Post Job Free
Sign in

Engineer Construction

Location:
Houston, TX, 77082
Posted:
July 02, 2013

Contact this candidate

Resume:

Julio V. Ybarra

**** *. ***** ***** **.

Houston, TX 77082-3608

281-***-**** - Hm

281-***-**** - Cell (abz78d@r.postjobfree.com)

(abz78d@r.postjobfree.com )

To Whom It May Concern:

I am a person with multiple craft industrial experiences, more then 35 years plus, as industrial craft

superintendent in various jobs overseas in management with USA major Design Companies. My

positions were: New Construction Superintendent of Pipe, Welding, Instrumentation and Principle

Construction Engineer, General Superintendent, Project Superintendent, Startup Supervisor,

Construction Manager, Welding Inspectors, Pipe line, Monitoring Fabrication Vendor Shops, Oil

Storage Tank Farms, 5 Oil Ports, Field Engineer, Engineer Coordinator and Off Shore Platforms

Welding Inspector,

Also in the copper mine new construction erection ball mills, concentrators, crusher, thickeners,

pump house and fiber glass scrubber, conveyers, plus all field erection in general.

In Yanbu, Saudi Arabia, we had 132 sub-contractors. I supervised the contractors that had pipe

welding, fabrication welding shops, and N.D.T. work. The new construction covered pipeline, heat

recovery boilers, energy plants, under ground service lines, 5 oil ports, oil storage tanks, sulfur

plant, water treatment plant and other heavy work. I worked in the director’s office, report and

coordinated directly to the director of construction only. This was a $28 billion dollar project.

I feel I have much more to offer to your company, I would like to discuss your company needs and

my qualification.

NOTE: I was construction and maintenance general manager for two years of three housing

projects one was a high rise apartment all of the three consisted of 740 units.

I remain sincerely,

Julio V. Ybarra

1 of 5

Julio V. Ybarra 281-***-**** Hm

3411 S. Briar Knoll Drive 281-***-****

Houston, TX 77082-3608 abz78d@r.postjobfree.com

abz78d@r.postjobfree.com

• Thirty five years multiple crafts Experiences in the industrial construction, Superintendent, General

Superintendent, Project Superintendent, Construction Manager, Superintendent Pipe, Welding and

Instrumentation, welding inspector, monitoring fabrication vendor shops, field engineer of pipe technical

assistance, engineer coordinator, startup engineer; Also copper mine various projects.

• In Saudi Arabia we had 132 sub contractors I supervise the contractors that had pipe welding shops, oil

ports welding, oil storage tank farms and NDT work.

• The new construction covered pipeline, heat recovery boilers, 5 oil ports, oil storage tanks, sulfur plant,

water treatment plant, energy plants, plus underground service lines in various sites. I worked in the

director’s office, reported and co-ordinate

• Directly to the director of construction only. This was a $28 billion dollar project.

SUMMARY ASSIGNMENTS:

• Escuintla, Guatemala May 2011 to July 30, 2011

AICSA-Dymel SA (A/D) Joint Venture Duke Energy Int’l ( DEI ) B&W Boilers

General Superintendent pipe erection and test completion 6/six week assignment.

• Washington Group International/URS June 2008 to 2009

Holcim Cement Plant Bloomsdale, Missouri

General Superintendent Pipe dept. I had 4/four pipe superintendent under me

In new construction. RFI Tech Engineer of pipe field erections construction.

• AkerKvaerner, Aguas Tinidas, Spain Jan 2008 to May 2008

• Supervisor Piping Department – Coordinator with pipe isometric design engineers

Sevilla, Spain and monitoring 3 pipe welding fabrication shops and field erections

I had 2/two pipe superintendent that assists me on pipe field erection.

• Akerkvaerner: Philly Shipyard Inc. Philadelphia, PA. July 2007/Dec 2008

Supervised Norway craft and local Union craft workers building new oil ship vessel.

• Miami, Arizona BHP Copper Mine Project May 2007/July 07

• Supervisor – For various crafts in the re-startup BHP Copper Mine Project.

Supervised the re-startup of ball mills, flotation cells.

Ybarra’s Industrial Construction, Consulting & Inspection Apr 2006/May 06

Working on contract assignment. Engineer Alamos Sonora, Mexico

• Fluor Daniel, Jose Venezuela (Ameriven Crude Oil, June 2002/04

Upgrade project)

• General Superintendent: Tail Gas and Sulfur Recovery Plant

In charge of all sub-constructors Area 30, six units supervising the sub-contractors,

pipe welding and mechanical erections work that was being done per design codes.

2 of 5

Kvaerner, El Paso Energy Merchant Power Plant, Sept 2001/02

Macae, Brazil

• General Piping Superintendent

In charge of all pipe erection of 16 turbines, underground utilities and all pipe rack

service lines and fabrication shops.

• Ybarra’s Construction & Consulting Aug 2001/Sept 01

Argentine, Loma Negra Gas Plant Modular.

Inspector and monitoring 15 vender’s fabrication shops.

• Kvaerner, Deir Ez Zor, Syria Conoco Gas Plant Oct 2000/Mar 01

• General Superintendent Pipe Dept.

In charge of fabrication shop, pipe erection in 8 areas, 5 pipe racks, which consist

of more than 37,240 welds.

