Post Job Free
Sign in

Project Quality

Location:
New Delhi, DL, India
Posted:
June 15, 2013

Contact this candidate

Resume:

DHEERAJ SAH

S/O Mr. T.P. Sah

Gram- Hat (Gangapur Hat)

Dwarahat PO Dwarahat

Dist. Almora Uttrakhand.

(E-Mail- *****.***@*****.***, *******.***@********.***)

Cell No. - +919*********

OBJECTIVE:

. To sustain in the Telecommunications industry and to utilize myself

as resource for all kind of challenging jobs by upgrading my

knowledge & skills from time to time.

SUMMARY:

. Nearly 5.9 years of experience in RF Optimizer of GSM (1.8

Years) & 3G/WCDMA (4.1 Years) wireless networks.

Currently work with Ericsson Global India Limited, as a Radio Network

Consulting.

. Roll Out (1st Phase 993 & 2nd Phase 634 3G Sites) 1627 Sites in UPW

with in time line, Tuned Initial parameter of RNC/Sites.

. Total 76 3G New Cities/Town are successfully Lunched In UP West 3G

N/W...

IRAT testing & parametric tuning of all 3G cities in UPW (Dehradun,

Agra, Meerut etc)

. WCDMA(3 Carrier) Neighbours Planning,Swap Sites before & after KPI

Analysis SFR N/W in France

. Maintaining and Expansion of (HTPC) Hutch N/W in Indonesia Customer:

Siemens Project, as a 2G RF Optimizer.

. 3G (WCDMA) Drive Test & Optimization of Sites in Jharkhand.

. Done Scanner Drive test in 3G Networks.

. WCDMA IRAT H/O Check.

. WCDMA Neighbors planning with the help of Yann Tool & MapInfo.

. Check Synchronization Problems in 3G Sites.

. Check Data Calls, Video Calls, Mobile Live TV & Voice Calls.

. Check HSDPA Data Speed in 3G Networks.

. Performing Drive Tests & analysis of RF Drive Tests data on TEMS

Investigation 3.2,5.1,6.1,7.1,8.01,9.0.1 (Ericsson), and RF Planning

tools like MapInfo etc, to determine network Problems, Poor Coverage

areas, Interference, Call drops & Handover Problems.

. Successfully swapped Patna, Jamshedpur, Bokaro, Dhanbad, Ranchi sites

(328 sites) in BSNL Ericsson IV V.1 Mega Project.

. Successfully Optimized Duel Band Sites in BSNL - ERICSSON Project

Jharkhand (More then 100 Sites).

. Done Drive Test in BSc Rehoming & Cheek All Parameters.

. Done Drive Test in TEC Testing Nagaland,Assam (It is necessary for

SACFA Clearance)

. Successfully Optimized more then 3500 Sites ( 900,1800,2100 bands)

. Making CDD 2G New Sites.

WORKING EXPERIENCE: 5.9 YEAR

ORGANIZATION:

Aster Teleservices Pvt. Ltd.

July 2007 to March 2010 as RF Engineer

. Metrotel Work's Pvt. Ltd. As a RF Optimizer

April 2010 to July 2010.

. Sasken Networks Engineering Limited As a RF Optimizer

August 2010 to January 2011

. Ericsson India Pvt. Ltd. As a Radio Network Consulting

Feb. 2011to till now...

RESPONSIBILITY:

. Finalizing the Tower height, antenna orientations.

. Defining the azimuth of antennas.

. Performing Drive Tests & analysis of RF Drive Tests data on TEMS

Investigation 3.2,5.1,5.0,6.0,6.1,7.1,8.01,9.0.1 (Ericsson), and RF

Planning tools like MapInfo etc, to determine network Problems, Poor

Coverage areas, Interference, Call drops & Handover Problems.

. Analyzing interference, Call Drops, Handover failures, Rx Quality, Rx

level etc. and generating Rx Level & Quality Plots using

MapInfo7.8,7.0/MCOM.4.2

. Optimization of handover problems, level and quality to ensure clients

need.

. Responsible for solving various problems faced by subscribers.

. Provide assistance to network planner for better results.

. Proposing New Site to Overcome Coverage Patches & filling Capacity

areas.

. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height &

Orientation according to the Planning Database.

. After Doing Drive Test for particular sites clockwise and

anticlockwise to check Rx level, Rx quality, swap interference and

Handovers.

. Rx Quality, Rx level etc. and generating Rx Level & Quality Plots

using MapInfo.

. Prioritize hardware faults to meet customer demands within the

required time frame along with analysis, solution and reports the

same.

