Post Job Free
Sign in

Project Construction

Location:
Mumbai, MH, India
Posted:
June 22, 2013

Contact this candidate

Resume:

Permanent Address: - Phone: - ****-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Position Applied : Sr.QA/QC INSPECTOR (INSTRUMENTATION)

Career Objective

To join a progressive & reputable company as Senior QA/QC Inspector (Instrumentation) to apply the

relevant knowledge, expertise and experience acquired in previous employment & Contribute significant

progress.

EDUCATION : Diploma in Instrument Engineering From Bhagalpur University

TOTAL EXPERIENCE : 13+ Years as “QA/QC Instrumentation Professional.

Approval By ADCO

Brief Experience Summary:

I have experience in construction, commissioning, start-up, shutdown, and maintenance in refineries, Petrochemical, Oil

& Gas and off-shores Plants in mentioned below jobs:

Regular surveillance/inspection of construction activities as per project inspection and test plan.

Assign and monitor respective duties of other QA/QC inspector.

Store and maintain all quality records.

Coordinate with construction personnel about ongoing inspection issues.

Regular reporting to QA/QC Engineer & Manager, on any major issues which require immediate action.

Ensure proper implementation of ISO 9001.

QC inspection for instrumentation/electrical system as per quality control procedure, instrument test plan and

project specification.

Inspection of cable trays, conduit, instrument, marshalling cabinet, interface cabinet, control desk and low

voltage distribution system.

Ensuring all instrument were installed& tested as per project quality procedure and project specification and

prepare ITP forms (Instrumentation Installation Inspection).

Pre loop inspection

Prepare RFI (Report for Inspection) to client for joint inspection of completed work

All activities during the construction & commissioning of control cable meggering and measuring earth

resistance test.

Ensuring all instrumentation were installed and tested as per project quality procedure and project specification

and preparation of ITP forms for instrument installation inspection.

Coordination with pressure testing team of impulse lines and preparation of ITP forms and Test Reports.

To ensure that all inspection and test records are properly documented and made available to the client on

completion in accordance with contract requirements.

Review of design and construction related document conducting material inspections.

Conduct all instrument inspection as per Approved ITP.

Prepare non-conformance with the customer’s representative to ensure good quality.

Mechanical completion acceptance from construction and responsible for recording and clearing all

instrumentation punch list and documentation.

Ensure that inspection are performed in a timely manner and recorded as per specification and standard detail

drawing ITP’s and QCP’s

Issuing material discrepancy reports for any deficiency.

Page 1 of 10

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Language known:

I can Write and Speak English excellently. A part of all I can also speak Urdu, Arabic, and Hindi.

Industrial Standards:

Well versed with the Industrial global Standards like ISA, API, ASME, and ASTM used for Instrumentation

part.

JOB SUMMARY: -

Organization : Petrofac International, ASAB FFD Project, Abu Dhabi, UAE

Designation : Senior QA/QC Inspector (E & I)

Tenure of Job : From June 2012 to Nov 2012

Nature of Job in brief:

Witnessing instrument calibration and cross checking data sheet.

Documentation of all calibrated instruments

Witnessing of all process and pneumatic tubing for pressure testing

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to cable

glanding and termination

Preparation of loop folders prior to loop checking

Punch listing with main contractor and client as per the project standard and requirements to ensure that changes and the

2

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

current revision status of documents are identified.

QC inspection for instrument system as per inspection and test plan, project specification.

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Ensuring all instruments were installed & tested as per project quality procedure, project specification and preparation of

ITP forms (Instrument Installation Inspection).

Pre-loop inspection.

Inspection for all activities during the construction and commissioning of instrumentation.

Punch list clearing.

Performed Surveillance for ongoing construction activities.

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to cable

glanding and termination.

Organization : KENTECH International, Abu Dhabi, UAE

Designation : Senior QA/QC Inspector (E&I)

Tenure of Job : From February 2008 to January 2012

Nature of Job in brief:

Witnessing instrument calibration and cross checking data sheet.

Documentation of all calibrated instruments

Page 3 of 10

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Witnessing of all process and pneumatic tubing for pressure testing

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to cable

glanding and termination

Preparation of loop folders prior to loop checking

Punch listing with main contractor and client as per the project standard and requirements to ensure that changes and the

current revision status of documents are identified.

QC inspection for instrument system as per inspection and test plan, project specification.

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Ensuring all instruments were installed & tested as per project quality procedure, project specification and preparation of

ITP forms (Instrument Installation Inspection).

Pre-loop inspection.

Inspection for all activities during the construction and commissioning of instrumentation.

Punch list clearing.

Performed Surveillance for ongoing construction activities.

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

4

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to cable

glanding and termination.

Organization : CCC, Khurasania Gas Plant, (Jubail, Saudi Arabia)

Designation : QA/QC Inspector (Inst.)

Tenure of Job : From April 2007 to November 2007

Nature of Job in brief:

Witnessing instrument calibration and cross checking data sheet.

Documentation of all calibrated instruments

Witnessing of all process and pneumatic tubing for pressure testing

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to cable

glanding and termination

Preparation of loop folders prior to loop checking

Punch listing with main contractor and client as per the project standard and requirements to ensure that changes and the

current revision status of documents are identified.

QC inspection for instrument system as per inspection and test plan, project specification.

