RESUME

SUMMARY;

A 24 years of experience in Electrical and Instrumentation Construction and

Maintenance; A consistent level of success has been achieved through

diligently, efficient. QA/QC Inspector E&I in construction for the

following plant: NGL plant, Oil & Gas plant, Petrochemicals plant and FPF

plant, QA/QC Manager I&C in Power Plant, QA/QC Inspector Instrumentation in

Upgrade Utility Juaymah Gas Plant (Saudi Aramco), Pre-comm. &

commissioning. MC Turnover Engineer in Linde Engineering AG, for Shell

Pearl GTL in Ras Laffan Industrial City, State of Qatar. (TPI) Third Party

Inspection E&I Inspector in Bureau Veritas for Abu Dhabi Oil & Gas Refinery

(TAKREER), Ruwais, Abu Dhabi, UAE and recently MC System Handover Engineer

in AMEC for (WC) West Chirag-(COP) Chirag Oil Project, Flat Form(Topside &

Drilling). And responsible to the assigned task from superior and with good

communication skills.

CODES & INTERNATIONAL STANDARD FAMILIARIZED;

NEC, IEEE, IEC, NFPA, ANSI, ISO, ISA, BS, API, ASTM, ASME, NEMA, SAES &

SAMSS, (Saudi ARAMCO Engineering Standards & Material Specifications.)

ELECTRICAL/ INSTRUMENTATION SYSTEM FAMILIARIZED;

Installation and commissioning of Instruments, PLC, DCS, and 13.8 kV to

230kV Substations, 66kV Switchyards Low & Medium Voltage Motors. Cathodic

Protection System, Un-interruptable Power Supplies (UPS). 34.5KV

Transformers, Switch gears, Motor Control Centers, Fire Alarm System,

Distributive Control System, HVAC, Automatic Transfer Switches for

Emergency Power Supplies & Motor Generator Sets. Thyristors Drives Diesel

Engine Generator Sets, 2.4 kV Water Well Pumps & Overhead & Gantry Cranes.

WORK EXPERIENCE:

May 2012 to April 2013 AMEC

Position MC System Handover Engineer

Project (WC) West Chirag-(COP) Chirag Oil Project,

Plat Form(Topside & Drilling)

ATA Yard 3 South Quayside Sabil District

Bayil,Baku,Azerbaijan

For Bp Global Company

Job Description as: MC System Handover Engineer,

Reporting to (HOD) Hand over Department Manager and responsible for the

following:

1. Coordinating and ensuring all equipment within the project are

in accordance with specific requirements.

2. Follow up MC Scoping for the Platform assuring contractor meets

the handover schedule to meet specified Platform topside &

drilling status at delivery

3. Assist the contractor with definition of MC packages and

allocating MCCR in GOC for the Platform topside & drilling.

4. Assist CCN, SIN & SEQ to closed and to commissioning as

required.

5. Ensure that all work performed in MC/Commissioning is in full

compliance with the Operator and HHI safety regulations

6. (MC)- Mechanical Completion

7. (DMCC)- Discipline Mechanical Completion Certificate.

Then submitted to assigned Engineer for final review and approval,

Then submit to the Client for acceptance.

July 2011 to June 2012 Bureau Veritas.

Position E & I Inspector (TPI)

Project TAKREER Ruwais Refinery Expansion, package #3

O&U project

For Abu Dhabi Oil Refining Company (TAKREER)

Job Description as: QA/QC Inspector E&I;

Reporting to QA/QC Manager and responsible for the following:

To implementation of quality plans & procedures, conduct site inspection of

electrical & instrumentation works.

. Monitors day-to-day activities, including the inspection of the

materials, of the Construction Contractor along with the contractor's

inspectors to ensure compliance with contract documents,

specifications, codes and standards.

. Examine the installation of electrical systems and equipment to ensure

that they have been installed correctly, functioning properly, have

been tested in accordance with procedures and industry standards and

comply with electrical codes and standards.

. Perform "Hold" "Witness " and "Surveillance" Inspections and tests at

construction site to ensure compliance with Occidental of Oman

requirements and project specifications.

. Record legibly and accurately all controversial and non-complying

construction practices, materials and equipment and report to

supervisor detailed potential problems for early resolution.

. Raise Non Conformance Reports (NCRs) and Discrepancy Report (DR), when

activities deviate from the Contract Specifications or normal

Construction industry practices.

. Preparation and/or review of handover documentation packages as

required.

. Assist in the training of other inspection personnel and performing

External Quality Audits.

