Post Job Free

Resume

Sign in

System Gas

Location:
Kanyakumari, TN, 629401, India
Salary:
Morethan 400 USD per working day
Posted:
June 28, 2013

Contact this candidate

Resume:

RESUME

S/o.Mr.S.Asirvatham.

Thirumoolanager,

Azhagappapuram

Post-629401,

Kanya kumari Dist,

Tamil Nadu, India.

ALWIN MUTHARASU. A

POST APPLIED FOR : FSO OPERATION SUPERVISOR

E MAIL ADDRESS : abzvue@r.postjobfree.com /

abzvue@r.postjobfree.com

CONTACT PHONE NUMBERS : 0091 984-***-****, 00964 750*******

DATE OF BIRTH : 15.01.1977

NATIONALITY : Indian

PROFICIENCY IN LANGUAGES : English, Hindi, Tamil and

Malayalam.

EDUCATIONAL QUALIFICATIONS : ( H.S.C (12 Years)

( B.Engg in Mechanical (4 year

course)

COMPUETR KNOWLEDGE : M.S. OFFICE XP, Windows 2000

PASSPORT DETAILS : Passport No - Z 2252096

Issued At - Madurai,

TamilNadu, India

CDC CERTIFICATES : PERMUDA CDC (Book no:

24077) LIBERIRIA CDC

(Book no: 838839)

PROFESSIONAL EXPERIENCES : Around 14 Years Experience In Oil and Gas

Field

Production and commissioning operations.

DURATION DESIGNATION

NAME OF THE EMPLOYER

DNO, Fishkhabour Export Facility, Mar 2011 to Production Team

Kurdistan Leader

IRAQ - Onshore. Till

present

BW Offshore - MEXICO Nov 2007 to Control Room Operator

(FPSO - Yuum Kak Naab).PEMEX KMZ

project. Oct 2010

QPD (QATAR Petroleum Development Co Ltd) Dec 2004 to Control Room Operator

-Offshore, Through Aquatic engg - QATAR

Aug 2007

TOTAL ABK (ABU DHABI) Through S.O.S July 2002 Production Operator

Recruitment Consultants (Offshore) to

Sep 2004

Indian Oil Corporation through S.S May 1999 to Tank Farm Operator

CONSTRUCTION - KOYALI,GUJARAT-REFINERY

Jun 2002

PROFESSIONAL TRAINING : ? Fire Prevention and Fire Fighting -

HIMT, Chennai.

? Elementary

First Aid - HIMT, Chennai.

? Personal

safety and social Responsibilities - HIMT,

Chennai.

? Personal

Survival Techniques - HIMT, Chennai.

? Oil Tanker

Familiarisation - HIMT, Chennai.

? Offshore

Survival (Sea Survival & Helicopter Underwater

Escape Training-ETSDC, Abu Dhabi.

? Basic Fire Fighting- ETSDC, Abu Dhabi.

? Routine Lifting Handling - TIB, Abu Dhabi.

? Basic

Slinger/Rigger Training Course - QPD, Qatar.

? Basic/Advanced First Aid Course-NMC Hospital, Abu Dhabi

? Life Boat Coxswain-ETSDC, Abu Dhabi

? H2S Awareness & Escape Course-Total ABK Abu Dhabi

- QPD Qatar

? Maintenance

Management System-YKN, Mexico.

JOB PROFILE

During the Past and Present career experienced in the following areas :

Plant and operation Safety : PTW, Hot work permit, Cold work

permit,JSA,Risk assessment, Gas testing

sheet, Isolation Statement (Valve isolation,

blind isolation, electrical isolation and

instrument isolation) and MSDS.Weekly permit

auditing, Safe chemical handling with proper

PPE,etc.

Process safety

system: Autronica Fire and Gas system, H2S

Gas detector,HC Gas Detector, portable gas

detectors, smoke detector, heat detector,

line of sight or gas line detector, flame

detector and manual call point.

Emergency safety

operation system: Knowing all the safety

Procedures and Precautions carried out in the

Offshore Platform on ESD, PSD and SDV

systems. ESD, PSD and abandon as per cause

and effect system. PSV, BDV, process push

button shutdown system, Fire push button

shutdown system (PSD and ESD in process

area), CO2 system, water mist system, PA/GA

system, etc.

