Wayne Yarbrough
*** ***** ** ********* **. *****
**********@***.***
Experience
**** ** ******* ***** *********** Inc. Seminery Ms.
Project Manager 2007 to 2013
Manage up to 11 jobs in 2 states. overseeing schedule, Bidding
jobs and making sure manpower was in place to complete job.
1988 to 2007 L&A Contracting Co. Hattiesburg Ms.
2000 to 2007
Manage up to 8 jobs in4 states ranging from $8M to $47M
Overseeing budget, schedule and review estimates for bid. Projects
included all phases of work from clearing, excavation and embankment,
drainage, and bridges through base work and completion. Manage
as many as 15 different subcontractor's per project and 200 company
employees at one time over a 4 state region.
1. Long and short bridges from 4000 ft to 2 span county bridges.
2. Marine as well as land bridges.
3. segmental and post tension beam bridges.
4. Deep water cofferdams and drilled shaft foundations.
5. Maintain safety standards.
6. Pile driving.
7. Bascule bridges
Superintendent $ 42M olive Branch Ms. Project consisted of 5 miles of roadway
1996 to 2000 and 5 bridges with steel and concrete girders .
Superintendent Two projects totaling 38M over intercostal waterway. Project used
1990-1996 Bulb Tee concrete, steel and Post tension girders for 3 spans. Both jobs
involved using barges and demolition of old bridges which was carried
out and dumped for artifical reef.
Superintendent 24M Alalachicola, Fl. project. 3 mile bridge all over water consisting of pile
1988 to 1990 driving, setting girders and pouring decks. Removal of 3 miles of old bridge and
placed in a fishing reef offshore.
$8M Pensacola emergency repair job; replaced 400 ft. steel span and substructure
in 120 days.
Superintendent Harbert International, Inc. Birmingham, Ala.
1970 to 1988 Started as a laborer and over time became job superintendent of large highway and
heavy/bridge construction projects.
Experiencing the highway/bridge business from the ground up gives me a keen
awareness of what it takes to do all task required.