule and operations, mooring of tankers, tanks management and

ballast operation.

. Tanks management includes tank heating requirement, cargo tanks inert

gas pressure, advising PCSB on tank top situation, tank de-bottoming

of water traces, ullaging and sounding.

. Maintain FSO stresses and stability by monitoring load calculations.

. Liaise with tanker ship, cargo and buyer surveyor representatives

onboard during discharge of cargo.

. Crude testing in laboratory (BS&W, density, ppm and etc.) together

with independent, buyer and PCSB surveyors to witness.

. Since there is no cargo supervisor, I assume the duties of cargo

supervisor and assist FSO Master on days to days work.

. Work on board FSO on 14 days on/off basis. Shift 12 hours on-off day

and night.

. Appointed as Safety Officer during tank entry and major maintenance

work carried out.

. Supervising on PERMIT TO WORK (PTW) and assist Master in carry out

Site Safety Procedure (SSP).

. Identify and rectification of HSE hazard reported day to day.

Health, Safety and Environment (HSE) Committee 2010.

Superintendent Consultant:

Date April 2009 to April 2010

Senior Mech'l / Piping Commissioning

( Owner Side ) JVPC Project -

Rang Dong FSO The Japan Vietnam

Petroleum Co Ltd (JVPC)

is currently operating in the

Rang Dong Oil Field, Block 15-2,

approximately 140km offshore of Vung Tau,

Southern Vietnam, known locally as Rang Dong.

. Initially employed as a Project superintendent on the JVPC Rang Dong

Offshore Project in Vietnam,

. Creating commissioning procedures and review, engine room and top side

. Ensure that the Contractors execute the activities in accordance with

the commissioning specifications and HSE policy.

. Lead, direct and motivate the commissioning team throughout the

commissioning phases of the Project

. Report to the Commissioning Manager on all matters related to

commissioning, and attendance in daily meetings to discuss work

progress

. P&ID review and as built improvements

. Take part in the review and acceptance of the Commissioning Dossiers

FSO handover and operation training

Senior Mech'l/ Piping Commissioning Lead Eng'r: Date-Aug

2006 to March 2009

( Owner Side ) Frigstad Offshore Private Limited-

Keppel Fels Shipyard Singapore

Kan Tan IV a Semisub type of drilling rig..

Semi-Submersible Operations:

Kan Tan IV (Three Well Exploration Programme)

Project : Kan Tan IV a Semisub type of drilling rig..

. Commissioning of mechanical rotating machinery, gas turbines, turbines

compressor, levelling and carrying out the alignment of generator to

gas turbine gearbox and turbine to compressor, flushing of all lube

oil and hydraulic oil lines, pumps, compressors, diesel generator sets

etc.

. Performance testing, documenting check sheets, test reports, plant

status reports and generating necessary P.T

. Lead preparation, planning and safe execution of installation and

commissioning of rotating equipment and turbo machinery.

. Developing new procedures for commissioning and start up for all

processing system of platform, inspection test tecord and system

description.

. Prepared and develop document for deliverables of pre commissioning

and HUC commissioning system procedures, work pack, check sheet

overview and system limit.

. Lead the commissioning effort for all activities during static and

dynamic commissioning, FAT and SIT.

. Work closely with Saipem eni. commissioning lead to organize handover

walkdown with participation from the start-up and operation groups

subcontractor and vendor.

. Identifies commissioning issues and work closely with Saipem eni. for

resulation.

. Identified and ensures required commissioning resourse need in place

and functioning at key project phases.

. Lead system handover to Saipem eni

. Ensures appropriate system MC, commissioning and handover

documentation and certification are raised.

Commissioning Engineer & QA/QC Eng'r July 2005 to

July 2006

( Client side ) ADDAX PETROLEUM DEV.

NIGERIA LTD. DUBAI,UAE. KNOCK ADOON PTE LTD.

Project Assigned: APD(N)L ANTAN FPSO SYS. OML

123,TB513

. Responsible for the definition of mechanical rotating and static

packaged equipment utilised within oil and gas production facilities

for new plant and Brownfield modifications and associated pipeline

transportation systems.