. Successfully swapped Patna, Jamshedpur, Bokaro, Dhanbad, Ranchi sites

(314 sites) in BSNL Ericsson IV V.1 Mega Project.

. Pre-Swap & Post-Swap, GPRS, EDGE, and Dual Band Drive Testing

&Optimization.

. New BSc / MSc /Media Gateway - Call Testing in Time of BSc /MSc/Media

Gateway Installation & Acceptance Test.

. Successfully Optimized Duel Band Sites in BSNL - ERICSSON Project

Jharkhand (More then 160 Sites).

. Handling complains from customers and troubleshooting the problem,

suggesting solutions related to coverage as well as switch.

. Done drive test for those areas and post processing the log files

to find out the KPI's, making the log files into presentable form

for the management and suggesting changes like addition of new

sites.

. Done Drive Test in BSc Rehoming & Cheek All Parameters.

. Done Drive Test in TEC Testing Nagaland,Assam (It is necessary for

SACFA Clearance of Sites)

. Successfully Optimized more then 1900 Sites ( 900,1800,2100 bands)

. Communication of faults and solutions to the customer.

. 3G (WCDMA) Drive Test & Optimization of Sites in Jharkhand.

. WCDMA IRAT H/O Check.

. Check Synchronization Problems in 3G Sites.

. Check Data Calls, Video Calls, Mobile Live TV & Voice Calls.

. Done Scanner Drive test in 3G Networks.

. 3G (WCDMA) Drive Test & Optimization & Planning of Sites in Jharkhand.

. Making CDD 2G New Sites

. Roll Out 1627 3G Sites in UPW with in time line, Tuned Initial

parameter of RNC/Sites.

IRAT testing & parametric tuning of all 3G cities in UPW (Dehradun,

Agra, Meerut etc)

PROJECTS UNDERTAKEN:

Punjab Ericsson Project for AIRTEL Network in coordination with Aster

Teleservices Pvt. Ltd.

Duration: 3 months

. Assam/NE Ericsson Project for AIRTEL Network in coordination with

Aster Teleservices Pvt. Ltd. (It is duel Band 900,

1800 Band)

Duration: 4 months

. Jharkhand Ericsson Project for BSNL Network in coordination with Aster

Teleservices Pvt. Ltd.

Duration: 1.1 months.

. 3G (WCDMA) Drive Test & Optimization of Jharkhand Ericsson Project for

BSNL Network in coordination with Aster Teleservices Pvt. Ltd.

Duration: 1.2 Year.

. Maintaining and Expansion of (HTPC) Hutch N/W in Indonesia

Customer: Siemens Project

Company: Metrotel Work's Pvt. Ltd. As a RF Optimizer

Duration: April 2010 to July 2010.

. WCDMA (3-Carrier) Neighbours Planning, Swap Sites before & after KPI

Analysis SFR N/W in France.

Customer: NSN GNSC Project

Company: Sasken Networks Engineering Limited, As a 3G RF

Optimizer.

Duration: August 2010 to January 2011

CURRENT PROJECT:

. Bharti Airtel UP West WCDMA /3G Roll Out.

Customer: Bharti Airtel.

. Company: Ericsson Global India Limited As a Radio Network Consulting

Duration: February 2011 to till now...

PROFESSIONAL QUALIFICATION:

. B .Tech (Electronics & Communication)

Graphic Era Institute of Technology

H.N.B. Garhwal University Srinagar

. Diploma in Computer Science & Engineering.

Govt. Polytechnic Dwarahat Almora

Technical Board (U.K)

ACEDEMIC QUALIFICATION:

V Intermediate

P.M.S. Inter College Lucknow

U.P. Board

V High School

P.M.S. Inter College Lucknow

U.P. Board

PROFESSIONAL TRAINING:

V One Month Industrial Training from H.A.L. Lucknow (Accessory

Division).

V Six Week Industrial Training from B.S.N.L. Exchange Dehradun

(Uttrakhand).

PERSONAL DETAILS:

Name : DHEERAJ SAH

Father's Name : Mr. Tarun Prakash Sah

Permanent Address : S/O Shri T.P.Sah

Gangapur Hat,

Dwarahat Almora

Phone No: (05966) 244438

099********

Gender : Male

Marital Status : Married

Languages known : English, Hindi

Hobbies : Playing Cricket & Chess.

Current Salary : 5.7 Lakes / Year

Passport No. : Available

Date: 14/06/2013

(Signature)

Place:

DHEERAJ

SAH



Contact this candidate