Post Job Free
Sign in

Project Engineer

Location:
San Jose, CA, 95124
Posted:
June 30, 2013

Contact this candidate

Resume:

Husam Aburabi

**** ******** ****

San Jose, CA **124

408-***-**** (Cell)

********@*****.***

June 25, 2013

To Whom It May Concern:

I am a Senior Civil Engineer with 14 years of experience. Most recently I

worked as a Senior Transportation Project Engineer with the firm of

Rajappan & Meyer, Inc. I have extensive experience with the preparation

of Storm Water Data Reports (SWDR), drainage reports, and the production of

comprehensive drainage layout, profile, detail, and quantity plans. I am

highly competent in the use of AutoCad 2011 Civil 3D, Softdesk v.8,

Autodesk Land Desktop 3, and the Hydraflow Storm Sewers 2005 program. I

have had the opportunity to design, generate specifications and perform

estimates for public works projects such as road improvement, light rail,

typical sections, layouts and profiles, super-elevations, pavement

delineation, sign plans, erosion control, and water pollution plans.

Working collaboratively towards solving the various challenges of civil

projects is an aspect of our work that I thoroughly enjoy. I have a strong

background in hydraulics and drainage design. I have been recognized for a

high level of productivity, proficiency, and dedication to my projects.

Given my breadth of experience, high motivation towards professional

growth, diverse skills and desire to undertake increasing responsibility, I

am confident I could make an important contribution to any Civil

Engineering firm. I look forward to meeting with you and discussing

possible professional opportunities within your firm.

Sincerely,

Husam Aburabi

Husam Aburabi

1824 Comstock Lane

San Jose, CA 95124

408-***-**** (Cell)

********@*****.***

Objective: To obtain a challenging, growth-oriented Civil Engineering

position

Education: E.I.T Certified, Jan 1998, License # XE104094, working towards

obtaining

the P.E., October 2014

TECHNION: ISRAEL INSTITUTE OF TECHNOLOGY: Haifa, Israel

B.S. in Civil Engineering, 1996

Work History:

Senior Project Engineer

Rajappan & Meyer, San Jose, CA.

September 2004-Present

RECONSTRUCTION OF EXISTING INTERCHANGE AT STATE ROUTE 99/STATE ROUTE 219

(KIERNAN AVENUE)

. Responsible for interchange drainage design, preparation of drainage

reports and preparation of Storm Water Data Reports (SWDR). The Route

99/219 Project required consideration of Treatment BMPs. Duties have

included Evaluation Documentation Form and preparation of the Long Form-

SWDR, calculation of impervious area pre- and post project construction,

soil extraction information from National Resources Conservation Service

Soil, Construction Site BMP Consideration Form, Risk Level Determination

Worksheet, Treatment BMP Deployment Plan, Water Quality Flow (WQF)

Calculations, Construction Cost Estimate and Smarts Input Data.

Design of detention basins for the capture of all runoff from specific

areas and drain into existing City MS4 underground drainage system. The

runoff was detained in such a way that the flow rate into the MS4 system

would not exceed the flow rate under existing conditions.

100% of Water Quality Volume (WQV) was to be treated in the detention

basin before the storm runoff was discharged to the existing City MS4

underground drainage system.

. Responsibilities have included the preparation and design of plan views,

profiles, and quantities, preparation of drainage reports supporting

proposed plans which included inlet calculations, manhole sizes and

types, and pipe sizes for underground systems utilizing the Hydraflow

Storm Sewers 2005 program which is consistent with the requirements of

Caltrans.

ROUTE 5 NORTH STOCKTON

. Responsible for drainage design for San Joaquin Valley. Duties included

preparation and design of plan views, profiles, and quantities,

preparation of reports supporting proposed plans which included inlet

calculations, manhole sizes and types, and pipe sizes for underground

systems utilizing Hydraflow Storm Sewers 2005 program which is consistent

with the requirements of Caltrans. Prepared construction details,

staging, pavement delineation, and preparation of retaining wall designs

and plans.

FIVE BRIDGES INTERCHANGE

MERCED, CA

. Developed various conceptual alternatives for the Five Bridges

Interchange project, such as hook, Diamond and Parclo options.

. Preparation of layout plans and profiles, traffic analysis, simulation,

cost estimate and design of exception listing.

CAPITOL EXPRESSWAY LIGHT RAIL PROJECT

SAN JOSE, CA

. Preparation of layout plans and profiles for Light Rail Transit (LRT)

consistent with the VTA LRT Design Criteria Manual. Responsible for

relocation and proposed design Sanitary Sewer (SS) and Water lines that

conflict with construction of the new LRT at Capitol Expressway.

