Joshua Brooks
*** ********* **. ***** **, *****
Phone 925-***-****
E-mail ******.*********@*****.***
Education
Assistant Project Manager /
Pensacola, FL
Project Superintendent
2003 American Segmental
Bridge Institute
Berkeley, CA
14 Years of Construction
2003 Florida Transportation
Experience institute
Pensacola, FL
2003 Post Tensioning Institute
Gainesville, FL
Management Profile
14 years of experience in various degrees of construction. Proven ability to manage and supervise multiple projects and there tasks in a
dynamic fast pace environment. Superior communication and organization skills. Strong interpersonal skills and an ability to work
with and manage cross-functional teams. Creates and implementing project work plans, revising plans details based on client needs
and project requirements. Detail oriented and capable of executing projects from conception to close-out, possesses a strong practical
working knowledge of construction.
Technical Proficiency and Achieved Certifications
● MS
Project ● MS Excel ● MS Word ● MS Outlook ●
Progen/Egordian Estimating Software● ●Prolog ●
●
● OSHA 30 Hour Certified ● Epoxy Injection Technician●
● Certified Grouting Technician ●
Professional Experience:
2010 - Present
Agbayani Construction Corporation – East Bay Hayward, CA
Assistant Project Manager
Project Lists:
Job Order Contracts at Alameda County General Services Administration
Job Order Contracts at Alameda County Public Works Agency
Job Order Contracts at San Mateo County Department Of Public Works
Job Order Contracts at Santa Clara Valley Health & Hospital System
Ronald Dellums Federal Build Fire Alarm Replacement
Core Duties:
Evaluation and solution of potential field problems.
Plan and specification analysis in order to provide clear, concise and coordinated interpretations of the design/drawings for
construction.
Conduct quality control activities in accordance with instructions, inspection programs, using specified control measuring
and testing equipment.
Understand and perform document control functions in accordance with on-site policy and procedures.
Provide technical engineering information to company employees and subcontractors to ensure project complies with all
engineering standards, codes, specifications and design instructions.
Attend project coordination and owner/contractor/architect/engineer meetings as required.
Participate in the continuous updating and accurate generation of as-built documents, assist with the research and preparation
of field change requests to resolve design issues.
2010 - Present
Agbayani Construction Corporation –
Project Superintendent
Project Lists:
Whole Facility Repairs Training Barracks Bldg. 1152, Camp Parks Dublin
Carbonated Fuel Cell Project at Camp Parks
Fuel Cell at San Francisco State University
Core Duties:
Coordinates and supervises all construction activities.
Directs all field personnel to achieve completion of the project on schedule, within budget, with quality workmanship that
conforms to original plans and specifications.
Maintains construction schedule identifies and solves problems.
Orders materials and schedules inspections as necessary throughout the process.
Understands the project plans, specifications
Maintains positive relationships with customers, contractors, suppliers and other employees.
Prepare, schedules and supervises completion of a final punch list.
Promotes job site safety, encourages safe work practices and rectifies job site hazards immediately.
Ensures all company employees and contractors are adhering to the company safety policy.
Maintains an organized job site, including the construction office.
Past Experience:
2009 -2010
R & R Maher Construction Inc. Vallejo, CA
Carpenter Foreman
Chabot Elementary Oakland,CA
- layout and placement of footing, slab, curb, and walkway piers
Las Positas College Livermore, CA
- Layout and placement of retaining walls, building footing,slab,curb and overhang piers
Prewitt park Antioch, CA
- Layout and placement of radius retaining walls, building foundation and form and pour main stairs
2007 -2008
Core Concrete Construction Inc. Vacaville, CA
Carpenter
6465 San Pablo Emeryville, CA
- layout and placement of wall, column, curb, Ellis shore decking and edge forms
631 Folsom San Francisco, CA
- layout and placement of flyer tables, wall, column and edge forms
1314 Mc Kinstry Napa, CA
- Ellis shore decking, columns, Shotcrete walls and hanging forms
Lead Carpenter
Fabrication shop Oakland, CA
Fabricating and repairing wood and steel formwork
2001 -2007
PCL Civil Constructors Inc. Tampa, FL
Carpenter
Ft. Lauderdale Airport
Erection of temporary Tenser Systems wall and access ramp
Orlando, FL I-4/St Johns River Bridge
Pile Driving, excavation, form and pour footings, columns, column cap, set pre-cast beams, overhang jacks and pour
deck with Bidwell paver
Ft Lauderdale Airport
set precast beams, overhang jacks and pour deck with Bidwell paver
Carpenter Foreman
Pensacola, FL Garson Point Bridge
removal of Pour back, post tension inspection, install grout caps and Canusa heat shrink wrap at post tension duct
connections and nail holes, vacuum grout voids in post tension duct and seal pour backs with elastomeric paint
Port St. Lucie, FL Turnpike Bridge Deck Replacement
set up lane closure, layout and oversee subcontractors removing deck, painting steel beams and installing stay in place
metal decking, tie rebar, pour deck and remove lane closure
Stuart, FL Lions Bridge Casting Yard
Layout, welding and erection of rebar jig for segmental rebar cages
Keys, FL Overseas Highway
post tension inspection, install Canusa heat shrink wrap at post tension duct connections and nail holes, vacuum grout
voids in post tension duct and seal pour backs with elastomeric paint, repair and epoxy injection of segment joints of the
Niles, Seven mile, Long key and Channel 5 bridges
Palm Beach, FL PGA Blvd Bascule Bridge
form and poured main pier and pour stationary decks with Bidwell Paver
Palm Beach, FL I-95
set up lane closures, expansion joint repair and oversee striping sub
Applied Skills:
Bonded post tensioning Installer level 1-2 Ellis Systems shoring and column clamps
Grouting technician Cunningham/Efco systems
Florida advanced MOT training Gates system swing open columns
Epoxy Injection technician Symons forms
Hilti powder operated tools Bidwell pavers
Certified forklift operator Welding
Heavy equipment operation experience Rigging
Heavy concrete formwork Layout
Patent & Alumasystem forms Electrical and Plumbing