Fire

extinguishers: deluge system (deluge valves,

overboard valves), emergency diesel fire

water pump, electrical

firewater pumps, jockey pumps.AFFF foam fire

extinguishers, CO2 fire extinguishers, Dry

powder fire extinguishers, Fire hydrant, fire

hose box and water oscillating monitor.

Acted ART member

and fire team member, using proper PPE in

work environment, muster point, following T

card system, Life boats, life rafts,

lifebuoy, Life Jackets and Belts. Emergency

eye wash station, emergency shower, first aid

skid.SCBA, ELSA and escape masks.

Valves LO/LC and

CSO/CSC updating, Lifting equipment colour

code, making SOC, operation and Maintenance

of various types of Fire Fighting equipments

and have knowledge's of Fire and Safety

Equipments.

Commissioning Activities : Well experienced in commissioning

and pre commissioning activities .Checking

instruments, equipments and system as per P &

I diagram.

Pre-commissioning activities

like Loop checking, air blowing,

cardboard blasting, hydro

testing, water flushing, air

drying/dewatering, steam

blowing, oil flushing chemical

cleaning, Inerting/purging, Leak

testing, Pressure testing,

pigging Level switch checking,

HP & LP Leak testing, Permit

to work issue, etc.

Co-ordinate with vendor to start

equipments .Doing

Preservations.And All Vessel

Internal Inspection as Per P&ID.

Punch List Preparation as per

P&ID,Punch List Checking and

Clearing with Maintenance dept,

Following OTP (Operational

Test Procedures), Doing PTP

(Pre commissioning test

Procedure) Following Rotary

Equipment's (Pumps,

Compressors and Blowers)

Function Test, Following Start-up

and Shut-down Procedures as per

Requirements, Following

all kind of Work Permit Systems,

Strictly and Carefully.

Commissioning

activities of the Separators,Knock Out Drum,

Surge Drum, Drain Vessels, Heaters,

Reboilers, and Exchangers &Pipe Lines

compressors, pumps, Gas Turbine, GSU, GDU,

Tank farms, utility and instrument air

compressors, Nitrogen generators. Crude

stabilization unit, Waste heat recovery unit,

Export pumps, Water treatment plant. Rotating

Equipment Trail Run (pumps, Compressors) Pipe

Line Separators, Reboilers, Heaters and

Exchangers.

Commissioning

of hot water system, fuel gas system, flare

system, cooling sea water system, deluge

system, fresh water system, oil coolers, heat

exchangers, etc.

Control Room Operation : Continuous monitoring and

troubleshooting the process through Emerson

Delta V operating DCS, Autronica F&G system,

MMI -Man Machine Interface and Rockwell PLCs

related with PSD and ESD systems. Efficient

start up and safe shut down. Monitoring and

controlling all parameters of pressure,

temperature, levels, differential pressures

and flow.

Controls the

operation of the plant from the control room

and directs action of the outside operators

to ensure continuous safe and efficient

operation of the plant. Ensures that work

practices are according to company standards.

Operation and control of wells through

different headers for optimum production.

Achieving the production goals as per

management concepts. Active participant and

process controller during emergencies and

turn around.

Co ordinate

with the production supervisor, field

operators

and the other

maintenance dept crew (Instrumentation dept,

electrical

dept, mechanical dept and other contractors).

Ensures that

all activities in the plant are covered by a

well prepared and implemented PTW.

Verification of the daily work permits and

ensures that all ongoing works are confirming

to the prescribed procedures. Verification of

the work permits are filled out clearly and

precisely. Controlling the number of hot work

permits to site specified limits Well versed

with marked up P&Id and isolation statement

supporting documents for PTW.Work request

making, work order making, work permit

preparation. And well versed in MMS. Daily

permit logging and work permit controlling.

Inhibiting/bypassing/suppressing the

detectors according to the permits and

requests.

DPS, DPR reports

preparation. Daily process trends and

downtime calculations preparation. Daily

activities report preparation. Reports

scanning and sending by mail/fax to the

offices. DCS daily log sheet readings

logging.