. Ensuring that all modifications in relation to piping and process

systems, and related facilities were correctly designed to the

applicable codes and standards. The provision of technical support to

the maintenance department with the resolution of anomalies found in

the field.

. Preparation of installation and commissioning deliverables and the

provision of assistance in construction and commissioning activities.

. Assisting the pipeline department with the design of Slug catchers,

separators, condensate stabilizer filters and metering equipment.

. I check the revision and issue of the ADDAX company Piping

Specification to cover all aspects of piping fabrication, selection,

installation and modification work within the Tsiengui and Obangue

fields.

. Reporting to Commissioning Manager & Chief Comm.Engineer in the

implementation and execution of Commissioning & Pre-Commissioning

/Start Up within assigned Sector ( Marine & Drilling sys. Secondary

Process Units, Scarabeo9 Utilities & SAR Expansion Project ) in

complete compliance to Project Safety Policies & Procedure, Quality

requirements, Schedule & Budget

Senior Mech'l/ Piping Commissioning Date- July

2004 to June 2005

Lead Eng'r:

( Owner Side ) Frigstad Offshore Private Limited

FRIGSTAD SCARABEO 9 RIG

Yantai CIMC Raffles Shipyard in Yantai,

Shandong.CHINA Operated by

CIMC Raffles Offshore Ltd.

Project: SCARABEO 9 RIG

COMMISSIONING SYSTEM HANDLED;

DRILLING SYSTEMS in Scarabeo 9

BULK MUD AND CEMENT SYSTEM = Using Bulk air max of 6 bar can transfer

barite from P tank to Surge tank to mud pit. Bulk Cement to cementing unit.

BULK AIR SYSTEMS = Use in operation transferring of barite P tank to P

tank, P tank to surge tank, P tank to mud pit and to loading station

manifold.

LP MUD SYSTEMS = Compose of Mud Mixing pump, Mud Charging pump, Brine pump,

Agitators in each mud pits and Pill pits. Charging pump feed Mud Pump.

AGITATORS = Commissioning of Agitators need Voltmeter, Megger tester,

Tachometer, Ammeter, Temperature gun, Run Agitator with clean mud pits and

water.

MUD RETURN SYSTEMS = Trip Tank fill by mud mixing pump. Run trip pump led

to Mud gas separator, Sand trap and Diverter mud return to trip tank.

HP MUD SYSTEM = Using charging pump to Mud pump produces 7 thousand psi

controlled by choke and kill manifold. Pressure must not exceed relief

valve setting.

MUD PUMP = Assist vendor in commissioning Mud Pump such as running the

charging pump. And providing modified blind flange with nozzle to meet

desire pressure.

BRINE SYSTEMS = To provide brine for mixing with mud in mud pits. Running

brine pump must see to it that it will go to right mud pit and double check

the valves.

TOP DRIVE = Usually NOV and Akers supply Top Drives assist them lifting and

installation, supply of hydraulic oil for HPU and running it, oil and

grease and load test.

DRAW WORKS = Help install drill line with roof access crew. From drill line

drum, dead line anchor, crown block, running block 6 wraps and draw works

(Wirth).

TUBULAR FEEDING MACHINE = Run HPU unit and provide assorted sizes of drill

pipes to vendors for function test. And steel weights for load testing.

CAT HEAD = Assist vendors power up HPU unit function test, provide load

cell for load test. All drill floor equipments tests and commissioning done

in drillers chair.

ROTARY TABLE = Assist vendors running HPU unit. Operate air winch in

lifting power slips and drill pipes for vendors function testing.

AIR AND HYDRAULIC WINCHES = Run Utility air and HPU for air and hydraulic

winches. Operate for lifting to assist vendors. Load testing be done before

using.

HPU UNIT = Pressure line, Drain line and Return line of HPU unit must be

chemical flush and hydro tested. Hydraulic oil must be flush to NAS 3 or 4

before using.

CHERRY PICKERS = Run HPU to power up cherry picker. Provide steel weights

for load test for official commissioning before using overhead jobs.