. On bi-weekly basis attended coordination meeting with VTA officials and

with various sub-consultants to discuss proposed and unresolved issues in

regards to the LRT project.

Transportation Engineer

URS Corporation, San Jose, CA

November 2000 - September 2004

HIGHWAY 25 SAFETY AND OPERATIONAL DEVELOPMENT PROJECT, CALIFORNIA:

Determined the final quantities of PCC pavement materials for HWY 25

project, assessed impact of RW take on existing farmland, responsible for

generating final cost and quantities for reconstruction of the Highway.

SAN JOSE INTERNATIONAL AIRPORT PROJECT

Responsible for temporary drainage design for the San Jose International

Airport project (SJIA). Designed a connection of two drainage systems, the

"airside" and the "landside". Further duties included preparation and

design of plan views, profiles, and quantities, preparation of reports

supporting proposed plans which include inlet calculations, manhole sizes,

siphon design, and pipe sizes for underground systems utilizing the Hydrain

program.

BP-ARCO LINE UPGRADES

. Produced gas station health and safety plans regarding the removal of

underground fuel storage tanks, pipelines, and dispensers for various Bay

Area Fire Departments (i.e. San Francisco, San Jose, Fremont, Oakland.)

. Composed final reports or analytical data from soil sampling conducted

during the removal and replacement of fuel product lines and dispensers.

ROUTE 880/COLEMAN AVENUE INTERCHANGE PROJECT, SANTA CLARA COUNTY,

CALIFORNIA:

. Prepared plans for parking lots, Completion of working cross-sections (RE

Files), calculation of quantities of materials for pavements, fences,

traffic handling signs, and concrete barriers. Preparation of exhibits

and presentations for conceptual design of I-880 Coleman Avenue.

ROUTE 85/87 INTERCHANGE PROJECT, SANTA CLARA COUNTY, CALIFORNIA:

. Determined the final quantities of PCC pavement materials for 85/87

Interchange project, assessed impact of construction project (I-880

Interchange) on existing utilities, Responsible for generating final Plan

for temporary parking lot at Santa Teresa light rail station (85/87

interchange project).

Associate Civil Engineer

Rajappan & Meyer, San Jose, CA.

January 1999-November 2000

ROUTE 101/85, I-680 & 99

. Responsible for interchange drainage design for Bay Area and San Joaquin

Valley freeways such as 101, 85, the I680 auxiliary lane, and Arch Road

on Route 99. Duties included preparation and design of plan views,

profiles, and quantities, preparation of reports supporting proposed

plans which included inlet calculations, manhole sizes and types, and

pipe sizes for underground systems utilizing the Hydrain program which is

consistent with the requirements of Caltrans. Prepared construction

details, staging, pavement delineation, and preparation of retaining wall

designs and plans.

SAN JOSE MEDIAN PROJECT, SANTA CLARA COUNTY, CALIFORNIA:

. Responsible for design in projects involving the preparation of

demolition plans, layout plans, reconstruction of medians, relocation of

utilities, drainage systems, details, cross-sections, generation of cost

estimates and specifications.

SAN JOSE JOINT LIBRARY PROJECT, SANTA CLARA COUNTY, CALIFORNIA:

. Worked collaboratively with architects and sub-contractors regarding

underground utilities and prepared grading and utility plans for the San

Jose Joint Library Project

. Experienced in highway interchange design

. Prepared drainage, utility plans and water pollution control construction

details (SWPPP) for Light Rail Transportation project

. Generated calculations, created cross-sections, prepared layout plans,

and contour grading for various projects in San Jose

. Surveyed existing sites

. Preparation of plans for redevelopment of public school campuses

. Collection of data from field with standard surveying equipment

. Prepared plans for demolition, grading, utilities, and horizontal control

plans

Civil Surveyor

August 1997-January 1999

DES Architects & Engineers, Redwood City, CA.

. Surveyed existing sites

. Prepared plans for redevelopment of public school campuses

. Collected data from field with standard surveying equipment

. Prepared plans for demolition, grading, utilities, and horizontal control

plans

COMPUTER SKILLS

. Languages: Moderate knowledge of C/C++, JAVA

. Operating Systems: DOS, Windows NT, Windows 2000 Workstation and Server.

. Software: Highly skilled in the use of Autocad, 2004, 2005, AutoCad 2011

3D, LDD (Land Development Software), Softdesk v.8, Microstation,

Hydraflow Storm Sewers 2005 program, MS Word, MS Excel, and the Hydrain

v.6, and 6.22.



Contact this candidate