Well Head Operation : Operations involved in Well Head X-

Mas tree valve, operations with Baker Panel

facilities, Well Testing, Monitoring through

Test Separators. Well versed in operations of

Adjustable Choke. Diverting the Well into

Test/ Production Separator through

production/test headers, Monitoring Gas and

Oil flow, monitoring all the parameters of

the Test Separators and Platform, Oil and

water rate is measured by Daniel flow meter,

Start-up and Shut-down procedures of the Well

in the Emergency Circumstances, operations

involved in the Artificial Lift such a Gas

Lift and ESP. Adjusting choke for optimum

lifting gas to the wells.

Operation of

high pressure gas injection system, High

pressure gas injection wells. Water injection

wells operations, Casing Depressurizing.

Central Production Facility : Receiving Crude from different

wellhead platforms,

Separators

(Two/Three phase), emulsion treatment, oil/oil

heat

exchangers (plate type),hybrid

heaters (shell

and tube type),oil booster pumps(centrifugal

pumps), oil

coolers by sea water(plate type),flow meters to

center

tanks/metering skid to export.

Degassing

drum, oil skimming control, water separation

from oily

water, water injection pumps, operation of water

injection

wells. Closed drain drum and open drain drum,

closed drain

and open drain pumps operation.

LP stage

compressors (reciprocating type/centrifugal

type),gas

dehydration unit,HP stage compressors, gas

injection

wells/gas export.

Gas sweetening

unit,LP fuel gas to boiler,HP fuel gas from

flotech

reciprocating compressor to turbine. Acid gas to

export through

flotech reciprocating compressor.

LP/HP flare

headers, LP/HP flare KOD.

Crude oil transfer pumps, gas/oil corrosion inhibitor,

pumps,

antifoam injection pumps, operation of dual

fuel

turbine for

power. hot water heating medium system (by

boiler/waste

heat recovery unit).pumps, plate type oil/oil

heat

exchangers, oil hybrid heaters, oil coolers

changing

over.

Operation involved nitrogen blanketing and

keeping

positive

pressure on the vessels.

Gas Dehydration Unit : Natural gas dehydration and glycol

regeneration. Electrical heater operation,

Glycol Flash Drum, Glycol/Glycol heat

exchanger,Cartridge Filter, Charcoal Filter,

Filters Changing, Dry gas outlet Scrubber

Operations, Glycol Booster Pump Operations.

Maintain the Reboiler Temperature, Reboiler

top gas temp maintaining, Glycol Storage Tank

Level, blanket pressure Maintaining, Glycol

surge tank level maintaining, Topping up of

Glycol to the glycol storage tank and surge

tank. Surge tank and Flash tank pressure

maintaining by dry gas, PH controller

Injection, Antifaom Injection, GDU Shut-down

and Start-up Operation. Glycol sampling for

lab analysis, assisting lab tech for dry gas

analysis

Gas Sweetening Unit : Sweet gas preparation and amine

regeneration. Contactor, Regenerator. Level

and pressure maintaining in surge tank, flash

tank, reboiler and reflux drum. Controlling

the amine flow. Amine pumps and reflux pumps

change over, priming, strainers cleaning,

abnormal sound checking, vibration monitoring

leak checking like gland and end plate leak,

etc. Rich particle filter and lean amine

filter inspection and replacing. Lean

amine/rich amine heat exchanger temp

monitoring. Inlet gas cooler temp

maintaining, Inlet gas filter separator and

outlet gas scrubber level maintaining,

maintain the reboiler temperature, Maintain

the flash tank pressure and surge tank

pressure by outlet gas scrubber.

MDEA and DM

water topping up to the surge tank, antifoam

chemical injection whenever needs, fin fan

cooler and condenser damper openings for temp

maintaining, hot water flow control for

maintaining the reboiler temp,Control of

reflux drum pressure for start up of Flotech

compressor(acid gas compressor).Bypassing

detectors for analyzing H2S content in sweet

gas. Assisting the lab tech while checking

H2S concentration in fuel gas. lean and rich

amine sample collection for the lab analysis.

Familiar with start up and shutdown

operations.