All other equipments in rig floor such as Mouse Holes, Tubular Chute,

Tubular Feeding Machine, Riser Chute, Pipe Deck Pipe Handler Crane, Bridge

Crane, Tongs,

Hydraulic Iron Rough Neck, Eagle light, Lower Guiding Arm, Belly Board

Monkey Board, Casing Board and others. Assist coordinate vendors during Pre

start up,

function tests, until official Commissioning. Close Test Memos sign by

Surveyor, Owner and Commissioning and hand over to owner.

Senior Mech'l/ Piping Commissioning Eng'r Date -July 2003

to June. 2004

( Client Side )

OCS-Offshore Commissioning Solutions.:

Noble Dave Beards.

SEMI SUBMERSIBLE RIG

Rodovia Rio Santos, KM 81 S/N

Fredio Frescao, 3 Andar, Jacuencanga

Angra Dos Reis R.J Brazil.

COMMISSIONING SYSTEM HANDLED;

MARINE SYSTEMS

PROJECT: Noble Dave Beard Rig.

. MAIN ENGINE SEA WATER COOLING SYSTEM = Cool Main Engine, Air

Compressors, AHU Units and VFD.

. BALLAST SYSTEMS = Use in trimming the rig. By transferring water

ballast to ballast tank and port to starboard in semi sub. Can do in

control Room by VMS.

. REMOTE CONTROL VALVES = Can work in control room by VMS. Transferring

of barite, fuel, ballasting, potable water, fire pump, changeover of

pumps, bilge etc.

. BILGE SYSTEMS = Removing of water from pump room, thruster room, bilge

well in columns, main deck and pump out to overboard or bilge holding

tank.

. POTABLE WATER SYSTEMS = Some rig this can be operate in control room

by VMS. For use in LQ. Cooling for main engine (expansion tank),

cooking and cleaning.

. FUEL OIL SYSTEMS = Piping must be chemical flush; hydro test, filter

install before the main engine and fuel oil purifier. Settling and

Service tank clean before filling.

. FIRE MAIN SYSTEM = Emergency Fire pump, FIFI pump, Deluge, Foam at

Heli deck, fixation system and water mist. Pre start in LQ need

manpower to avoid flooding.

. COMPRESSED AIR SYSTEM = For instrumentation, starting main engine,

pneumatic valves, air winches and utility outlets. And drier must work

properly.

. PNEUMATIC FIRE DAMPERS = This dampers must be close 15 seconds during

fire when supply of air cut off and can be done in control room or

manually.

. MAIN ENGINE = Assist vendor in Pre start up. It's auxiliary properly

working (Starting air, Sea water cooling, Fresh water cooling and

Purifier). Maintain after comm..

Commissioning Engineer Date- May. 2000 to June 2002

PPL Shipyard Pte Ltd, Singapore:

Jack-Up Drilling Rig

Project : (P2028 - Setty, Egyptian Drilling

. Supervise preparation and execution of the pre-commissioning,

commissioning and startup activity also Factory Acceptance

. Test's in accordance with contractual requirements and project

objectives in terms of safety, quality and schedule.

. Interface with engineering disciplines, construction personnel and

coordinates activities of vendor rep. and subcontractors for new

building of Pacific Class 375

Senior Mech'l/ Piping Date:April 1999 to

April 2000

Commissioning Eng'r

( Client Side ): OCS-Offshore

Commissioning Solutions.

SEMI SUBMERSIBLE RIG

Address: Research Institute,

Dalian Shipbuilding Industry Co. LTD.

1 Haifang St. Dalian China

Project: Noble Dave Beards.

. I am an all round Engineer, Marine trained, with a total of 20 years

experience.

. I worked mainly in Merchant Marine, Dredging and Offshore drilling.

. The last 2 years I am involved in new building projects of

SemiSubmersible,drilling rigs in Raffles Yantai. China(Scarabeo9 )

. Handled Chilled Media System involving static equipment s(pressure

vessels,storage tanks, special equipment, etc.) as well as rotating

machinery (pump,centrifuges, compressors etc.) in accordance with the

project specifications,company quality standards, safety issues,

applicable specifications, codes, norms and standards

. Carrying out the detail engineering(System review and check)

. Co-ordinate with other key personnel in other disciplines

. Conducted technical discussions with clients, vendors and

subcontractors.