. Ensure that the Construction Contractor has proper work plans and

Method Statements to address work around live power systems and live

control systems.

. Ensure that wiring, instrumentation and equipment installation is per

the highest level of industry practices.

. Ensures that equipment, instrumentation and wiring are properly tested

and documented as required to ensure proper operations.

. Ensures all required documentation for the project is completed in a

satisfactory and timely manner, including construction documentation

and material inspection reports and certifications.

. Witness the calibration of instruments and ensure the required

certification is produced.

. Reviews the construction plans, drawings and manages documentation.

. Assure the Construction Contractor has the right resources to do the

job, that the Construction Contractors' equipment is in a safe working

condition, and that any permits or equipment certificates are

available.

. Witness/inspection for installation of Cathodic activities

(Installation of anode mesh, conductor bars, spot welding, permanent

reference electrodes, power feeders, resistance and potential test).

. Works with the Senior Field QC Inspector to establish weekly and day-

to-day work priorities for the Construction Contractors, if required,

and communicate it to the Construction Contractors.

. Ensures that any critical material receipt information associated with

equipment and material being provided by Contractor is received and

distributed properly.

. Reports major Construction Contractor performance and quality

deficiencies to the Occidental Quality Control Manager or Senior Field

Inspector for resolution.

. Ensures that the contractor inspectors fulfill their quantity survey

and inspection/ quality assurance functions.

Aug. 2010 to Feb. 2011 Linde Engineering AG.

Position Mechanical Completion (MC) Turnover Engineer

Project Pearl GTL project (Ras Laffan Industrial City)

For Shell and Qatar Petroleum.

Job Description as: MC Turnover Engineer,

Reporting to (TOD) Turnover Department Manager and responsible for the

following:

. Develop and maintain system turnover definitions and schedules

including alignment with the Quality Assurance (QA) team.

. Coordinate completion of contractor construction activities in systems

and prepare punch lists to ensure readiness of systems for release to

the client.

. Liaise with Engineering, Quality Assurance, Maintenance and Operations

during turnover and acceptance ensuring smooth transition from

projects to operations.

. Review dossier document as per index aligned with system turnover

definitions.

. Provide weekly and monthly reports with regard to the status of system

completions.

. Ensure turnover is in accordance to company policies, standards and

procedures.

. Compile all turnover documentation including maintenance manuals and

procedures.

. Collaborate with Maintenance Planning and Operations TCCC (Turnover

Care Custody Control) to obtain required sign-offs.

May 2008 to Aug. 2009 Arabian BEMCO Contracting Co. Ltd.

Position QA/QC Engineer/Inspector Instrumentation

Project Upgrade Utility of Juaymah Gas Plant, Kingdom

of Saudi Arabia.

For Saudi Aramco Juaymah Gas Plant (Saudi Aramco).

Job Description as: QA/QC Inspector E&I:

(Same above mention)

Sept. 2006 to May 2008 Arabian BEMCO Contracting Co. Ltd.

Position QA/QC Manager I&C

Project Power Plant Project-9, 1800MW, Riyadh, KSA.

For (SEC)-Saudi Electric Company. Power Plant No.9

Job Description as: QA/QC Manager, I&C

Reporting to QA/QC Director and responsible for the following:

1. Implementation of Quality Management System (QMS) in accordance with

ISO-9000 series 200.

2. Implementation of Project Quality Plan (PQP), Inspection and Testing

Plan (ITP).

3. Approves Project's Method Statements (MS) and ITP'S.

4. Implementation of Work Procedures and conduct site inspection of

instrumentation and control works.

5. Issues and monitors Non-Conformance Report (NCR).

6. Supervises all QA/QC Inspectors/Engineers.

7. Attends a period QA/QC meeting with the client, project's management

personnel and QA/QC Engineers/Inspectors.

8. Attends a weekly Quality Meeting to discuss and solve NCR's, CAR's,

and other issues that affect Quality and work deadlines.

9. Monitor the receiving, issuance and retrieving of all drawings.

10. Conducts Quality Audit as per Quality Plan

11. Implements Quality Training Program of the company..

12. Other works that my immediate supervisor may assign.

March 2005 to June 2006 Petrofac Int'l Ltd. (main office, Sharjah,

Dubai, UAE)

Position QA/QC Inspector E & I

Project RAG & Flare Mitigation Integrated Project,

Mesaieed, Qatar

For Qatar Petroleum (QP) Project.

