Post Job Free
Sign in

Project Manager Construction

Location:
Murrieta, CA, 92562
Posted:
June 21, 2013

Contact this candidate

Resume:

* ** *

ROBERT M. RUD (BOB)

***** ******* ***

Murrieta, CA 92562

Phone: 951-***-**** (cell)

Email: ******@*****.***

OBJECTIVE:

To make a positive difference with your company: to work as a team player, to manage trades,

subcontractors and vendors on-site well; keep everyone safe and productive at their jobs; to push the

project’s schedule and quality, to expedite deliveries; to coach, train, instruct, motivate and coordinate

work in an organized culture; mentor any company employees as a professional construction

superintendent; to complete project on schedule or early to the client / owner without any claims,

delays or injuries and have the project be profitable and successful to all involved.

EMPLOYMENT HISTORY:

W. L. Butler Construction Inc. Irvine, CA 92618 02/22/2013 thru 06/14/2013

BANK SUPERINTENDENT: Worked involved CHASE Bank CPC Remodel & Tenant Improvement

work inside bank and also included ADA site work upgrades. Majority of work took place during off-

hour night shifts (7:00 p.m. to 8:00 a.m.). Sites started & completed: Rancho Bernardo, Encinitas &

Hillcrest, all in San Diego County. Other CHASE Bank CPC work locations: Alicia Parkway, Aliso

Viejo & Laguna Hills, to do extra contract work, during both day & night shifts.

My work involved to: schedule, supervise, coordinate trades, subcontractors, bank vendors and worked

with City & Deputy Inspectors from demolition to punch list, thru City’s Final Building Inspection visit

and sign-off.

DEB Construction Inc. Anaheim, CA 92806 9/28/2007 thru

12/13/2012

SUPERINTENDENT: scheduled, supervised, coordinated trades, subcontractors, vendors and

worked with City Inspectors and other pertinent inspection agencies at following projects:

1. BANK OF AMERICA. Perris, CA. New ground up retail bank with drive-thru & major site

package, completed final city inspections and received Certificate of Occupancy.

2. BANK OF AMERICA MORTGAGE. Arcadia, CA. Took over interior shell build-out &

upgrade, completed final city inspections and received Certificate of Occupancy.

3. BANK OF AMERICA. Moorpark, CA. Took over new ground-up @ BTO; did major site

work, punch list, completed final city inspections and received Certificate of Occupancy.

4. XCEED FINANCIAL CREDIT UNION AMERICAN HEADQUARTERS. El Segundo, CA.

3-Two story building shell build-out and installed one elevator in each building. I was one

many DEB superintendents on-site helping project to keep moving thru much diversity.

5. RECREATION EQUIPMENT INC. AMERICAN HEADQUARTERS [REI] Kent, WA.

20,000 sq. ft. Data Center: added redundant power supply, installed back-up generator and

replaced interior HVAC Units in active live 24/7 Data Center. Received final city & state

inspections.

6. HOAG HOSPITAL. Newport Beach, CA. 5,000 square foot Radiology Warehouse Remodel.

7. BANK OF AMERICA. L. A. @ Wilshire & Grand Downtown. Exterior ADA Access @

ATM.

2 of 7

8. HBSC BANK. Artesia, CA. New retail T.I. prototype build-out with one ATM machine.

9. HOAG HOSPITAL P.E.D. LINK. Newport Beach, CA. Installed 1200 feet underground future

infrastructure conduit, vaults & pull boxes for future back-up power, phone & data.

10. HOAG HOSPITAL SOUND WALL. Newport Beach, CA. Erected 480’ long sound wall on

grade beams over & around numerous site utilities along west Hoag Drive on property line.

11. CHASE BANK @ State College & LaPalma. Anaheim, CA. New ground up: 2-story

building demo, new U/G electrical infrastructure, new cell tower interface & major site

package.

12. CHASE PRIVATE CLIENT (CPC). Palo Alto, CA. New 9000 square foot shell build-out.

13. BANK OF AMERICA. San Francisco Bay Area. Pre-con for Roof HVAC system upgrades.

14. CHASE BANK @ Pacific & Belgrave. Huntington Park, CA. New retail build-out after

demo.

15. BANK OF AMERICA/MERRILL LYNCH. Elevator lobby remodel @ night. San Diego, CA.

16. CHASE BANK @ Imperial & LaPalma. Anaheim, CA. New retail bank & marketing offices.

Interior gutted out, major structural upgrades& façade on 7,000 square foot build-out.

