Present Position : Country Head and Engineer cum Engineer's
Representative
1. Name of Firm : LOUIS BERGER, UK
2. Name of Staff : Durvesh Kumar
3. Date of Birth : 26th July 1967 Nationality : Indian
4. Education:
. Bachelor of Engineering (Civil) from MMM Engineering College,
Gorakhpur, Gorakhpur University in 1991
. Pursuing in M Tech (Geo Tech. Engg)
. Bachelor of Laws (LLB), from NAS College, Meerut, CCS University,
Meerut in 1997
5. Membership of Professional Societies:
. Member, Indian Roads Congress
Registered Chartered Engineer of the Engineering Institute of Zambia
Member of the Engineering Institute of Zambia
Registered Engineer,, Engineer's Registration Board, Tanzania.
Member Institution of Engineers, Tanzania
Registered Team leader/Engineer for the construction supervision of
the "Community Upgrading Infrastructure and Storm Drainage in Kumasi"
project, in Kumasi, Ghana.
Approved work permit of Sr. Project Manager for Saudi Arab with
ABDULALI AL- AJMI CO
6. Other Training:
. Training on "Quality Control Procedures for Highway Projects",
conducted by NITHE.
. Attended short term training course on "Safety Measures in Highway
Construction", conducted by NITHE.
. Training on "International Seminar on Highway Safety Management &
Devices
. Training on "Materials Testing, Quality Control and Assurance",
organized by Madhya Pradesh Rural Road Development Authority
. Training of Flexible and Rigid Pavement (Design construction and
Quality control) at CRRI, New Delhi
7. Countries of Work Experience:
. India, Ethiopia, Tanzania, Ghana, Zambia (East, West, South Africa)
9 Languages:
Speak Read Write
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
10.Employment Record:
From March 2012 : till date
Employer : LOUIS BERGER, UK
Position Held : Country Head/Engineer and Engineer's Rep/Team leader
From August 2011 : March 2012
Employer : SMEC INTERNATIONAL PTY LTD, AUSTRALIA
Position Held : Project Director/Resident engineer
From Dec 2010 : July 2011
Employer : LOUIS BERGER,UK
Position Held : Team leader/Resident engineer
From July 2008 : Dec 2010
Employer : LEA International Ltd.,
Position Held : Team leader
From September 2007 : To June 2008
Employer : BECA International Consultants Ltd. in association with
C.E.S (I) Pvt. Ltd.
Position Held : Resident Engineer
From September 2006 : To August 2007
Employer : Halcrow Group Ltd., UK in association with C.E.S (I) Pvt.
Ltd. and STUP Consultants Pvt. Ltd.
Position Held : Resident Engineer
From January 2005 : To Sept 2006
Employer : C.E.S (I) Pvt. Ltd.
Position Held : Senior Resident Engineer
From March 2003 : To January 2005
Employer : C.E.S (I) Pvt. Ltd
Position Held Road Construction cum Quality Assurance
Engineer
From Nov 2000 : To Feb 2003
Employer : BCEOM, Societe Francaise D'ingenierie, France in
association with C.E.S (I) Pvt. Ltd
Position Held : Asst. Resident Engineer
From 1994 : To 2000,Oct
Employer : Larsan & Tubro Limited - Ecc Construction Group
Position Held : Project Engineer/ Project Manager
From 1991, June : To 1994,Feb
Employer : Bridge & Roof Company (India) Ltd. (A Govt. of India
Enterprise)
Position Held : Highway engineer,,Site Engineer
Key Qualifications:
Mr. Durvesh Kumar holds Graduate degree with overall 22 years of experience
in Civil Engineering and also in planning and execution of civil
engineering works covering roads and highways, bridges, CD works etc. His
spectrum of expertise includes construction supervision, maintenance
supervision, detailed design, design review, contract management, project
management, Quality Assurance of construction of roads and flexible
pavement overlay design, progress monitoring, quantity estimation, tender
document preparation, technical specification preparation, preparation of
interim payment certificates, preparation of variation statement,
certification of completed works, preparation of reports including Project
Completion Reports. Mr. Durvesh Kumar has vast experience in the field of
Contract Management, Developing and Maintaining Project Information System,
Budgeting, settlement of claims, arbitration, preparation of variation
items, approving claims for extra items, EOT applications etc
He has also experience in execution of highway and bridge projects
including quality control of flexible and rigid pavements and other
concrete structures involving large quantity of earthwork/concrete. He is
well versed with ICB and administered Highway Projects under FIDIC
conditions of contract and IS, IRC and MORTH specifications, contract
procedures, modern construction methodologies, machinery and equipment. He
has handled a number of major road/ highway construction supervision and
project preparation projects involving 4/6 laning costing more than INR
2000 Million and length more than 50 km under ICB norms and FIDIC
Conditions of Contract in the capacity of Team Leader/ Project Manager. He
also has knowledge of project management techniques such as CPM/PERT, time
distance chart etc. and knowledge of MS Project, Primavera software as
well.