. Set up scope descriptions and technical specifications and writes the

associated minutes of meeting

. Provide technical assistance at Construction Site

Senior Mech'l / Piping Comm.

Date- April 1998 to March 1999

(onshore / offshore)

Client Side

Prosafe Prod. PTE Singapore /

Proj. involved in FPSO TUI 300 ( UMUROA ) -

Client ( AWE ) Australian Worldwide

Keppels,Singapore. Gul Road Singapore

Project Assigned : FPSO TUI 300 UMUROA

Commissioning Handled Packages:

. Emergency Generator,

. Fresh water production unit,

. Nitrogen generator,

. Air/Nitrogen Receivers,

. Helicopter Refueling System,

. Lube oil/Diesel oil/

. seawater transfer pump,

. Offshore Pedestal Crane,

. Sterilizer/Hot water calorifier,

. Lifeboats,

. Life rafts,

. Sewage Treatment plant,

. Fuel oil booster pumps package,

. Pilot Transfer Arrangement,

. Laboratory Container,

. Fast Rescue boat,

. Submersible Cargo pump,

. Offloading Hose,

. Marine Compactor

. Writing off technical specs for above packages and evaluation

and selection of vendor proposals as per project technical,

commercial and rules requirement.

. Conduct meeting with various other disciplines and project and

operation staff for feasibility of design and layouts.

. Checking all detail engineering interface with client, vendor,

attending FAT class and other disciplines

. Involved in system design and layout of above packages and

site coordination for technical troubleshooting during

installation/commissioning. Involved in system design as per

rule requirements

Senior Comm. Engineer Mech'l / Piping Date-

Feb.1997 to March 1998

Client Side: TRANSOCEAN DEEPWATER DRILLING

Sembawang Shipyard Singapore

Project Assigned: RIG SEMI-SUBMERSIBLE

DISCOVERER 534

. Verification of feed design and input to detail engineering and design

review

. Responsible for handling all static and rotating equipments in Dry

Bulk Storage System, Cementing System, Mud Mixing and storage system,

High pressure mud system, Mud treatment system, Drill water, Bunker

Loading stations, Burner Boom, Base oil, Brine system,,Bilge

Separator, Incinerator

. Commissioning involved in all other equipments on Drill Floor

. Making Purchase Specifications, Technical bid evaluation, Vendor

selection, Vendor Data Review along with its calculations, Equipment

List

. Carrying out the detail engineering of the drilling system as per

operatibility, constructability and other design parameters

. Checking the design as per the relevant rules and regulations

applicable to the project and implementing the same in improving the

system design

. Conduct technical discussions with clients, vendors and subcontractors

for various BFE and OFE equipments and issuing Additional Cost

estimates and various design and site deliverables

. Involved in Freezing detail engineering, and conducting design reviews

using PDMS

. Machinery Arrangement and Equipment Layout considering key aspects of-

a. Maintenance and Material Handling

considerations

b.Accessibility

c. Constructability

d Operatibility

e General Arrangement

. Involved in Equipment installation and mechanical completion with

technical support to yard and site troubleshooting

Commissioning Engineer Client Side: SAIPEM Date- Dec. 1996

to Jan. 1997

s.a. ENi Sembawang Singapore

Project Assigned: ERHA NIGERIA DEEPWATER

( FPSO ) ESSO, Nigeria Limited

. Manage the team of commissioning professionals and technicians.to FPSO

Erha Nigeria Deepwater Project..

. As a focal point Coordinate with class survey, engineering, oil major,

construction team and vendors

. Witness and oversee installation & mechanical completion.

. Report & Comment on systems commissioning in due time.

. Manage Procurement and preservation, vendors for systems

commissioning.

. Review commissioning master schedule.

. Conduct project progress meetings and set sequence of systems

commissioning.

. Review and analyse planning updates.

. Review and approve pre-commissioning directives and commissioning Test

acceptance procedure.

. Lead the team for effective & quality workforce, with good HSE

standards.

. To ensure the systems compliance with testing standards & regulations

of classification societies and for warranties.

. Concise technical reports on mechanical completion, testing &

commissioning of systems for hand over management.

