Laith Frangoul
El Cajon, CA 92021
Contact Information :
Home: 619-***-****
Mobile: 619-***-****
Email: *****.********@*****.***
Objective:
Seeking a challenging career in the quality environment where my technical skills and qualifications as a MEP specialist
engineer in HVAC, Plumbing and Firefighting systems can be shared and enriched and make a significant contribution to
organization with strong work ethics and diligence.
Summary of skills:
• Extensive knowledge of Electro-Mechanical Systems (HVAC, Plumbing and Firefighting ) for more than nine
years in Design, Installation, Testing & commissioning
• Well versed in process and construction engineering as well as Process Safety Management process.
• Comprehensive knowledge of facility operations work procedures, pipeline and facilities engineering concepts.
• Proficient in communicating effectively with excellent troubleshooting and problem solving skills
• Deep knowledge to prepare the shop drawing through Auto CAD MEP (Drafting Software)
• Proven ability to resolve problems and complete projects in a timely manner.
• Familiarity with international standards (e.g. ASHRAE, ASTM, NFPA, ASME, ANSI, BS, etc.).
Educational Summary:
Master Degree in (Refrigeration & Air-Conditioning) M.Sc. awarded at 2001 at University Of Technology,
College of engineering Machines & Equipment Dept.
Bachelor’s Degree in Mechanical Engineering, B.Sc. awarded at 1998 at University Of Technology, College of
engineering Machines & Equipment Dept.
Successful completion course of LEED 201 : core concepts and strategies at 2010 through USGBC
Training course Certificate in Projects Claims Management & Disputes Resolution at 2008 by U.A.E society
of engineers.
Additional Skill :
Certificate for IT Essential :PC Hardware and Software by Cisco Networking Academy at 2013 USA
Practical Experience
Company: AMANA STEEL BUILDINGS & CONTRACTING ( DUBAI ) (April 2007 – December 2012)
Position: SENIOR MECHANICAL ENGINEER
Projects Handled:
Altayer Motors Showroom and workshop
First Gulf Bank in JabilAli
Extension of Caterpillar workshop
1
Fujairah Cable Landing Station for M/s. dU
1,000,000 TPY Rebar Mill for M/s. Hamriyah Steel at Hamriyah FZ, Sharjah, UAE
Construction of Warehouses for Ajman Free Zone at Ajman New Industrial Complex
Duties:
• HVAC (Heating, Ventilating and Air Conditioning):-
Heat Load Estimation by (HAP 4.2-Carrier), Equipment selection, Duct Design & Sizing (ASHRAE, BS, SMACNA, DW
144/142/141/171 etc), CHW Pipe Design & Sizing (BS, ASHRAE), ESP Calculation, Pump Head Calculation, Workshop
Drawing &, Materials, Fittings take off and Execution of Installation, Testing & Commissioning of Air Handling Unit with
Heat Recovery Wheel, Fan Coil Units, Ventilation Fans, Air Curtains, Package Unit, Chillers, CHW Pumps, BMS Control
and Control Valves etc..
• PLUMBING (Water Supply, Drainage and Storm water):-
Workshop Drawing and material submittal Preparation, Pump Head calculations, Pump, water Heater and sanitary items
selection, loading Unit Calculations & Pipe Sizing, Materials, Fittings and Valves quantity take off and Execution of
Installation, Testing and Commissioning of Water supply Pipeline, Drainage Pipe Line, Storm Water Pipeline, Water Tank,
Water Heater, Booster Pump, Transfer Pump, Sump Pump and controls etc.
• Fire Fighting (Sprinkler System, Hose reel and Clean ):-
Workshop Drawing Preparation, Pump Head calculation, Materials, Fittings & Valves quantity take off, Execution of
Installation, Testing & Commissioning of GI Pipeline, Sprinkler, Hose reel, Dry Risers, Wet Risers, Clean fire Suppression
Agent Systems & Fire Pumps (Diesel Pump, Jockey Pump & Electric motor Pump) as per Civil Defense Regulations &
NFPA standard )
Preparation of material submittals and Consultant approvals obtaining.
Preparation of program of work and it's updating and follow up
• Liaison with Consultant MEP supervisory Engineer, inspectors, and relevant staff.
• Directing, monitoring, and controlling the activities of MEP Subcontractors. Ensuring that work is carried out in
accordance with the required quality, Specification, time, cost constraints.
• Payment application preparation and obtaining its approvals with Consultant/Client.
Company: KARAM GROUP FOR GENERAL CONSTRUCTION IN U.A.E (MAY 2006 - April 2007 )
Position: MEP DESIGNER ENGINEER
Projects:
((Council Of Consultant, Dental clinic /AT sharjah university, Alawqaf building 2B+G+12, Classic show room ))
Duties:
• Design and Preparation of workshop drawings and Consultant approvals obtaining.
• Preparation of material submittals and Consultant approvals obtaining.
• Pricing and ordering the materials.
• Preparation of program of work and it's updating and follow up.
• Progress of works monitoring and reporting.
• Attending technical meetings.
• Preparation of site correspondence.
• Coordination with Subcontractor &Consultant/Client.
• Variation preparation obtaining its approvals with Consultant/Client .
• Follow up with Authorities and commissioning supervision .
• Snagging and desnagging monitoring.
• Hand over to Consultant/Client.
2
Company: SOUTHEAST TEXAS FOR INDUSTRIAL SERVICES IN IRAQ ( October 2004- MAY 2006)
Project : New (10) GE LM6000 Gas Turbine/generator Electrical Power Plant.
Position : SITE ENGINEER
Duties:
In October 2004 I accepted a position as equipment installation & alignment specialist engineer with Southeast Texas for
Industrial Services at the Al Musaiyib Project, Al Musaiyib, Iraq, a new (10) GE LM6000 gas turbine/generator electrical
power plant. My goal while here is to advance my understanding of electrical power generation and industrial construction
AlATIFF COMPANY IRAQ ( January 2003- October 2004 )
Alatiff Company for general air conditioning construction, installation of large tonnage Air-conditioning units such as:
package units, multi power system and chilled water systems.
Position : HVAC Engineer
Duties:
Designing layouts for ducting & piping systems for water chillers & central units.
Estimation of thermal loads by using carrier software for design and using heat load
calculation.
Selection the accurate method of cooling System to reduce the power consumption.
Al-HAYAT FACTORY IRAQ (October 1999-October 2002 )
Position: MAINTENANCE ENGINEER
Duties:
• I was responsible for all plant operations, which included production, marketing and the maintenance of the factory’s
equipment such as: vacuum system, batch mixing appliances, electrical maintenance and the air conditioning system.
The title of my thesis which was submitted to the Machines & Equipment Department was {Comparison of Adiabatic &
Daibatic flow for R-12 & R-134a in the Capillary Tube for Refrigeration instrument}.
I published a research in “Engineer Magazine” in 2002 under the title of: Study of two phase flow in the capillary tube,
Separated Model, Homogeneous Model.
My computer skills include: Office 2010, Auto Cad, Visio Technical, Adobe photo shop.
I have valid Drivers License, issued in 1996.
Hobbies:
Engineering Drawing.
Reading scientific books.
3