Circle
The Woodlands,
Texas *****
Caleb.Flower@gmail.
com
Caleb Benjamin Flower
Experience Jan. 2011 to Present GE Jenbacher
Houston,Tx
Field Service Engineer
Commissioning of GE Jenbacher Natural/Bio Fuel engines
throughout the World. Worked on the Controls, Electrical, and
Mechanical systems with the Engines as well as Configuring
software to correct Gas to Air ratios and Power variables.
Completed final check list of engines including Timing, Valve
stem set points, Gas Variables, and Spark Plug gaps. My job is
to make sure the engine is ready for max performance and ready
for customer use. Another task is to train the customer to use
the control system and interact with customer on a daily bases
to provide status of completion and to answer any questions
they may have.
July 2010 to Dec.2010 Pro Energy Services
Sedalia, Mo.
Controls Technician
Was assigned to Puerto Ordaz Venezuela working on two LM 6000's
and one GE 7EA. This plant is a simple cycle plant. My duties
are point to point checks, instrumentation calibration, and
loop checks on the LM 6000's and balance of plant.
Worked on two LM 6000's in Tacoa Venezuela resolving
interconnect cabling issues and working with the
instrumentation group.
Dec. 2009 to July. 2010 F.W. Marsh & GE/KVB
Hampstead, NC
CEMS Technician
Was assigned to The Marafiq Plant in Al Jubail, Saudi Arabia
for the installation and commissioning of CEMS systems for 12
GE frame 7 FA's. The site was a combined cycle project which we
also had to install and commission CEMS systems on the bypass
stacks for the boilers. My job duties consisted of installing
the sensing line and probes, installation of the CEMS
monitoring rooms, point to point checks, instrument
calibration, and loops checks.
Was assigned to GE Oil & Gas working on PG-10 units at
Vanderbilt University. This assignment was to replace the
bearings and instrumentation associated with temperature and
vibration.
Sep. 2009 to Nov. 2009 Hi-Tech Electric
Houston, TX
Electrician
Worked on the remodeling of various High Rises and
Manufacturing Facilities throughout the Houston and surrounding
areas. Responsibilities included running of rigid and EMT
conduit, Replacing main feeders, installation and wiring of
transformers and adding new light fixtures and circuits.
Feb. 2009 to Aug. 2009 Pro Energy Services Sedalia, MO
Field Service Technician (controls)
Worked on the refurbishment of two GE LM 2500 packages. This
involved changing out the old control system from a Woodward
501turbine control to Allen Bradley PLC 5000. With the change
of control systems there was major changes done to the wiring
and instrumentation of the unit, fire system and generator
protection. My duties were to aid and direct craft personnel in
the installation of the new systems.
Worked on two GE frame 7B gas turbines in Panama during
commissioning and check out of the units. Installed the
Chematron fire system field devices for unit 200. Worked on all
on engine instrumentation and generator systems. Performed loop
checks and point to point activities.
2008-2009 Wood Group Power Solutions Houston,
TX
Field Service Technician (controls)
Mattison Generating Station (Springdale Arkansas): This plant
had 4 GE frame 7EA gas turbine packages with GE Mark V controls
and Allen Bradley DCS system. I was responsible for point to
point checks on DCS, troubleshooting issues with field
instrumentation, waste water system, and clearing items off the
punch list.
Riverside Generating Station (Tulsa Oklahoma): This plant had 2
GE frame 7EA gas turbine packages with GE Mark V controls and
Allen Bradley DCS system. I was responsible for point to point
checks on DCS, troubleshooting issues with field
instrumentation, and clearing items off the punch list.
Was part of the unit refurbishment team were we did GE LM 6000
and LM 2500 package conversions from 60 HZ to 50 HZ with
control system modifications. The units were converted from
Woodward Governor control systems to Allen Bradley 5000 series
PLC's, fire system upgrades, complete new package wiring, new
instrumentation, and construction of new generator lube oil
systems.
Nov. 2007 to Feb. 2008 I.C.A.T.S Inc. Tulsa, OK
Electrician / Supervisor
Responsibilities included the installation and overseeing of
electrical and instrumentation systems for process skids being
manufactured at Lindy facility in Tulsa Oklahoma.
Sep. 2007 to Nov. 2007 Oil Capital Electric Anadarko, OK
Electrician
This project was the electrical installation for two GE frame
7EA gas turbine units. My duties covered the industrial
installation of cable tray, rigid conduit, cable pulling, duct
banks, and terminations.
June 2007 to Sep. 2007 Commercial Electric Conroe, TX
Electrician
Commercial Electric held contracts for the installation of
diesel generator sets for all of Consolidated Communications
telephone switching stations. These duties required the
installation of the generator sets, switch gear, and transfer
switches as well as the commissioning of the systems.
Worked on Philmop doing commercial electrical installation for
a multi-story building with warehouse space.
Jan. 2007 to May 2007 Midwest Electric Houston, TX
Electrician
Worked on commercial electrical installation on hospitals.
Responsibilities included the installation of conduit, cable
tray, light fixtures, pilling wire and terminating.
June 2006 to Jan. 2007 Melton Electric Houston, TX
Electrician
Responsibilities installation of commercial electrical systems
and electrical maintenance for Chevron Petroleum.
Education The Woodlands High School The Woodlands, TX
Licenses Licensed Texas Apprentice Electrician
Languages English
References: Available upon request