DHEERAJ SAH
S/O Mr. T.P. Sah
Gram- Hat (Gangapur Hat)
Dwarahat PO Dwarahat
Dist. Almora Uttrakhand.
(E-Mail- *****.***@*****.***, *******.***@********.***)
Cell No. - +919*********
OBJECTIVE:
. To sustain in the Telecommunications industry and to utilize myself
as resource for all kind of challenging jobs by upgrading my
knowledge & skills from time to time.
SUMMARY:
. Nearly 5.9 years of experience in RF Optimizer of GSM (1.8
Years) & 3G/WCDMA (4.1 Years) wireless networks.
Currently work with Ericsson Global India Limited, as a Radio Network
Consulting.
. Roll Out (1st Phase 993 & 2nd Phase 634 3G Sites) 1627 Sites in UPW
with in time line, Tuned Initial parameter of RNC/Sites.
. Total 76 3G New Cities/Town are successfully Lunched In UP West 3G
N/W...
IRAT testing & parametric tuning of all 3G cities in UPW (Dehradun,
Agra, Meerut etc)
. WCDMA(3 Carrier) Neighbours Planning,Swap Sites before & after KPI
Analysis SFR N/W in France
. Maintaining and Expansion of (HTPC) Hutch N/W in Indonesia Customer:
Siemens Project, as a 2G RF Optimizer.
. 3G (WCDMA) Drive Test & Optimization of Sites in Jharkhand.
. Done Scanner Drive test in 3G Networks.
. WCDMA IRAT H/O Check.
. WCDMA Neighbors planning with the help of Yann Tool & MapInfo.
. Check Synchronization Problems in 3G Sites.
. Check Data Calls, Video Calls, Mobile Live TV & Voice Calls.
. Check HSDPA Data Speed in 3G Networks.
. Performing Drive Tests & analysis of RF Drive Tests data on TEMS
Investigation 3.2,5.1,6.1,7.1,8.01,9.0.1 (Ericsson), and RF Planning
tools like MapInfo etc, to determine network Problems, Poor Coverage
areas, Interference, Call drops & Handover Problems.
. Successfully swapped Patna, Jamshedpur, Bokaro, Dhanbad, Ranchi sites
(328 sites) in BSNL Ericsson IV V.1 Mega Project.
. Successfully Optimized Duel Band Sites in BSNL - ERICSSON Project
Jharkhand (More then 100 Sites).
. Done Drive Test in BSc Rehoming & Cheek All Parameters.
. Done Drive Test in TEC Testing Nagaland,Assam (It is necessary for
SACFA Clearance)
. Successfully Optimized more then 3500 Sites ( 900,1800,2100 bands)
. Making CDD 2G New Sites.
WORKING EXPERIENCE: 5.9 YEAR
ORGANIZATION:
Aster Teleservices Pvt. Ltd.
July 2007 to March 2010 as RF Engineer
. Metrotel Work's Pvt. Ltd. As a RF Optimizer
April 2010 to July 2010.
. Sasken Networks Engineering Limited As a RF Optimizer
August 2010 to January 2011
. Ericsson India Pvt. Ltd. As a Radio Network Consulting
Feb. 2011to till now...
RESPONSIBILITY:
. Finalizing the Tower height, antenna orientations.
. Defining the azimuth of antennas.
. Performing Drive Tests & analysis of RF Drive Tests data on TEMS
Investigation 3.2,5.1,5.0,6.0,6.1,7.1,8.01,9.0.1 (Ericsson), and RF
Planning tools like MapInfo etc, to determine network Problems, Poor
Coverage areas, Interference, Call drops & Handover Problems.
. Analyzing interference, Call Drops, Handover failures, Rx Quality, Rx
level etc. and generating Rx Level & Quality Plots using
MapInfo7.8,7.0/MCOM.4.2
. Optimization of handover problems, level and quality to ensure clients
need.
. Responsible for solving various problems faced by subscribers.
. Provide assistance to network planner for better results.
. Proposing New Site to Overcome Coverage Patches & filling Capacity
areas.
. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height &
Orientation according to the Planning Database.
. After Doing Drive Test for particular sites clockwise and
anticlockwise to check Rx level, Rx quality, swap interference and
Handovers.
. Rx Quality, Rx level etc. and generating Rx Level & Quality Plots
using MapInfo.
. Prioritize hardware faults to meet customer demands within the
required time frame along with analysis, solution and reports the
same.