17. CAMP PENDLETON REPLACEMENT HOSPITAL. Oceanside, CA. Supervised

subcontractor who installed structural tube steel beams for ceiling mounted hospital equipment.

18. CHASE BANK @ Mountain & 4 . Ontario, CA. New retail bank: Interior & exterior demo,

TH

new U/G utilities, shell build-out with ADA parking & drive-up ATM island canopy.

19. UCI-MEDICAL CENTER / G.T.R.I. Project. Orange, CA. Design Build: Government High

Security Upgrades in two buildings.

20. CHASE BANK @ Atlantic & Valley. Alhambra, CA. New retail bank: took over project from

open ceiling thru finishes; major parking lot, site, traffic signal & street work on city corner.

NOTE: ALL ABOVE PROJECTS WERE COMPLETED ON TIME OR OWNER

OCCUPIED BUILDING EARLY, except projects #4, # 17 and #19, as I was transferred by

management to next project.

TOVEY / SCHULTZ CONSTRUCTION INC. Lake Elsinore, CA 92530 03/2006 thru

09/2007

PROJECT SUPERINTENDENT and / or INTERIOR SUPERINTENDENT: scheduled,

supervised, coordinated trades, subcontractors, vendors and worked with City Inspectors and other

pertinent inspection agencies, like Health Department of State Elevator, @ following DESIGN BUILD

projects:

1. UNIVERSITY OF REDLANDS. Redlands, CA. Classroom & Office T.I. & Remodel work

with city recycle program and work thru city final inspections.

2. UNIVERSITY OF REDLANDS. Redlands, CA. Dormitory Remodel & Upgrades: interior

demo, room build-out, new ADA wheelchair lift with State Elevator Inspection, new exterior

curtain wall windows system during summer break and thru final city inspections.

3. REDHILL COUNTRY CLUB. Rancho Cucamonga, CA. New golf coursed Club House,

full use facility (kitchen, restaurants and high-end cocktail & wine bars; thru final city

inspections.

4. WHITTIER COLLEGE. Whittier, CA. Dormitory Remodel & Heating System Upgrade:

Interior demos, room build-out during summer break thru final city inspections.

3 of 7

NOTE: ABOVE PROJECTS COMPLETED & OWNER OCCUPIED ON SCHEDULE OR

EARLIER.

ARB INC. (STRUCTURES GROUP). Lake Forest, CA 09/2005 thru

02/2006

PROJECT MANAGER: QUALLCOM PARKING STRUCTURE in north city area. On-site

manager for design build post-tension cable parking structure; dealt with manpower & safety; quality

of work; tracked existing schedule from deck pour 12 thru deck pour 17; worked on LEED close-out

information with office; did physical work as needed to help project, etc.

HAL HAYS CONSTRUCTION INC. Riverside, CA 05/2005 thru

08/2005

ON-SITE: SUPERINTENDENT/SAFETY OFFICER & QUALITY CONTROL: Fort Irwin

Military Base, Barstow, CA. Organized three floor barrack renovation project; required to phase work

one floor at a time while other two floors stayed occupied; did soft demo and build-out; developed site

safety program; did physical work as needed to help project and worked directly with USACE Quality

Assurance Representative.

McCARTHY BUILDING COMPANIES. Newport Beach, CA. 11/1995 thru

01/2005

SAFETY COORDINATOR: California Division, managed safety program with Doug Burford, the

Director of Risk Management & In-house attorney; worked with Steve Cox, Division Safety Director

after Doug Burford left McCarthy. Work included: workers' compensation documentation for hundreds

of projects in (9) nine plus years. My efforts in the safety department helped reduce the OSHA

Recordable Incident Rate; the OSHA's Lost Time Case Rate and the State Insurance Ex-Mod Rate.

Our Safety Department received, 2002 AGC California: Million Man-Hour Safety Award.

I assisted in several OCIP Projects and one CCIP Project. I tracked, coordinated and scheduled all

Division safety training for company; enforced Cal-OSHA and project requirements for all McCarthy

subcontractors, staff and field personnel. I wrote-up and disciplined employees who were non-

compliant, which included days off without pay. I promoted the safety program outwardly with

wearable items; I ordered and distributed all promotional “Safety Works” items to individuals, on

monthly and quarterly basis, for all job sites who had Zero Incident rates. I personally inspected every

job site and project type in California: hospitals, parking garages, offices, K-12 schools, Universities,

industrial, commercial, entertainment, public works, tenant improvements, etc.