Gas Compressor Unit : Inject High Pressure Dehydrated Gas into Well

Reservoir/compress and export to the other

platforms, Operation and Maintenance of

Multistage reciprocating and centrifugal

Compressors.LP stage and HP stages. Start-up

and Shutdown Operations of Compressors. LP

scrubbers,HP scrubbers, produced gas

scrubbers,LP coolers,HP coolers and produced

gas coolers operations. All scrubbers level

maintaining, Cooling Fan Operations.PLC

operations, antisurge valves, primary seal

gas and separation gas adjustments. Lube oil

pumps and maintaining the level in lube oil

tanks, lube oil coolers and heaters, run down

tank overflowing check while start up, casing

drain draining, liquid return Pumps

Operations. Injecting gas corrosion inhibitor

in gas export lines, gas export pressure

maintaining.

Flotech comp:

double acting reciprocating type. Fuel gas

side - compressing the fuel gas from 17 bar

to 38 bar for the turbine fuel gas. Acid gas

side - compressing the acid gas from 0,8 bar

to 5 bar and 5 bar to 17 bar for exporting

the acid gas. Lube oil and frame oil levels

maintain, Acid gas drain collector, fuel gas

drain collector and scrubbers level

maintaining, Coolant pump and lube oil pumps

abnormal conditions checking, coolant

pressure maintaining,PLC operations,etc.

Flaring System : Achieving zero flaring as per the

management, LP/HP flare headers and LP/HP

KOD. KOD liquid return pumps - screw pumps

and centrifugal pumps, Liquid return pumps

leak checking, vibration monitoring, priming,

strainer cleaning,

abnormal sound

checking. Diesel soaking in KOD when pump is

not pumping.

LP flare and HP

flare. hot flare and cold flare. Pilot gas

adjustment. Propane bottles for initial start

up after shutdown. flare control panel,

igniters, manual ignition, flash back

arrester, water seal,etc.

Water Injection System : Injecting high pressure treated water to the

oil reservoir for maintains the reservoir

pressure. Pumps operation, water lift pumps,

water treatment unit.Injecting chemicals in

the manifolds, adjusting the flow rate of the

chemicals.

Chemical Injection System : Handled following Crude Oil Injection and

Treatment Chemicals such as Pour Point

Depressant, Demulsifer, Antifoam, Liquid

Phase Corrosion Inhibitor and Water Injection

Chemicals such as Biocide, Oxygen Scavenger,

Corrosion Inhibitors, Poly Electrolyte and

Scale Inhibitor. And gas Treatment Chemicals

like Glycol and gas phase corrosion

inhibitor.

Tank Farm Operations and : Erection, Pre-commissioning,

Commissioning,

Commissioning Decommissioning, Startup,

shutdown, normal operation and

Troubleshooting

activities.

Tanks and

pipelines erection and checking as per P&ID and

vender

documents, Tank calibration, Hydro test of the tanks

and pipelines,

Cardboard blasting, Pigging of the pipelines

with different

types of pigs including launcher/ receiver

operation and

communication, Flushing, Purging, Pressure

testing of the

pipelines.

Crude oil

separation by method of mixing, settling and water

draining. Fuel

oil handling and storage. Water draining of

crude and

finish product tanks. Tank Sampling.

On line tank

change over. Tank to Tank transferring,

Monitoring

current level of the tanks/ Tank gauging and Dip

memo

Preparation, Monitoring Temperature and Pressure in

Tanks &

Bullets. Checking and Ensuring Nitrogen Blanketing

in tanks and

Bullets. Checking of Pressure Vacuum Relief

Valves in

tanks, Blending operation.MOV operations.

Operation &

Control of Roof Top intermediate Tanks, Float

Top Main

Tanks, handling transfer pumps, booster pumps

and Main

pumps. Pump operation for Loading, unloading and

oil movements.

Pumps operation like changeover, handover

for

maintenance. Metering of the fluids by turbine type

metering skid.

Proving operation by prover.

Housekeeping

in tank farm area.

Utilities : Turbine: Well versed in dual fuel power turbine start up

and stop operations, waste heat recovery unit

operation, turbine fuel changing over,

turbine manual cranking.HP fuel gas filters

inspection and replacing.HP fuel gas filters

and heaters change over.

Diesel

generators: start and stop operatios, diesel

tank level maintaining, battery charging,

assisting the maintenance dept for weekly

test run,etc.

Utility air

compressors: utility air compressors and

Instrument air compressors start and stop

operations, vessel liquid drainig, lube oil

level maintaining,etc.

Nitrogen

generators: filters, dryers, O2 content

monitoring in the nitrogen, filters changing

over, liquid draining in the vessels.