Mech'l /PipingCommissioning Engineer: Date - Oct 1995 to Nov. 1996

KEPPEL Far East Levingston Shipbuilding

Ltd.31 Shipyard Road, Singapore 628130

Project : Sta. Fe III Jackup Drilling Rig

. Liaise with Discipline Commissioning Engineers for all Mechanical

Systems and Interfaces reference to Secondary Process Units, Utilities

& SAR Expansion Sector, Provide expertise in preparation, construction

mechanical completions, commissioning and start-up of Sta Fe III Jack-

up Project.

. To develop the mark-up of System & sub-system boundary limits of

project drawings for all systems at P&ID level for Utility & Process

Systems.

. Populate MIPS Database for Mechanical Discipline ( MC & PC ITR's )

. To compile and develop detailed Commissioning and Function Test

Procedure CFTP's ensuring all design parameters and function logic

control are identified.

. Identify all temporary systems/tools/consumables required for all

phases of the project.

. Identify all first Fill lubrication / chemical requirements.

. Provide expertise in commissioning preparation, commissioning

execution & start-up and supervision of FSR and local Technicians

during Commissioning Activities.

. Lead a Team of Mechanical Technician in the execution of CFTP's on

Rotating Equipment (Coupling Alignment using laser and dial indicator

method, checking softfoots on rotating machineries and coordinate with

electrical dept for rotation check and no load/ load run of rotating

machineries/motors verifying temperatures and vibration)

QA/QC Engineer

Date- Oct 1994 to Sept.1995

Keffel Fels Shipyard Pte Ltd, Singapore:

Jack-Up Drilling Rig

Project - (P2020 - Aquamarine Driller, Vantage Drilling).

. Coordinate and inspect of all mechanical/marine and drilling packages

arrival, Factory Acceptance Test's,

. Installation and Mechanical Completion, liaise with owner

rep./classification surveyor also generating of punch list and Non

Conformance report during inspection including prepared final

documentation for new building

of Jack-Up Drilling Rig (P2020 - Aquamarine.

. Lead a Team of Mechanical Technician in the execution of CFTP's on

Process Systems

. Line check of lines and markup as per P& ID, flushing of lines prior

to putting in service and make logs of valve isolation,

. Simulate levels and pressure on static equipment and coordinate with

E&I for instruments testing and functions ).

. Endorse discipline specific formal Handover documents / Machinery Work

Pack from Contractors/Vendor at MC & pre-commissioning completion

stage confirming their acceptability.

Commissioning Engineer:

Aug.-1993 to Sept.1994

H.L. Engineering Sdn. Bhd.

Kuala Lumpur Malaysia.

Project Assigned: WEST PATRICIA TOPSIDE

Murphy Sarawak Oil Co. LTD

. Liaise within the Integrated Commissioning Team & Operations group to

ensure all Process / Commissioning / Operations Interfaces of

Mechanical Systems are as per Commissioning Execution Plan.for Marine

& Drilling System

. Ensure all Mechanical systems Commissioning scope is clear and have a

good understanding of job roles and responsibilities Supervise

Mechanical Start-Up Technicians and coordinate work front coverage

within the SAR Expansion & Utilities Expansion Sector.

. Supervise and Coordinate with Mechanical Start Up Technicians in

Witnessing Tri-Party Walk Down, Rotating Equipment Alignment, Motor

Solo Run & Machineries Lube Oil Flushing )

. Coordinate Mechanical input punch list during walk down of sub-system

/System hand over.

Commissioning Eng'r: PSC- Date -July 1992 to July 1993

Penang Shipyard Corporation SDN.BHD

Kuala Lumpur Malaysia

Benchamas BPP Expansion Proj. THAILAND

. Liaise within the Integrated Commissioning Team & Operations group to

ensure all Process / Commissioning / Operations Interfaces of

Mechanical Systems are as per Commissioning Execution Plan.for Marine

& Drilling System

. Ensure all Mechanical systems Commissioning scope is clear and have a

good understanding of job roles and responsibilities Supervise

Mechanical Start-Up Technicians and coordinate work front coverage

within the SAR Expansion & Utilities Expansion Sector.