Additional Responsibility assigned by company . ( AFRICA);
As Country Manager(9 Projects) main
tasks and accountabilities were Establishing an appropriate, integrated
organizational project structure. Defining roles, responsibilities and
authorities to project teams and partners to ensure project completion in a
safe manner, within budget, on schedule, and in conformance with the
appropriate standards, specifications and applicable regulatory
requirements to meet the clients' needs. I was managing good relationship
with clients and local authorities, Preparing and attending progress
meetings with clients and/or representatives and safeguarding project
complementation on time, within budget and in accordance with contract
specifications. Establishing work plan and staffing for each phase of the
project, and is responsible for recruitment or assignment of project
personnel. I was monitoring and controlling all contractual commitments to
ensure that all work is being performed in accordance with the
specifications and terms of the contract and facilitating with the project
team the development, communication, implementation, update and continual
use of the project plan.
Facilitate co-ordination and communication between the different
departments. Assist in the development of strategic plans for operational
activity. Implement and manage operational plans. Excellent Client facing
skills is required.
Ability to review and implement business processes and procedures with a
constant focus on improvement
Manage all contracts managers and site personal Reviewing, evaluating and
understanding the requirements of identified projects.
- Managing the contributions of others supporting the bid to ensure timely
delivery of best quality responses.
- Providing a link between the estimators and technical /delivery team,
ensuring tender documents are understood and responded to correctly.
- Keeping pace with the developments and changes of the company, to ensure
that submissions continually improve.
involve the organisation, management and delivery of PQQ`s, bids and tender
returns take full responsibility for devising and implementing the business
expansion strategy. This will be achieved by the promotion of the company
and its capabilities to the target market, ensuring participation on tender
lists, and maintaining and developing a network of contacts which will give
CPS advantage in terms of market intelligence and knowledge of future
requirements. administration of tender documents
. Proof reading tender applications info for Pre Qualification
Questionnaires support a Bid Manager in the submittals of tender documents
A strongly developed sense of self motivation.
Proven ability to develop and maintain client relationships.
Commercial awareness
Ability to integrate into a multi disciplinary management team
11. Detailed Tasks 12. Work Undertaken that Best Illustrates
Assigned Capability to Handle the Tasks Assigned
Project Initiation Name of assignment or project ?"Consultancy
Sufficiency of Design, Services for the Detailed Engineering Design and
Drawings, Technical Construction Supervision of Eastern Corridor Road
Specification, BOQ and Project, Ghana, West Africa.
Contract
Shifting and Relocation EDF financed road project, Dodo
of Utilities Pepesu-Breweniase (16.20 km) and Breweniase-
Review of the Nkwanta (town northen exit) 31.25 km, the total
Contractors' Work distance being 47.45 km.
Programme and Resources
Including Equipment Year: March 2012 to till date
Initial Verification of Location: GHANA, WEST AFRICA.
Contractor's Insurance/ Client: Government of Ghana represented by Ghana
Guarantees Highway Authority
Environment Main project features: Final Engineering Design
Protection/Management and Preparation of tender dossier for works.
Plan Assistance to the Contracting Authority during
Assignment of the works tendering process.
Responsibilities to Works Construction Supervision.