Boilers: boiler

operations (niprox unit, boiler water

analysis of ph, chloride and oxygen), hot

water system temp maintaining, hot water

expansion vessel pressure and level

maintaining. Shunt pumps operation. LP fuel

gas filters inspection and replacing. Fuel

gas filters change over.

Pumps: cooling

sea water pumps operation, cooling sea water

pressure maintaining, efficient pumps

changing over. pumps starting, stopping,

strainer cleaning, abnormal sound checking,

vibration monitoring, leak checking,etc.

RO Unit: Reverse

osmosis unit start up and shut down, fresh

water pumps, fresh water pressure

maintaining. chemical injection.RO back

washing and filters change over.

FPSO Turret : APL STP operation, Internal

Turret type, Framo Engg swivel (swivel 1600-

2,swivel 1162-3,HPU swivel and Slippering

swivel),swivel barrier fluid supply pressure

checking,checking of drallim emergency shut

of EV's hydraulic leak. leak pot pump

operation.drallim smart EV's opening, closing

and resetting, barrier seal leak checking,

checking barrier seal pumps running

conditions, barrier fluid topping up,

circulation tank level checking, monitoring

the bilge water level, pneumatic bilge wilden

pumps operation, hydraulic bilge pump

operations, rope tension checking and torque

alarm checking.

Every day turret

routine visit, Vibration monitoring in the

gas export line and the other oil flow lines

by portable vibrometer.Alarm checking on

swivel control cabinet and Turret control

system panel.

Job Responsibilities:

1. Patrolling and monitoring all parameters, running conditions and

abnormalities

2. Reporting any abnormalities immediately to my production supervisor

and take possible corrective action.

3. Responding immediately for any fire and gas detection alarm, reporting

and updating the situations to CCR.

4. Co ordinate with the contractors and co workers.

5. Readings taking, recording and maintaining the daily log sheets.

6. Efficient start up, safe shut down and routine operation for a smooth

running plant.

7. According to the work permit, preparation for the job (isolating the

required valves, ask CCR to inhibit the nearby detectors, draining,

venting, flushing, purging, H2S&HC concentration checking) and putting

tags according to the valve isolation statement and hand over to the

work permit responsible technician.

8. Checking the rotating equipments conditions like abnormal sound,

vibration, lube oil level, any leaks, nut and bolts tensioned, etc.

9. Efficient pumps changing over, start, stop, checking the line up,

priming if need, checking the vibration, abnormal sound, leakage, etc.

10. Pumps seal pot pressure, level maintaining.

11. Start and stop the pumps locally in emergency situation.

12. Wells, compressors, Turbines, GSU and GDU start up preperations, start

up and shutdown.

13. Assisting the maintenance dept whenever required.

14. Assist in carrying out the Routine Weekly Run Tests of Equipments like

Emergency Diesel Generator diesel and Electrical Fire Pumps. etc.,

15. Continuous maintaining preservation of valves, flanges, bolt nuts,

instruments and equipments by greasing, covering with denso tape and

securing.

16. Chemical inventory updating, chemical transferring to the tanks,

Antifoam preparation (silicone fluid with diesel), injection flow rate

adjustment as per requirements, handling the chemicals with proper

PPE, following MSDS, etc.

17. Participate under instructions, In Launching Pigs into Pipelines,

Prepare Pig Receiver Stations and remove the Pig and check it for

damage under the guidance of the production supervisor.

18. Unload Chemicals into Tanks for Injections, Start and adjust the Flow

Rate of Chemical Injection Pumps as required.

19. Bypassing LCV, PCV, TCV and FCV valves whenever needs as per ccr

instructions.

20. Collecting Oil, Gas, oily water, condensate and RO water Samples for

the Laboratory for Analysis.

21. Testing of SSSV under the supervision of production supervisor.

22. Checking the Leakage of Gas like H2S and HC.

23. Pressure testing and leak testing of the systems after the job

completed.

24. Providing opportunities for training and development employees (with

emphasis on Nationals).

25. Proper hand over in every shift and every rotation to my back to back.

I hereby declare that the information furnished above is correct and true

to the best of my knowledge.

Thanking you

Place: India Sincerely

Yours,

Date: 01.09.2012 Alwin Mutharasu. A



Contact this candidate