Page 5 of 10

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Ensuring all instruments were installed & tested as per project quality procedure, project specification and preparation of

ITP forms (Instrument Installation Inspection).

Pre-loop inspection.

Inspection for all activities during the construction and commissioning of instrumentation.

Punch list clearing.

Performed Surveillance for ongoing construction activities.

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to cable

glanding and termination.

Organization : AL-HASSAN ENGINEERING Co. S.O.A.G. (OMAN)

Designation : QA/QC Inspector (E&I)

Tenure of Job : From July 2005 to February 2007

Nature of Job in brief:

Issuing non-conformance report (NCR) for the discrepancies of works.

Inform client representative by the official application of inspection and arrange the joint inspection according to

relevant ITP.

Receive the construction RFI and determine construction works status i,e check installation conformity to project

6

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

specification.

Witnessing instrument calibration and cross checking data sheet.

Documentation of all calibrated instruments

Witnessing of all process and pneumatic tubing for pressure testing

Witnessing instrument installation as per specification

Witnessing of cables installation resistance and continuity check prior to installation

Witnessing the installation junction boxes in the field and control/marshalling panels in the control room prior to

cable glanding and termination

Preparation of loop folders prior to loop checking

Punch listing with main contractor and client as per the project standard and requirements to ensure that changes

and the current revision status of documents are identified.

Punch listing with main contractor and client as per the project standard and requirements to ensure that changes

and the current revision status of documents are identified.

QC inspection for instrument system as per inspection and test plan, project specification.

Page 7 of 10

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Inspection for Installation of cable trays, conduit, instrument, marshalling cabinets, low voltage distribution system.

Continuity & Megger Test, Impulse line, Air Line and Loop Folder Inspection.

Coordinate with construction personal about ongoing inspection issues.

Ensure proper implementation of ISO 9001.

Regular reporting to QA/QC Engineer & manager discussion with on any major issues which required immediate

action.

Ensuring all instrument works carried out comply with project quality documents and standards.

Preparing punch list items, making surveillance of construction activities.

Organization : M/s TRAGS, QATAR

Designation : QA/QC Inspector (Inst.)

Tenure of Job : From February 2005 to May 2005

Nature of job:

Plant preventive maintenance activity: Obtain a work permit from operation department; visit on the job site with area

field operator to determine for safe work condition.

Responsible for troubleshooting the problems occurred in the instruments during commissioning.

Responsible to see that the assigned job is timely completed as per the planning schedule.

Redlining the drawings, termination schedules, Instrument Loop Diagram (ILD), Datasheets and Logic diagrams, cause

& effect etc., as per the modifications made on site.

Discuss with operation and resolve the problems associated with measurement variables in the relevant documents with

the process people.

Organization : SAUDI TOYO ENGINEERING COMPANY (SATEC)

8

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

Designation : QA/QC Inspector (E&I)

Tenure of job : From December 2000 to January 2005.

Nature of Job:

Supervising Calibration of Electronic Instruments.

Supervising Installation of Calibrated instruments online.

Trouble Shooting.

Supervising Pane & Cable Termination.

Supervising Works related to Control-Room.

Supervising Installation of PLC/F&G and ESD system.

Arrange for work permit for works/inspections to be carried out in areas that are under commissioning.

Responsible to see that the assigned job is timely completed as per the project schedule.

Pre loop check responsibility prior to release for final loop check. Final loop check & functional check responsibility

with client.

Commissioning of the Process one-by-one from Instrument to control Room Passing through, Junction Box, Panel Box,

Marshalling Rack, PLC, DCS, whether it is working properly or not.

QA/QC conformance and getting clearance from the client for different jobs related to instrumentation.

Organization : JAYKRISHNA INDUSTRIES LIMITED

Designation : Instrument Technician

Tenure of Job : From August 1997 to July 2000.

Nature of Job:

Installation of Supports/Tray/Ladder/PG-16/Flexible Conduit works for cable routing and then it’s pulling as per

specified standard requirements and drawings.

Installation of local and central control panels.

Troubleshooting and rectify of Fire & Gas system carried out online.

Field calibration of both type of Pneumatic and electronic instruments e.g. pressure transmitter, flow meter, Pressure

Page 9 of 10

Permanent Address: - Phone: - 0091-919-***-****

Mobile :- 0091- 993*******

AT: - Kaitha,

POST: - Dhamoul,

DIST: - Nawada

STATE: - Bihar - 805101

D. O. B. 10-02-1974

SHAMSH TABREZ E-mail: - *******@*****.***

gauge, Temperature indicator.

Assisted operation personnel when in time of performing annual test in every stand by emergency equipment.

Job Brief

Worked for Utility plant as a Instrument Technician.

Involved in Instrument calibration and Installation

Installation of Calibrated instruments online.

Trouble Shooting.

Panel & Cable Termination.

Works related to Control-Room.

Installation of PLC/F&G and ESD system.

Passport Details:-

Latest Passport No. : G6582553

Previous Passport No. : A7841866

Place of issue : Patna

Date of issue : 27.12.2007

Date of expiry : 26.12.2017

I hereby certify that the above information furnished by me is true and correct.

I am looking forward to hear from you soon.

Regards

SHAMSH TABREZ

10



Contact this candidate