McCARTHY BUILDING COMPANIES, INC. Newport Beach, CA. 05/1990 thru

11/1995

PROJECT ENGINEER, AREA SUPERINTENDENT & CONSTRUCTION MANAGER: I

worked on project job site staff’s that were already mobilized and in process; helped other project staff

personnel as needed by Project Manager or Construction Director; to coordinate projects self-

performed, did quantity take-offs, ordered materials, wrote RFI’s, did material submittals, attended

owner’s project meetings, scheduled subcontractor work, did system start-up’s, completed punch list

4 of 7

work, verified change order work, scheduled inspections, did as-built plans, transmitted turn-over

items, verified & scheduled warranty work, did project archiving and close-out work at several

projects.

McCARTHY PROJECTS & JOB SITES as Project Engineer, unless noted otherwise:

1. JOHN WAYNE AIRPORT, Multi-Task Wrap-Up Public Work Project. Santa Ana, CA. Last

contractor on-site; resolved schedule issues to open projects on-time for planes to take-off.

2. MORNINGSIDE OF FULLERTON, Senior Retirement Complex; Area Superintendent for

56 Villas, finalized issues with City & Utilities in 56 Villas for occupancy move-in as

scheduled.

3. UNIVERSITY CALIFORNIA IRVINE, Science Library; monitored bankrupted steel

subcontractor @ their fabrication plant in Salt Lake City, UT, to ensure steel delivery.

4. LOMA LINDA MEDICAL CENTER, Corridor & Entry Projects, close-out & warranty

process.

5. CALIFORNIA STATE UNIVERSITY @ FULLERTON, Science Laboratory; punch list,

turn-over and close-out. Job from hell, Owner couldn’t use it & didn’t have money to operate

it.

6. KAISER BALDWIN PARK HOSPITAL started & completed punch list process for 750,000

square foot project; finalized I.O.R. correction items and was third person left on-site.

7. BANK OF AMERICA DATA CENTER @ 9th Floor Cafeteria. San Francisco, CA. Interior

demo and rebuild in Critical Work Environment; wrote demo scripts; micro-managed MEP

subcontractor work with general foreman and superintendent. Worked different shifts, 7-days a

week as needed. Opened on time per original schedule and the success of this project opened

the doors for years of work between McCarthy and Bank of America.

8. POMONA VALLEY HOSPITAL, Pomona, CA. Worked on seven (7) OSHPD Projects in

occupied hospital with superintendent: corridors, above existing ceilings and shell build-outs

for new x-ray department and new LDR wing night shift work.

9. DISNEY GOALS, Outdoor In-Line Skate Rink Project. (Non-profit) As Construction

Manager, I organized, supervised and did field labor; recruited subcontractors and material

vendors to provide and perform all work and materials for free, with the hope to get public

relations as their only perk to City of Anaheim and Disney. Original 30-day schedule, started

late demo sub stood me up but was able complete project in less than 30-days.

KETTERING & KRUSSMAN, INC. Artesia, CA. 11/1988 to

05/1990

PROJECT ENGINEER: I worked with P. M. to gather material product data and costs from

vendors for product submittals; I did concrete and rebar quantity take offs for estimators.

PURCHASING ADMINISTRATOR: I set-up and organized new Purchase Order System;

managed purchases thru my office by having all Superintendents place their material and

equipment orders with me; from nails to concrete ready mix; from truck cranes to concrete

pump equipment. I meet with all salesmen; I shopped around and documented best available

prices and material stock. I worked with company yard foreman to dispatch materials &

equipment items requested by superintendents for delivery to their individual job sites. I revised,

approved and processed all vendor invoices prior to payment. In first 12-months, I was able

5 of 7

to deduct and save $589,000 from invoices for incorrect pricing by salesman, unapproved hidden

costs and vendor accounting department mistakes.