Supervising Staff Funded by; European Development fund
Issue of Drawings, Positions held: Country Head and Engineer cum
Documents & Information Engineer's Representative
Trial Stretch Run Description of duties: Same as mentioned below
Regular Verification of for the Engineer and Engineer's Rep
Contractor's
Insurance/Guarantees Name of assignment or project ?"Consultancy
forms Values &Validity Services for the Design and supervision of the
Routine Inspections Upgrading of Second Urban Environmental
Arrange Joint Site Sanitation Project UESPII
Inspections with the AFD Credit No. CGH6006 01 J
Employer Contract for Community Infrastructure Upgrading
Daily Diaries and Records (14no.Roads) and
of all Site Activities Aboabo Storm Drainage Improvement Works in
Detailed Records of Kumasi, Ghana, West Africa
Contractor's Equipment at
Site Location: GHANA, WEST AFRICA.
Review of Contractors' Client: Government of Ghana represented by Kumasi
Work Programme and Metropolitan Assembly
Associated Work Method Main project features: Design and Construction
Statements Supervision
Progress Monitoring Positions held: Country Head and Engineer cum
HIV/AIDS Policy/Strategy Engineer's Representative
and Follow up and Other Description of duties: Same as mentioned below
Environment/Safety for the Engineer and Engineer's Rep
Related Issues
Review the Contractors Name of assignment or project ?"Consultancy
Proposed Working Services for supervision of the Upgrading of
Drawings, Plans and KOROGWE-HANDENI-MAKATA ROAD TO BITUMEN STANDARD;
Associated Calculations LOT1; HANDENI-MAKATA SECTION(54 KM) LOT 2;
Review and Check KOROGWE-HANDENI SECTION(65 KM) " Contract no
Contractors Payment TRD/HQ/1026/2009/10,Dated 22 April 2010
Applications and Monitor
the Payment Process Year: August2011 to March 2012
Monitor the Payment Location: TANZANIA, EAST AFRICA.
Process Client: TANZANIA NATIONAL ROADS
Analyses and Make AGENCY,(TANROADS),MINISTRY OF INFRASTRUCTURE
Recommendations on DEVELOPMENT,THE UNITED REPUBLIC OF TANZANI
Contractor's Extension of Main project features: Construction Supervision
Time & Claims Positions held: Project Director cum Resident
Ensure Proper Handing engineer
over of Materials, Description of duties:
Equipment and Facilities As Engineer responsible for project management
Training to client Staff and construction supervision of the project
Carry out Traffic Counts including approval of Contractor's key
Progress /Reports superintendent personnel, construction
Submission of Post mobilization programs, approve the contractor's
Construction as Built work program including activity scheduling and
Drawings resource programming, Review of design, drawings,
Submission of Design specifications, BOQ and modifications required to
Records, Quality Control suit prevailing site conditions, Verification/
Programs and Testing issue of construction schedules, working drawings
Records and monitor the progress of work; Preparation of
Record of Correspondence modifications, additional drawings, reports
Supervision During Defect scrutiny of contractor's bill; Issuing
Liability Period certificates to Client for payments,
Contract Completion scrutiny/preparation of variation orders and
Report recommendation to client for approval;
Consultancy Completion Scrutiny/preparation of completion reports, as
Report built drawings, supervision of road maintenance,
settlement of disputes,
scrutinizing/certification of claims and final
bills and all other allied works; Review of
contractor's detailed works program, sources of
borrow and other material quarries and suggest
modifications wherever required; Results/
certificates of construction materials and
undertake additional tests as necessary to
establish their quality and conformance to
Contract Specifications; Assuring Quality
Assurance and Quality Control during
construction; Supervised bituminous/concrete
works, mix designs, laying methods etc. and
periodical/ special review of mix designs,
compaction criteria etc., give the order to
commence the work, ensure that the construction
works are in accordance with the technical
specifications, Environmental Management Plan and
other stipulation of construction contract
documents and the construction methods proposed
by the contractor are in compliance with the
above stipulations particularly, in relation to
Contractor's construction equipment and other
resource deployment, ensure a system of Quality
Assurance of works, approve materials and sources
of materials, review all concrete/bituminous mix
designs proposed by the contractor and
approve/suggest modifications in the mix design,
laying methods, sampling and testing procedure
and Quality Control measures to ensure required
standard and consistency in quality, order
special tests of materials, order removal and
substitution of improper materials and/or works
as required, ensure that all measurements and
calculations are carried at the frequencies
specified in the contract documents, control and
appraise the progress of the works, monitor and
check the day to day quality control and quantity
measurements of the works carried out, direct the
Contractor in all matters concerning construction
safety and care of the works, issue interim
certificates for monthly payments to the
contractors, to verify and correct the as built
drawings supplied by the Contractor.
