KATHIRAVAN.D
Pallavan Nagar,
Avadi, Chennai, Tamil Nadu, India - 600071.
Mobile: 91 - 988-***-****
Email: **************@*****.**.**
Seeking assignments in the area of Industrialization Engineer / Industrial
Engineering (Production Engineering) in a growth oriented organization.
Skills and Experience at present
Michelin India Tamilnadu Tires Pvt Ltd
March'2011 - Present
Engineer in Industrialization Engineering.
V Went for Industrial visit to Thailand to know about tire
manufacturing process for 2 weeks.
V Went to U.S.A for training and on job as Industrialization
engineering for 2 years.
V Know how to industrialize new dimension in the plant.
V Maintain the quality of the dimension which has already been
Industrialized and running in normal production.
V Taken the responsibility for the 15 dimensions and achieved the good
quality results in those dimension.
V Achieved good results in one of the company project by implementing in
normal production and presented to the top management about the
results for the quality improvement.
V Know how to design a product in XAO (CATIA).
Skills and Experience for past
M/S SL Lumax Ltd, Irungattukottai
Since Aug'2006 - March' 2011
Engineer in Industrial Engineering.
V Leading the team for the past 2 years & achieved monthly targets.
V Developing new project scopes.
V Expertise in preparation of Process Mapping, PFMEA, Work Standard and
taking counter measures for all quality issues.
V Extensive experience in making Semi automations, Installation of new
machines, Layout improvement in total plant.
V Expertise in implementing cost saving measures to achieve substantial
reduction in terms of man-days, production cost and raw materials.
V Resourceful at strategizing techniques for maximum utilization of
manpower/machinery.
V Gained exposure to safety procedures, implementation procedures for
reducing accidents and ensuring compliance to safety & statutory
requirements.
V An effective communicator with the ability to handle multiple tasks.
Organizational Experience
Implementing / Introducing the New Line Set Up For New Project.
V Takt time Calculating.
V Previous problem History Details
V Assembly process Setting
V Fixture & Machine Requirement Identifying
V Cycle time with Method study, Motion study & Load chart.
V Line set up with different types of layout in order to eliminate
the varies losses & Operator fatigue.
V Installing semi automation using pneumatics, hydraulics &
motors.
V Manufacturing process flow & Process FMEA interlinking with
Design FMEA.
V Preparing work standard with Does & Don'ts.
V Operator training about the quality standards & Does & Don'ts in
the line.
Productivity & Quality Improvement
V Material flow study.
. Inline material flow.
. Child parts material flow to the line.
V Layout changes to increase productivity & quality.
V On line material flow without stacking.
V Single Pease flow study.
. Cycle time study.
. Motion study.
. Load chart.
. Layout.
V Semi automation.
V Losses & fatigue elimination.
Cost reduction Activity
V Raw material source / grade change.
V Man power reduction using some automation.
V Reducing PPM in house plant.
. Process improvement.
. Quality improvement.
Process Engineering
V Process capability & machine capability study.
V Capacity calculation for total plant.
V Managing production related tasks including planning, control
and trouble shooting
V Supervising the daily activities of the production workforce
using Policy Deployment goals and objectives.
V Optimizing man & machine utilization to achieve pre set
production and delivery targets, in accordance to the weekly
delivery plans.
V Implementing strict measures in operating procedures and
equipment centerlines to optimize resource/capacity utilization.
Significant Achievement
V Handling the team without any senior level person for past 2
years.
V Implemented the new projects for
. Ford - 2 (Festia & Figo).
. Hyundai - 3 + 1 (Getz Prime, i10, i20 + i10 F/L on
progress).
V Assembly line layout change and reduce each line 2 man power and
increase productivity.
V Installed pick & place robot in our molding shop and increased
quality.
V By changing process sequence in paint shop and reduce the PPM
level in paint shop.
V By modifying the jigs & fixtures design and increased the
production quantity.
V Installed the error proof system in the assembly line and
reduced the PPM level in our customer end.
V Installed semi automation line and increase the productivity in
the assembly line.
V Cost saving done up to 350 million by reducing the man power,
raw material source change & PPM level reduction.
IT Skills
Office Automation MS-Office -2003 / 2007
Design Auto Cad 2000 / 2007, XAO
(CATIA)
Browsers IE 7.0, Mozilla Firefox
Education
- B.E. (Mechanical Engineering) from Ranipet College of Engineering,
Ranipet, Tamil Nadu
- University: Anna University.
Date of Birth: 28th November 1984
Languages Known: English & Tamil
My Attitude
I am a sincere, loyal and dedicated individual who has a
great deal of ambition. Although I have extensive experience in the
Automobile industry, I love to learn, and am always up to a challenge. I
get along well with others, while also working efficiently on my own. I am
seeking a position where I can develop and excel while giving my best to an
employer.
Place: Chennai. (India)
Date:
D.KATHIRAVAN