. Successfully swapped Patna, Jamshedpur, Bokaro, Dhanbad, Ranchi sites
(314 sites) in BSNL Ericsson IV V.1 Mega Project.
. Pre-Swap & Post-Swap, GPRS, EDGE, and Dual Band Drive Testing
&Optimization.
. New BSc / MSc /Media Gateway - Call Testing in Time of BSc /MSc/Media
Gateway Installation & Acceptance Test.
. Successfully Optimized Duel Band Sites in BSNL - ERICSSON Project
Jharkhand (More then 160 Sites).
. Handling complains from customers and troubleshooting the problem,
suggesting solutions related to coverage as well as switch.
. Done drive test for those areas and post processing the log files
to find out the KPI's, making the log files into presentable form
for the management and suggesting changes like addition of new
sites.
. Done Drive Test in BSc Rehoming & Cheek All Parameters.
. Done Drive Test in TEC Testing Nagaland,Assam (It is necessary for
SACFA Clearance of Sites)
. Successfully Optimized more then 1900 Sites ( 900,1800,2100 bands)
. Communication of faults and solutions to the customer.
. 3G (WCDMA) Drive Test & Optimization of Sites in Jharkhand.
. WCDMA IRAT H/O Check.
. Check Synchronization Problems in 3G Sites.
. Check Data Calls, Video Calls, Mobile Live TV & Voice Calls.
. Done Scanner Drive test in 3G Networks.
. 3G (WCDMA) Drive Test & Optimization & Planning of Sites in Jharkhand.
. Making CDD 2G New Sites
. Roll Out 1627 3G Sites in UPW with in time line, Tuned Initial
parameter of RNC/Sites.
IRAT testing & parametric tuning of all 3G cities in UPW (Dehradun,
Agra, Meerut etc)
PROJECTS UNDERTAKEN:
Punjab Ericsson Project for AIRTEL Network in coordination with Aster
Teleservices Pvt. Ltd.
Duration: 3 months
. Assam/NE Ericsson Project for AIRTEL Network in coordination with
Aster Teleservices Pvt. Ltd. (It is duel Band 900,
1800 Band)
Duration: 4 months
. Jharkhand Ericsson Project for BSNL Network in coordination with Aster
Teleservices Pvt. Ltd.
Duration: 1.1 months.
. 3G (WCDMA) Drive Test & Optimization of Jharkhand Ericsson Project for
BSNL Network in coordination with Aster Teleservices Pvt. Ltd.
Duration: 1.2 Year.
. Maintaining and Expansion of (HTPC) Hutch N/W in Indonesia
Customer: Siemens Project
Company: Metrotel Work's Pvt. Ltd. As a RF Optimizer
Duration: April 2010 to July 2010.
. WCDMA (3-Carrier) Neighbours Planning, Swap Sites before & after KPI
Analysis SFR N/W in France.
Customer: NSN GNSC Project
Company: Sasken Networks Engineering Limited, As a 3G RF
Optimizer.
Duration: August 2010 to January 2011
CURRENT PROJECT:
. Bharti Airtel UP West WCDMA /3G Roll Out.
Customer: Bharti Airtel.
. Company: Ericsson Global India Limited As a Radio Network Consulting
Duration: February 2011 to till now...
PROFESSIONAL QUALIFICATION:
. B .Tech (Electronics & Communication)
Graphic Era Institute of Technology
H.N.B. Garhwal University Srinagar
. Diploma in Computer Science & Engineering.
Govt. Polytechnic Dwarahat Almora
Technical Board (U.K)
ACEDEMIC QUALIFICATION:
V Intermediate
P.M.S. Inter College Lucknow
U.P. Board
V High School
P.M.S. Inter College Lucknow
U.P. Board
PROFESSIONAL TRAINING:
V One Month Industrial Training from H.A.L. Lucknow (Accessory
Division).
V Six Week Industrial Training from B.S.N.L. Exchange Dehradun
(Uttrakhand).
PERSONAL DETAILS:
Name : DHEERAJ SAH
Father's Name : Mr. Tarun Prakash Sah
Permanent Address : S/O Shri T.P.Sah
Gangapur Hat,
Dwarahat Almora
Phone No: (05966) 244438
Gender : Male
Marital Status : Married
Languages known : English, Hindi
Hobbies : Playing Cricket & Chess.
Current Salary : 5.7 Lakes / Year
Passport No. : Available
Date: 14/06/2013
(Signature)
Place:
DHEERAJ
SAH