• Fluor, Petróleos De Venezuela, S.A., Sweeney TX Nov 99/Aug 2000

• Construction Manager – Phillips 66 Refinery – Two Oil Port terminals, Jones Creek and Freeport

Terminal Supervised sub-contractors for the expansion of the two oil terminals. Pipeline stopples, pig

launcher and pig receiver, 6 each 20” transfer pumps and related pipe for oil storage tank farms, Monitor

electrical sub contractor on the installation of sub station for the control room.

• C.S.I., Barranaquilla, Colombia, Termbarranquilla Sept 99/Nov 99

Energy Project (TEBAS)

• Manager – Boiler repairs in charge of all the repairs of a 70 MW boiler, repairs

that blew-up/exploded from tube panels and ducts expansion joints, wind box

burners, brick refractory internal and external walls, support hangers steam

mainlines and welding procedure also QA/QC inspection.

• Fluor, Cuajone, Peru, Southern Peru Copper Mine Mar 1998/Nov 98

• Project Superintendent – 2 nd shift.

Night shift in charge of all new construction erections, welding fabrication

Shops and all construction in general, from floatation areas, ball mills,

Crusher, concentrator, thickeners, and pump house.

My crew varied from 300 men or more per night, depending on the workload.

• Kvaerner Metals, Ilo, Peru, Southern Peru Copper Sept 1997/Mar 98

Acid Plant & Acid Storage Tanks and Port Railroad Loading Racks.

• Superintendent Pipe Dept. – 2 nd shift.

Fabrication shop, carbon steel pipe, fiberglass pipe, mechanical &

construction field erection also managed the safety and QA/QC personnel.

• Kvaerner Metals, Stoney Creek, Virginia Old Hickory Apr 1997/Sept 97 Mineral Plant

• Superintendent Pipe Dept.

Of high density polyethylene (H.D.P.E.) pipe installation from the river to the

mineral field and plant ponds in charge of carbon steel pipe fabrication and pipe

erection.

3 of 5

.

• Corporacion Industrial Palmer, Mexico 1984/1996

• Owner/Manager

Industrial Mining Corporation.

• Parsons Limited, Yanbu, Saudi Arabia (Aramco projects) 1980/1983

• Reported directly to Project Director

Superintendent and Principle Engineer of Vetco and S.G.S., N.D.T. Labs of

Qualifying welders for cross country pipeline, oil storage tank farm, energy plants

Heat recovery boilers, oil ports, sanitary waste treatment plant, water treatment

Plant, desalinization plant and underground waste and fire water lines, in accordance

with applicable welding codes: AWS-D1-1, API 1104, API 650, 31.1, 31.3, 31.4 &

Sec VIII boiler and pressure vessel codes, ASME SEC IX welder’s qualifications.

• Saudi Arabia Parsons Limited, Shedgum, Saudi Arabia 1979/1980

Aramco Sulfur Plant Project:

• Superintendent of pipe and instrumentation field erections.

New construction in the utility and sulfur unit areas.

• Fluor Ocean Services International, Greece & Italy 1979/1980

• Senior Welding Inspector “SGS” “NDT Inspection Company”

Offshore oil rig platform & modular welding inspector of new construction.

Duties consisted of visual inspection, film interpretation of production

welds, inspection of material defects and A.W.S. welding codes.

• Ralph M. Parsons Limited, Sar Sheshmeh, Iran 1977/1979

Sar Sheshmeh Copper Mine

• Superintendent of pipe, welding and instrumentation dept.

New construction, copper mine, concentrator, smelter and 16 Ball mills.

In charge of field new construction installations.

• Stone & Webster, Port Arthur, Texas 1976-1977

• Senior Welding Inspector – Texaco Refinery

Senior construction inspector of new construction.

Duties consisted of pipe and welding inspection applicable welding code

and procedures.

• Brown & Root Construction, Playas, New Mexico 1975-1976

Phelps Dodge Copper Smelter

• Instrument Foreman

Of new construction installation at the acid unit, tank farm and

Propane areas.

• Daniels Int’l Construction Corp, Belle Glade, Florida 1974-1975

Engineer Coordinator – Sugar Cane Grower Corp.

• Field Engineer Coordinator of new construction for the sugar mill expansion.

4 of 5

• E.M. Watkins Construction, Perry, Florida 1973-1974

Proctor & Gamble’s Buckeye Paper Mill

• Foreman/Isometric Inspector

Pipe fitter, pipe fitter foreman, and inspector of isometric drawings

In the sketching department

• Rhodes Management, Cornwell Heights, Pennsylvania 1972-1973

• Superintendent promoted to General Manager of 740 units

Of new apartment construction, sub contractors.

Plus, maintenance crews, office personnel of 740 units in three apartments.

• Brown & Root, Baytown, Texas, Mobay Chemical Plant 1972-1973

• Start up Supervisor Maintenance Department

Supervisor of instrument fitters, pipe fitters, millwright, electrical and

Maintenance crews for the start-up of the Mobay Chemical Plant.

Education

• High School Graduate

• Two Years Junior College

Professional Certificate

• American Inspection Society, Certificate 1615

• American Welding Society Member 1556

Languages

• English

• Spanish

Julio V. Ybarra June--- 2012

5 of 5

References available if needed:



Contact this candidate