EDUCATION, CERTIFICATIONS, TRAINING, ACCOMPLISHMENTS, ETC.:

USC. Los Angeles, CA. Major: Speech Communications with Business 1976 to 1979

UNLV. Las Vegas, NV. Major: Undeclared, general education classes 1975 to 1976

TRAINING & CERTIFICATES:

NAVFAC: Contractor's Quality Management Training Total Quality Management in Construction

Project Engineer Training Supervisor Training Accident Reduction

Techniques OSHA 30-Hour Course # 510 OSHA 10-Hour Course

CAL-OSHA Trenching & Excavation Standards Mobile Crane Safety

Awareness Training For Crane Managers Lead Awareness Training

Crane: Basic Rigging Plan, Sling & Hardware Inspection Cal/OSHA Update Seminar for Contractors

Basic First Aid / CPR Certified Washington Asbestos

Worker

SPECIAL SECURITY CLEARANCE FOR ACCESS:

Depart. Of Army @ N.T.C. Depart. Of Navy & NAB & NASNI

Depart. Of Defense @ Puget Sound Naval Shipyard Depart. Of Corrections @ Shelton Prison

Sheriff’s Office @ Mason County Jail Sheriff’s Office @ Thurston County Jail

FAA Runway Access @ Orange County Airport (JWA) Kaiser Permanente Hospital

Bank of America @ Data Center LA County - USC Medical Replacement

Hospital

Anheuser-Busch Plant @ Stock house # 8 Bank of America Retail Construction

REI – Data Center Access Authorization HSBC Retail Construction

J. P. Morgan Chase Retail Construction U.S.M.C. Camp Pendleton

UCI Medical Center, Access Control FBI Fingerprinting @ UCI Medical Center

PROFESSIONAL ACCOMPLISHMENTS:

L.I.U.N.A. Member (7/1979 thru 01/1987)

Melvin McCarthy Award – Annual Top Project in Division

Roger Burnett Award – Annual Top Project in Company

Communicator of the Year for Public Relations

McCarthy Outstanding Performance in the Safety Program

2002 AGC California: Million Man-Hour Safety Award

PERSONAL ACCOMPLISHMENTS and ACTIVITIES:

Church Board Leadership, Choir Member, Deacon & Chairman of Buildings and Ground.

UNLV Water Polo Team and Swim Team, (Scholarship) and USC Trojan Swim Team Member.

NCAA Independent National Swimming Championship, 11th Place, 200 yard butterfly.

Coached Youth Soccer, Swimming and Little League Baseball

Murrieta Valley Unified School District: Measure 'K' Citizen's Over-Sight Committee At Large

Swimming Sportsman of the Year Award and High School Football Letterman & Baseball Team

COMPUTER SKILLS & TRAINING:

ExecuTrain: Outlook 98 / Explorer. Used Constructware for company documentation.

6 of 7

Microsoft Office: Word, Excel, Outlook & Access. MS Project.

Introduction to: USACOE – RMS

PROFESSIONAL REFERENCES PROVIDED UPON REQUEST UNDER SEPARATE COVER

PHYSICAL FIELD WORK: PROJECTS & EMPLOYERS, the Early Years:

GENERAL SERVICES DEPARTMENT, Mason County: Shelton, WA. [05/1987 to 10/1988]. My

job title was, Maintenance II, which involved maintaining interior and exteriors of all county buildings.

FACILITIES SERVICE DEPARTMENT, Thurston County: Olympia, WA. [01/1987 to 05/1987]. I

was helper to the department staff; maintained all county buildings interior & exterior via work orders and

competitive material purchase bidding, needed three (3) bids before a purchase could be made.

L.I.U.N.A. Local # 252. In Washington State. [10/1984 thru 01/1987]. Projects included:

BREMERTON NAVAL SHIPYARD: Hensel Phelps Construction, Inc. [12/17/1984 to 12/05/1985].

Underground utility tunnels & communication duct banks. I worked on concrete placement crew,

structural wood lagging crew & worked as carpenter helper.

PORT OF TACOMA, KAISER ALUMINUM PLANT FACTORY: HVAC Superintendent put me in

charge of safety and material organization. Factory was active and occupied 24 hour a day 7-day week, it

produced aluminum from raw materials, via high voltage & low amperage, and nothing grounded, making

it very dangerous. We removed old under sized steel exhaust duct work with hazardous material inside

duct; loaded out & removed hazardous material to Oregon; installed new heavy gauged round steel

ductwork; upgraded whole exhaust system upgrade for EPA Clean Air Act. Facility so dirty, coveralls

required & provided; shower trailers provided & showers were required for workers before leaving site.

Also, plant had drive-thru car rinsing station available to wash off factory ‘fall-out’ from vehicles. I

operated forklifts, scissor lifts and articulated skip loader.