Dec 2010-July2011 LOUIS BERGER,UK
o Team Leader cum Resident Engineer (Engineer and
Engineer's Representative)
Name of assignment or project;
.Detailed Engineering Design and Construction
Supervision for 4-Laning of the Rehabilitation of
Kumasi-Techiman Road_to National trank road
standard Section of Scope Design and
construction, length _73.15 Km__ km, lane _4,
funded by European develpment fund_Accounting
no.7 ACP GH 040 AND 9ACP.GH.15/1 CONTRACT
NO.GHA/HO/TRC/4/2010
in the State of Ashanti region of GHANA, AFRICA
under National Highways Development Programme,
FIDIC Conditions, Bituminous Standard, Length:
73.15 km, Project Cost: USD _80.739
million, Client: Ghana Highway Authority Ghana.,
Govt. of Ghana, Dec 2010-July 2011
. As Resident Engineer cum Team Leader,
Responsible for Design Review and Construction
Supervision, administer the Contract Execution,
Contract Administration/ Management as per FIDIC
Conditions, checking setting out of the project;
order, supervise / perform tests on materials /
work and approve / disapprove the contractor's
plant and equipment monitoring the progress of
works for the implementation of project through
computer aided project management technique and
Management Information System (MIS);
review/approve the working drawings prepared by
the Contractor, regular supervision of works in
accordance with the specifications, issuance of
Working Drawings, environmental management plan
and other stipulations of the construction
contract; ensure the control of the construction
process; monitor Contractor's operations
including adherence to safety and environmental
requirements; maintenance of Project Diary;
reviewing Contractors' work programmes and
performance of Contractors' plant, equipment and
machinery; strictly monitor the progress of work
for timely completion of the project; issue site
instructions; preparation of Variation Orders;
developing Quality Assurance Manual, Quality
Control of Works; check contractor's accounts,
invoices and other statements; preparing reports;
Final Inspection of Works; training to client
staff, Verification of Contractors' Statements of
Completion; Compilation and verification of
"As-Built Drawings", etc. He was overall
responsible for all Technical and Administrative
aspects of the project
Name of assignment or project: Construction works
of Adigrat-Adwa-Shire Road Upgrading Project,
Contract No.1: Shire to Adi Abun-length: 91.8km,
funded by International Development Association
(World Bank), under Ethiopian Roads Authority;
Project Bidding Cost: ETB 728,988,368.78.
Project route characteristic two distinct
physiographic feature, plane to rolling in west,
and hilly mountainous terrain in the east with
seven bridges, 250 box culverts, 24 pipe
culverts, and rehabilitation of existing
culverts.
Year: July 2008 to Dec 2010
Location: Amhara-Tigray National Regional State
of Ethiopia, Ethiopia
Client: Federal Democratic Republic of Ethiopia
(FDRE), entrusted Ethiopian Roads Authority
Main Project Features: Construction Supervision
Position Held: Team Leader cum Resident Engineer
(Engineer's Representative)
Activities performed:
As Resident Engineer cum Team Leader,
responsibilities included assign tasks /
responsibilities to team members, construction
supervision, contract management, review
sufficiency of design drawings, documents and
specifications, review contractor
mobilization, installations and Work
Program, administering the contract as per FIDIC
conditions, regular inspection and supervision,
review and certification of contractor's payment
certificates, advice on contract changes /
variations, analysis and recommendations on
contractor's claims, review traffic safety and
implementation of approved Environment Management
Plan, approve/monitor of project safety
compliance, on-job training to selected staff of
the client, organizing review meetings and
site visits, permanent record of documentation
and correspondences, maintain site dairies etc.