. Supervise and Coordinate with Mechanical Start Up Technicians in

Witnessing Tri-Party Walk Down, Rotating Equipment Alignment, Motor

Solo Run & Machineries Lube Oil Flushing )

. Coordinate Mechanical input punch list during walk down of sub-system

/System

Commissioning Engineer: Date June

1991 to June 1992

Gulf Petromina Kakap, Indonesia

Project Assigned: Offshore Hook - Up Comm. KG.

Platform Natuna Gulf

Petromina Indonesia

. Assigned the tasks of ensuring that the requirements of the project

are met by consulting with the subject matter expert

. Responsible for assisting in design and equipment selection based on

availability and cost effectiveness

Play active role in project reviews, project meetings, hazard

identification, maintainability, hazard analysis, operability,

model reviews, and commissioning

Commissioning / Const.Eng'r Date - May 1990 to May 1991

Client Side:

Samsung Heavy Industries.

Carekawala Gas Field Dev.

Carigali-Triton Operating Sdn.

Thai, Nippon Steel Co.

CTOC Project Com..Samutprakan,Thailand

. Attend Field Acceptance Test FAT's at Vendors Manufacturing Facility

. Lead a Team of Mechanical Technician in the execution of CFTP's on

Rotating Equipment (Coupling Alignment using laser and dial indicator

method, checking softfoots on rotating machineries and coordinate with

electrical dept for rotation check and no load / load run of rotating

machineries/motors verifying temperatures and vibration)

. Lead a Team of Mechanical Technician in the execution of CFTP's on

Process Systems ( Linecheck of lines and markup as per P& ID, flushing

of lines prior to putting in service and make logs of valve isolation, simulate levels and pressure on static equipment and coordinate with

E&I for instruments testing and functions ).

. Lead the Mechanical Commissioning Team ( e.g. Technicians, Fitters

and Welders ) in the clearing of Punchlist, mechanical completion and

execution of ITR B Pre-Commissioning Scope On shore phase and

continuation of Commissioning and Start up scope until first Oil of

various systems handled in particular in location Offshore.

Hook-up & Commissioning Date - March 1989 to April 1990

Engineer :

Malaysia Shipyard Engineering

S/B Johor, MalaysiaProject

Done Accomplish as follow..

. LARUT-A CPP Topsides Esso Production Malaysia, Inc. (EPMI)

. ANDR-A Topsides (WH &Riser Platforms + Bridge & Vent Boom Petronas

Carigali Sdn. Bhd. (PCSB)

. -F23K-A Compression Topside Sarawak Shell Berhad (SSB)

. HITRA FPSO Modification Trenergy (M)

. Seligi-F and Raya-A Topsides Production Platforms Esso Production

Malaysia, Inc. (EPMI)

Mechanical/Piping Engineer: Date Jan.1988 to

Feb.1989

Sime Sembawang Engineering S / B

Pasir Gudang, Johor, Malaysia.

Project Done Accomplish as follow..

. M1PQ-A/M3PQ-A 70-MEN Living Quarters and M3PQ-A Integrated

platform.Sarawak Shell Berhad (SSB) Jerneh-A Production Platform. Esso

Production

Malaysia Inc. (EPMI)

. Guntong-D Production & Compression.Esso Production Malaysia, Inc.

(EPMI)

. Seligi-C & Seligi-E Production Platform Production Malaysia, Inc.

(EPMI)

Mechanical/Piping Engineer: Date-.Dec.1986 to

Dec.1987

Hitachi Sozen Ltd.

Ruwais Abu Dhabi

Abu Dhabi National Oil Co.

Refinery.&

Power Plant ADNOC UAE

. Responsible for ensuring that the Construction and Installation of

Static and Rotating Equipment including two Units of Reciprocating Gas

Compressor ( 4HE & 2HD NUOVO PIGNONE ) as part of the Plant Expansion

are executed in accordance to Project Specification, Standards and

Project Studies ((MTO, Engineering and construction detail drawing,

Installation and lifting procedure, site survey structural and

machinery dimensional layout, Quality Plan ) and Project Safety

. Coordinate Vendor



Contact this candidate