WASHINGTON STATE CORRECTIONAL CENTER: Shelton, WA. Punch list work @ New IMU

Wing & Kitchen Remodel work around trustees. Gau, Landau & Young Construction. [10/1984 to

12/1984]

WASHINGTON STATE CORRECTIONAL CENTER: Shelton, WA. Interior remodel punch list

work in unoccupied older prison wing. Employer: Todd Building Company, from Oregon. [02/1985].

L.I.U.N.A. Local # 872: Southern Nevada. [07/1979 to 07/1984]. Project worked on:

LAS VEGAS YMCA: New Facility, ground-up. I was first worker on-site and last worker to leave site.

Did anything and everything the superintendent, Project Manager or foremen would let me try. I was the

unofficial carpenter apprentice on-site. I was the gopher who ran all the errands, I hauled construction

trash in company 2-ton truck out to Las Vegas land fill dump behind sunrise mountain; worked with all

the trades; helped place all concrete, S.O.G., columns and elevated decks; erected and dismantled

scaffolding; chipped & bushed concrete. Also, lived in company trailer on-site and served as security

guard. NOTE: one night found dead body on-site and called Police. Employer: Blanchard Construction,

Inc. [6/25/1979 to 05/1980]

ATRIUM 9-STORY C.I.P. OFFICE & PARKING STRUCTURE: I was on concrete placement crew;

served as carpenter helper for deck crew; stripped out concrete formwork; helped rig materials for crane

7 of 7

to fly formwork to next deck pour deck; scattered hand-set scaffold frames and components; worked with

crane during concrete placement using 2-yard bucket; did trade clean-up.

Employer: Tiberti Construction, Inc. [08/1980 to 02/1981]

MGM GRAND HOTEL: Post- Fire Work. HVAC duct work restoration crew. [2/1981 to 5/1981]

GTE SYLVANIA BATTERY PLANT: Henderson, NV. Did fine grading for pre-Slab-on-grade

concrete work. Installed sandbags for water retention pit outside building and trade clean-up.

Employer: Mardian Construction, Inc. [07/1981]

3rd & BRIDGER: 8-STORY PARKING STRUCTURE. Concrete placement crew for 48 decks pours;

placed all concrete for all columns, shear walls, stairwells and elevator walls; carpenter helper during

stripping and re-setting formwork. Worked with crane operator and used 3-yard bucket to place all major

concrete work; used motorized Georgia-Buggies to place concrete in stem walls and delay strips.

Employer: TGK/McCarthy Construction. [08/1981 to 10/1982]

UNION PLAZA HOTEL: New C.I.P. South Tower Addition. Carpenter helper setting and stripping

concrete deck fly-form system. Tiberti Construction Inc. [11/1982 to 01/1983].

THOMAS & MACK SPORTS ARENA: UNLV Campus. Carpenter helper and fine grader. Cut rough

grade, dirt and mud that were too high ahead of concrete placement crew for radius stadium bowl seating

C.I.P. Toughest work of my life: 9,000 shovel scoops per day.

Employer: Mardian Construction, Inc. [01 to 03/1983]

LANDMARK HOTEL: Retrofit Fire Sprinkler System Project; new code requirement have MGM

Grand Hotel fire. Worked with subcontractors, with safety, clean-up and limited noise in occupied Hotel.

Employer: J. R. Porter Construction, Inc. [03 to 04/1983].

J.R. PORTER CONSTRUCTION OFFICE: New local Company Office Complex. Carpenter helper

& ran errands for build-out work @ existing shell space.

Employer: J. R. Porter Construction, Inc. [04 to 05/1983]

PADDLE WHEEL HOTEL & CASINO: Unoccupied Casino demo and remodel for new family image

with Pizza and animated Theater. Hotel tower: added Fire Sprinkler System retrofit work for new code

following MGM Grand Hotel fire.

Employer: J. R. Porter Construction, Inc. [06/1983 to 02/1984]

DON LAUGHLIN’S EDGEWATER HOTEL & CASINO: Occupied building. Carpenter help for

final punch list and warranty work, as owner held million dollar retention. Replaced faulty bathroom

mirrors; caulked thresholds for wind / noise reduction, replaced p-lam counter tops, adjusted doors,

replaced door closers, etc.

Employer: J. R. Porter Construction, Inc. [02/1984 to 05/1984]

NEVADA STATE HISTORICAL SITE RESTORATION PROJECT: We as-built brick & stone

building, marked, labeled, photographed & dismantled; installed structural reinforcing steel columns and

concrete; then reinstalled everything back to its original position and look.

Employer: Carson & Hazard Construction, Inc. [06/1984]



Contact this candidate