Job Description as: QA/QC Inspector E&I:

(Same above mention)

Sept. 2004 to Feb.2005 Petrofac Int'l Ltd. (main office, Sharjah, Dubai,

UAE)

Position QA/QC Inspector E & I

Project PSA2 Processing Facilities & Pipelines Project

(PSA2,Baku,Azerbaijan,)

A crude oil processing plant. A joint venture of

AMEC/Petrofac and Spei Capag

For BTC - AGT Pipeline Project.(Bp Global)

Job Description as: QA/QC Inspector E&I:

(Same above mention)

Jan. 2004 to June 2004 Petrofac Int'l Ltd. (main office, Sharjah, Dubai,

UAE)

Position QA/QC E&I Coordinator/Inspector/Supervisor

Project Diffra Field Processing Facilities & Flow lines (Diffra, Sudan,

Africa).A crude oil processing plant. A joint venture

of Petrofac and Heigleig Co.For OGP/GNPOC Greater

Nile Petroleum Operating Company Ltd.

Job Description as: QA/QC Coordinator/Inspector E&I:

(Same above mention)

July 2002 to July 2003 ABB Lummus Global (Ohanet, Algeria)

Position QA/QC Inspector E&I

Project Ohanet Gas Development project (W-llizi, 33000, Ohanet,

Algeria).A gas processing plant. A JV of ABB and

Petrofac for BHP- Sonatrach.

Job Description as: QA/QC Inspector E&I:

(Same above mention)

July 2001 to March 2002 Kassim Darwish Fakroo & Sons (KDS) (Under

TAILIM Co.) (Doha, Qatar)

Position QA/QC Lead Inspector E&I

Project Expansion NGL-3 plant project (Mesaieed, Qatar).

A joint venture of

Snamproggetti and Hyundai for (QGPC) Qatar General

Petroleum Company.

Job Description as: QA/QC Lead Inspector E&I:

(Same above mention)

Sept. 1999 to April 2001 Saudi Arabian Kent Co. Ltd. (Yanbu, Saudi

Arabia)

Position QA/QC Inspector E&I

Project Power, Desalination, Seawater Cooling Plant

upgrading project.

A Power, Desalination, Seawater Cooling Plant

upgrading project for ARAMCO.

Job Description as: QA/QC Inspector E&I:

(Same above mention)

Aug. 1997 to Sept. 1999 Saudi Iron & Steel Co. (HADEED) (Jubail, Saudi

Arabia)

Position Sr. Instrument Technician

Project Operation and Maintenance online gas analyzer (Jubail, Saudi

Arabia).

Job Description as: Sr. Instrument Technician:

Reporting to E&I Supervisor and responsible for the following:

Maintained, calibrate, service, troubleshooting and repair of all Gas

Analyzer Instruments such as Gas Chromatograph, Ultramat, Oxymat,

Monocolor, Gas coolers, Diaphragm pumps, Heaters, Flowmeters, Gauges,

Pressure, Level, Temperature and Selector switches, Pressure regulator,

Solenoid valves, Filter and Sensors.

Instrument/Equipment Used: Siemens, Ashcroft, Norgren, and

Honeywell

Sept. 1996 to June 1997 MAN-GHH Oil and Gas Division (Ras Lanuf, Libya,

SPLAJ)

Position Construction Supervisor E&I

Project Gas Processing plant (RASCO) Rasgas Co. (Ras Lanuf, Libya,

SPLAJ).

Job Description as: Construction Supervisor E&I:

Reporting to Construction Manager and responsible for the following:

. Supervise the construction to ensure the project implemented in

accordance with drawings, codes and procedures and executed in

compliance with project requirements.

. Orders materials from warehouse and vendors.

. Coordinates/Supervise work done by fabrication shop.

. Writes method statement and permits to work for crews.

. Reviews and implements design criteria and specifications as per

client requirements.

. Reviews and understands the project activity models for engineering

and specific discipline including the project requirement checklists

and relevant sections of the Project execution manual and of the

project procedures manual.

. Wrote technical procedure manuals to comply with specifications.

. Prepared detailed documentation concerning the condition of equipment,

repairs needed, and repairs completed.

. Experience in layout & detail design of secondary E & I support

system.

. Assigned work to employees, using material and worker requirements

data.

. Supervised repairmen, counseled mid-level supervisors, and reduced

department workload.

. Observed operation of installation for conformance with operational

standards.

. Installed power and lighting circuits. Examined and inspected work

progress, equipment and construction sites to verify safety and ensure

that specifications being followed.

. Supervised and coordinated activities of construction trades workers.

. Directed and led workers engaged in construction activities.

. Measured, cut, and installed wires and cables.

. Strong background in both client and vendor relations.

