Paul
Logan
****************@*******.***
Title: Quality Control Manager / Special Inspector
Education: 2008 - 2010- San Diego State University, Plan
Reading, Electrical, Masonry & Concrete Inspection
2001- Contractors License Exam Center,
ICBO Preparation
1984- Accelerated Schools of
La Mesa, Contractors License Preparation
1972- Mar Vista High School
Certifications: ICC Certified Building Inspector
ICC Certified Plumbing
Inspector
ICC Certified Mechanical
Inspector
ICC Certified Electrical
Inspector
ICC Certified Spray Applied
Fire Resistant Materials Inspector
U.S.A.C.E. Construction
Quality Control for Contractors Certificate
OSHA 30 Hour
EM-385 1.1
CPR / First Aid
Fall Protection Training
Boom / Scissor Lift
Powder Tools Certification
Experience:
8/8/11 to Straub Construction Inc. Fallbrook, Ca.
Present Quality Control Manager
MCAGCC BEQ Pkg. #4 Twentynine Palms,
Ca. 518.448 GSF, $125,729,000.
Design Build three new Bachelor Enlisted
Quarters with 576 double occupancy rooms, three
Community buildings, LEED Gold. Design
Build one Dining Facility with seating for 440 and
Straub Design Build one 541 space three level open
parking garage
202 W. College St.
Fallbrook, Ca. 92028 Contact Larry Morser @ 760-***-****
4/2010 to T.B. Penick & Sons Inc. San Diego, Ca.
8/5/11 Quality Control Manager
Camp Pendleton BEQ Pkg. #4 Camp
Pendleton, Ca. 473,000 GSF, $103,603,683.
Design Build four new Bachelor
Enlisted Quarters with 692 double-occupancy rooms, four
Community centers, LEED Gold.
Camp Pendleton BEQ Pkg. #7
Camp Pendleton, Ca. 501,000 GSF $117,923,644.
Design build four new Bachelor
Enlisted Quarters with 751 double-occupancy rooms, four
Penick Community centers, LEED Gold.
15435 Innovation Dr.
San Diego, Ca. #100 92028 Contact Kevin Ruebel @ 858-558-
1800
4/2001 to Construction Testing & Engineering Inc.
Escondido, Ca.
3/2010 Quality Control Manager/ Special Inspection
Performs quality control on government,
military, educational and commercial projects.
Responsible for implementing and
managing the QC program to ensure all work complies
with the contract document
and requirements. Duties include scheduling and documenting
daily QC activities,
performing three phases of control, submittal review and processing,
conducting QC meetings, and
ensuring the required QC testing and inspection is performed.
As QC Specialist and/or
Special Inspector, provides full-service on-site inspections.
Interprets
applicable building,
plumbing, mechanical, electrical codes and approved building plans.
Writes
correction notices, approve,
disapprove, and perform other functions to insure that each aspect
of construction is in
compliance. Provide written and verbal information on code
interpretation
CTE and any on-site problem revealed
by an inspection.
1441 Montiel Rd.
Escondido, Ca. 92026 Contact Tom Gateo @ 760-***-****
MAJOR PROJECT EXPERIENCE:
1/09 - 3/10 NCIS SECURITY BUILDING, P-783, Camp
Pendleton, Ca. $8.4 Million
Quality Control Manager for Navy
project at MCB, Camp Pendleton, Ca. Responsible for
implementing and managing the
QC program to ensure all work complies with the contract
documents and requirements.
10/08 - 1/09 BORDER FENCE, Papago Farms, DV-3, Ajo,
Arizona $24.1 Million
Contractor Quality Control System
Manager for construction of security fencing along the
border between the United States
and Mexico, under the supervision of the Army Corps of
Engineers. Responsible for
implementing and managing the CQC program to ensure all work
complies with the contract
documents and requirements.
8/08 - 10/08 BORDER FENCE, Ceti,s Hill, A-2B, Tecate, Ca.