Guiding the contractor in preparation of resource
based Master Works plan, reviewing and approving
the same, checking the preconstruction activities
and contractors' preparedness to execute the
planned works. Monitoring the progress with
respect to the planning and checking the quality
of Work. Assessing the problems and bottlenecks
and advising contractor on necessary controls for
improving progress and quality of Works. Being
a Team Head apart from his technical
responsibilities he is equally responsible
for all administration aspects, also responsible
for detailed design of Highway works & Structural
works, lead a team and carried out the
Reconnaissance Survey, checking of ground Survey
Data, selection of Alignment, Detailed Physical
Survey, Detailed Engineering Design Alignment,
Design of Furniture & Fixtures etc and
responsible for administer the Contract
Execution, Contract Administration/ Management
as per FIDIC Conditions, checking setting out of
the project; order, supervise / perform tests on
materials / work and approve / disapprove the
contractor's plant and equipment monitoring the
progress of works for the implementation of
project through computer aided project
management technique and Management Information
System (MIS); review/approve the working drawings
prepared by the Contractor, regular supervision
of works in accordance with the specifications,
issuance of Working Drawings, environmental
management plan and other stipulations of the
construction contract; ensure the control of the
construction process; monitor Contractor's
operations including adherence to safety and
environmental requirements; maintenance of
Project Diary; reviewing Contractors' work
programmes and performance of Contractors'
plant, equipment and machinery; strictly monitor
the progress of work for timely completion of the
project; issue site instructions; preparation of
Variation Orders; developing Quality Assurance
Manual, Quality Control of Works; check
contractor's accounts, invoices and other
statements; preparing reports; Final Inspection
of Works; training to client staff,
Verification of Contractors' Statements of
Completion; Compilation and verification of
"As-Built Drawings", etc. He was
overall responsible for all Technical and
Administrative aspects of the project.
Name of assignment or project: Four Laning and
Strengthening of the Existing Two Lane Section
from Km. 470+000 to Km. 38+000 on National
Highway-2 (World Bank Funded GTRIP Project.,
Construction Package II-B) Kanpur (U.P.).
Year: September 2007 to June 2008
Location: Uttar Pradesh, India
Client: National Highways Authority of India
Main project features: Construction Supervision
Positions held: Resident Engineer
Activities performed: As Resident Engineer
responsible for guiding technical team
Comprising experts in various fields of
engineering for Construction, Supervision &
Project management. His services inter-alia
include reviewing design of geometric flexible
pavement and drainage, preparation of drawing for
construction purposes, construction methodology,
work programme of the contractor, deployment and
proper utilization of men &machinery, quality
control management. Also responsible for overall
management of the project including day-today
construction supervision monitoring of projects,
assurance of quality, planning programming of
work schedule & procurement of materials and its
utilization, certificate of contractor's bills of
claims, disputes, extension of time, variation
order and other contractual matters following
FIDIC guidelines. Keeping liaison with client,
conducting meeting with Contractor & client for
review of progress and other matters
Name of assignment or project: Feasibility study
and preparation of detailed feasibility Report
for work " Construction of High level Bridge
across river Krishna with approaches connecting
Kollapur in Mahabub Nagar district and
Siddeswaram in Kurnool district under annuity
scheme including transaction advisory services
for procurement of contract"
Client: A.P State Bridge & Road Department,
(A.P), India
Year: July 2007 to Sept 2007
Positions held: Team Leader
Location: Andhra Pradesh, India
Main project features: Feasibility study and
preparation of detailed feasibility Report
Name of assignment or project: West Bengal
Corridor Development Project (ADB Loan No.
1870-IDA), Contract Package-D & F, Contract
Package - D involves Improvement of Gazole (km
0+000) - Hilli (km 97+428) with a link SH-10 from
Patiram to Balurghat road, and Contract Package F
involves improvement of Durgapur - Kunarghat
Road; Malda - Bulbul Chandi Road and Gour -
Mahadipur Road.
Year: September 2006 to July 07
Location: West Bengal, India
Client: Public Works Department, West Bengal,
India
Main project features: Construction Supervision
Positions held: Resident Engineer
Activities performed: As Resident Engineer,
responsible for guiding technical team Comprising
experts in various fields of engineering for
Construction, Supervision & Project management.
His services inter-alia include reviewing design
of geometric flexible pavement and drainage,
preparation of drawing for construction purposes,
construction methodology, work programme of
the contractor, deployment and proper
utilization of men & machinery, quality control
management. Also responsible for overall
management of the project including day-today
construction supervision monitoring of projects,
assurance of quality, planning programming of
work schedule & procurement of materials and its
utilization, certificate of contractor's bills of
claims, disputes, extension of time, variation
order and other contractual matters following
FIDIC guidelines, keeping liaison with client,
conducting meeting with Contractor & client for
review of progress and other matters, preparation
of reports, checking insurance and guarantees of
the contractor. Providing "on the job Training"
to Client's staff.