. Tested voltage, resistance, and phase angle in circuits, using

voltmeters, ohmmeters, and phase rotation indicators.

. Prepared and maintained all equipment used in safety and compliance

testing. Passed all equipment tests successfully.

. Have been involved in the commissioning of electrical and

instrumentation systems.

. Analyzing all technical drawings & identify inconsistence among

design.

. Presented alternative designs to engineering staff & clients. Provide

reports to Project Engineer / Manager as necessary to ensure

satisfactory communication and control.

. Monitor effectiveness of Safety Programs.

April 1994 to Jan. 1995 Compagnia Electroticnica Italiana (CEI) (Agip

100, Buattifel, Jalu, Libya, SPLAJ)

Mar 1993 to Sept. 1993 Compagnia Electroticnica Italiana (CEI) (Agip 100,

Buattifel, Jalu, Libya, SPLAJ)

Position Construction Supervisor Instrumentation

Project Liquefied Natural Gas plant (Agip A100, Buattifel,

Jalu, Libya, SPLAJ)

A Liquefied Natural Gas plant for AGIP - A - 100

Job Description as: Construction Supervisor E&I:

(Same above mention)

Jan. 1991 to Oct.1992 Mis. Or. Const'n & Maint'n Corp.(Jasaan, Mis. Or.

Phil.)

Position Electrical & Instrument Technician

Project Operation & Maintenance for Pilipinas Kao Inc. (Jasaan, Mis.

Or. Phil.)

Job Description for Electrical / Instrument Technician:

Reporting to Construction Manager and responsible for the following:

Maintained, Calibration, Service, Troubleshooting and repair of all process

instruments, motors and other related electrical and instrumentation

equipment. (PI, TI, FI, LI, PT, TT, FT, LT, PIC, TIC, FIC, LIC). Performed

Preventive Maintenance to all motors and controllers, lights and switches,

instruments and communication facilities. Motor wiring/rewiring and

troubleshooting. Complies with the existing NEC codes and carryout an

effective industrial safety program. Act as custodian to all company

properties may assign to.

Instrument/Equipment used: Smart, Honeywell, Hitachi, and Yokogawa

Sept. 1981 to Dec. 1990 Pilipinas Kao Inc. (PKI) (Jasaan, Mis. Or.,

Philippines)

Position Electrical & Instrument Technician

Project Operation and Maintenance (Jasaan, Mis. Or.,

Philippines)

Job Description as: Electrical & Instrument Technician:

Reporting to Construction Manager and responsible for the following:

Maintained, Calibration, Service, Troubleshooting and repair of all process

instruments, motors and other related electrical and instrumentation

equipment. (PI, TI, FI, LI, PT, TT, FT, LT, PIC, TIC, FIC, LIC). Performed

Preventive Maintenance to all motors and controllers, lights and switches,

instruments and communication facilities. Motor wiring/rewiring and

troubleshooting. Complies with the existing NEC codes and carryout an

effective industrial safety program. Act as custodian to all company

properties may assign to.

Instrument/Equipment used: Smart, Honeywell, Hitachi, and Yokogawa

PERSONAL DETAILS

Name: Vidal Inguito Villas, Jr.

Born: 03 January 1961

Telephone: +994-**-***-**** Mobile, Baku, Azerbaijan

+63-917-***-**** (wife) Mobile, Philippines

E-mail: abzcxf@r.postjobfree.com

Education

UM - University of Mindanao, Davao City, Philippines (1976

- 1981)

BSIE-Bachelor of Science in Industrial Engineering

Completed five (5) years course on BSIE

Skills

. Ability to work under pressure.

. Analytical skill.

. Good observation skill.

. Team leadership.

. Excellent communication skill.

. Good interpersonal skill.

. Excellent coordination skill.

. Report writing skill.

. Knowledge of computer.

Defensive Driving (Professional Drivers License, Phil.) Restriction / codes

1,2,3,8.

Abu Dhabi (UAE) Driving License # 726904

Associations

SOCIETY MEMBERSHIP:

Philippine Instrument and Control Society (PICS), Member

References;

Name; Alexander Wylie

Position; MC Manager

Contact No.; +994 (050-***-****

Email address; abzcxf@r.postjobfree.com

Name; Slim Ayadi

Position; Project Manager - Industry & Facilities

Contact No.; +971 (050-***-****

Email address; abzcxf@r.postjobfree.com

Name; Yousef Aquino

Position; QA/QC Manager

Contact No.; +966 (055-***-****

Email address; abzcxf@r.postjobfree.com