$2.4 Million
Contractor Quality Control System
Manager for construction of security fencing along the
border between the United States
and Mexico, under the supervision of the Army Corps of
Engineers. Responsible for
implementing and managing the CQC program to ensure all work
Complies with the contract
documents and requirements.
8/07 - 8/08 REPLACE HVAC SYSTEM, Bldg. #7515, MCAS,
Miramar, Ca. $6.2 Mil.
Quality Control Manager for Navy
project at Marine Corps Air Station. Responsible for
implementing and managing the QC
program to ensure all work complies with the contract
documents and requirements.
8/06 - 8/07 PECHANGE RESORT & CASINO, Temecula, Ca.
$158 Million
Project Inspector for facilities
expansion, (over 400,000 feet of additions), consisting
of gaming rooms, dining
facilities, administrative offices, and parking garage.
Responsible for overall building
inspections, including EIFS, mechanical, plumbing and
electrical systems.
3/02 - 1/03 PALA CASINO SPA & RESORT, Pala, Ca. $125
Million
Project Inspector for multi million
dollar expansion consisting of a new ten story hotel,
Gaming area, and other supporting
structures and facilities. Responsible for performing all
types of building inspections,
including EIFS, waterproofing, fireproofing, finishes,
mechanical, electrical and
plumbing systems.
4/01 - 3/02 BARONA VALLEY RANCH RESORT & CASINO,
Lakeside, Ca. $250 Mil.
Project Inspector for the facility
expansion consisting of a new ten story hotel,
gaming area, and other supporting
structures and facilities. Responsible for performing all
types of building inspections,
including EIFS, waterproofing, fireproofing, Fire/Life Safety,
mechanical, plumbing and
electrical systems.
6/07 - 8/07 GRANGER JUNIOR HIGH SCHOOL, National City,
Ca. $1.2 Million
DSA Inspector of Record, (IOR), for the
Sweetwater Union High School District. Project
involved renovations of existing
buildings. Inspections included Shear Wall Framing,
mechanical, plumbing, and
electrical systems.
6/04 - 8/04 HIGHLAND, AVONDALE & MARYLAND SCHOOLS, La
Mesa, Ca. $1.5 Mil.
DSA Assistant Inspector for the Spring
Valley / La Mesa School District. Project involved
renovations to existing
classrooms, restrooms and administrative offices. Building inspections
included framing, mechanical,
plumbing and electrical systems.
2000 to
2001 STANDARD DRYWALL, El Cajon, Ca.
COMMERCIAL HANGER / FRAMER
Suffered career ending injury. Attended
many successful bid conferences in
the one to two million dollar range.
Familiar with contract documents.
Monitored inventory, prepared purchase
orders.
1998 to
2000 BRAD FOX BUILDERS, La Jolla, Ca.
FOREMAN
Performed all lay-out, designed and
constructed all metal framing, installed and finished all
drywall. Coordinated and worked
closely with all subcontractors. Provided high quality
customer satisfaction .Estimated
material take-off, ordered, received and kept inventory of all
materials and supplies.
1996 to
1998 CARDA CONSTRUCTION, San Diego, Ca.
T.I. FOREMAN
Assumed lead role, performing all lay-
out, framing, and all drywall hanging operations.
1987 to
1996 E. F. BRADY CO. INC. La Mesa, Ca.
FRAMER / HANGER
Promoted to drywall foreman after one
year. Performed extensive metal framing of all gages,
fireproofing, and shaft-wall
lining. Strong record of increasing productivity by high level work
ethic and competitive
camaraderie. Trained apprentices at metal framing and drywall crafts.
Consistently able to bring
projects under budget.
1983 to
1987 F.R. GHIANNI DRYWALL CONSTRUCTION INC, El Cajon,
Ca.
DRYWALL FOREMAN
Promoted to foreman after one month.
Supervised entire drywall crew up to 35 men. Managed
and directed drywall hanging,
taping, and texturing and all clean-up operations. Maintained
quality control of finished
product.