Also responsible for rehabilitation & maintenance
of existing Road section including measures for
mitigation of pavement distresses such as
patches, potholes, cracked pavements; profile
corrective course, binder course and wearing
course for the rehabilitation and maintenance of
the existing bituminous road.
payment certificate against mobilization,
approved the contractor's work methodology,
prepared Quality Assurance Plan & Quality Control
Procedure, delegated the duties and the
authorities to the sub-ordinate staff, inspected
and supervised the day-to-day construction work,
approved the working drawings and the shop
drawings, issued the advance payment certificate
against Plant and Equipment, issued the site
instructions to the contractor, assisted the
contractor in negotiations with the stakeholders
for shifting of utilities and preparing the
mitigation plans, held regular meetings with the
Contractor and the client, assisted the
contractor in technical matters, issued the
interim payment certificates to the client for
the Contractors monthly payments, maintained
daily diary and prepared monthly progress report
of the project. Did contract management, project
management etc for the project.
Name of assignment or project: Improvement to
Nagpur- Mumbai Road Project (NSGN, MSRDC Road
Project) to National Highway Standard Road
Package VII Section - Improvement to Karanaja -
Malegaon Road including Tarala - Shelu Bazar &
Malegaon By pass (Length 78 km), includes 17 no.
of bridges, one major bridge in addition to box /
pipe culvert along the road.
Year: January 2005 to September 2006
Location: Maharashtra, India
Client: MSRDC, Govt. of Maharashtra, India
Main project features: Construction Supervision
Positions held: Senior Resident Engineer
Activities performed: responsible for overall
management of the project including day-today
construction supervision monitoring of projects,
assurance of quality, planning programming of
work schedule & procurement of materials and its
utilization, certificate of contractor's bills of
claims, disputes, extension of time, variation
order and other contractual matters following
FIDIC guidelines, keeping liaison with client,
conducting meeting with Contractor & client for
review of progress and other matters, preparation
of reports, checking insurance and guarantees of
the contractor, Undertaken for review of the
detailed design and recommending necessary
changes including finalization of new alignment
and modifications, examination and certification
of the construction drawings, monitoring and
inspection of the contractors setup, laboratory
and construction machinery & equipment,
monitoring and certification of progress,
preparation of weekly and monthly progress
report, coordination and monitoring of the works
of other experts working for the consultancy
services in the project for the sectors of
Highway Engineering, Pavement Engineering,
Material Engineering, Environmental Engineering,
etc. implementation of civil work contracts,
Approving
Contractor's work program, method statement,
material sources etc, Preparing and issuing
Reports as per defined subsequently; Approving
and issuing working drawings, setting out of the
works and instructing the contractor's,
Scrutinized the contractor's work programme and
construction method, maintained quality assurance
system of Contractor, review the test results
/certificates of all construction materials and
sources of materials other work involved checking
measurements. Certifying work volume and issuing
interim payment certificate, maintaining records,
correspondence, diaries, consolidated project
accounts and preparing financial statements etc.
The Project was executed on FIDIC Condition of
Contract.
Name of assignment or project: Detailed
Engineering design and Construction Supervision
of Delhi - Gurgaon Section of NH-8 into Access
Controlled Six / Eight lane Expressway (BOT
Project),Bituminous Road, Haryana, India,
Project length: 27 km, 6/8 lane, PPP Project on
BOT Basis, Project cost: INR 850 Crore. Client:
M/s Jaypee - DSC (JV)
Year: May 2003 to Jan 2005
Location: Haryana, India
Client: M/s Jaypee - DSC (JV)
Main project features: Construction Supervision
Positions held: Resident Engineer
Activities performed:
As Resident Engineer, was responsible responsible
for preparation of detailed engineering
design for the proposed expressway. The
major tasks included were: co-ordination of
the various activities of the project, like
survey, investigation and analysis, preparation
of detailed design for expressway, structures,
crossroads, junctions, roadside amenities and
facilities and estimation of quantities
(including rate analysis), preparation of designs
and drawings, liaisoning with Client etc and for
supervision of road formation in cutting &
embankment, sub grades, granular sub base course,
base course, water bound macadam, bitumen
concrete & asphalt concrete, construction of
multi cell RCC culvert, RCC retaining walls. Was
also responsible for review of detailed
engineering