Post Job Free
Sign in

Construction Project

Location:
Pittsford, VT
Posted:
June 10, 2013

Contact this candidate

Resume:

Charles K. Cameron

** ******** **. **********, ** 01907 . 781-***-**** .

****************@*****.***

EDUCATION

Wentworth Institute of Technology, Boston, MA

2008

Bachelor of Science in Construction Management

Certification - OSHA 30 - Hour Completion

2008

CONSTRUCTION EXPERIENCE

Shawmut Design & Construction, Estimator, Boston, MA May

2012 - Present

> Lead entire effort in the bid process from development of trade

packages, invitation to bid to subcontractors, distribution of all

documents,

gathering and evaluation of sub quotes, to delivery of proposal to

client on

jobs ranging in value from $1M - $40 M

> Performed Quantity Takeoff, Value Engineering, Pricing efforts

for project

budgets on projects previously awarded to Shawmut Design and

Construction

> Developed budgets for General Conditions & General Requirements

with

PX's & Logistics plans to be submitted with proposals for bid jobs

> Developed RFI's from discrepancies in documents, lack of detail

of design, &

questions from subcontractors to provide direction to project

stakeholders

> Assisted in the development and mentoring of junior estimators

MOCA Systems, Project Engineer, Newton, MA

Salt Lake City Public Safety Building, Salt Lake City, UT

August 2011

> Lead estimator of the city's Police, Fire Dept., and City Hall office

May 2011

space budgeted at approximately $80 million in construction dollars

that February 2011

provides over 160,000 GSF of new construction with a 2 level

September 2010

underground parking structure at all four design phases, from concept

drawings through construction documents

> Managed a team of 5 estimators, conducted progress meetings, and

recorded and distributed the meeting agenda and minutes

> Estimated MEP systems, developed basis of estimate, received quotes

from vendors for local validation, and performed quality control for

all

other estimator's work to ensure project scope was captured

> Generated all quantities of the original conceptual estimate, building

the

estimate in Timberline with only 30 drawings and sketches and an 80

page

narrative

Fort Belvoir Community Hospital, Fort Belvoir, VA

April 2010 - July 2011

> 3-Year Initiative budgeted at approximately $1 billion and

Jan 2009 - Nov 2009

provides over 3.6 million SF of new construction

> Assisted in the development of an independent government

baseline estimate and that was updated as the design was finalized

> Evaluated change orders and assisted in negotiation of final prices

> Assisted in the negotiation of Firm Fixed Price subcontractors during

the definitization stage of the project

> Lead fact finding meetings with subcontractors to ensure the full

scope

of various changes had been captured because of undocumented

field conditions on items left out of the contract documents

> Lead quantity settlement meetings on change orders with large

discrepancy

In quantities and price with subs on changes that were pending because

a settlement could not be agreed upon after two attempts of

negotiation

Freedom Crossing Lifestyle Center, Fort Sam Houston, TX

November 2010

> Estimated the majority of a 15 building outdoor shopping center

totaling

over 450,000 SF of new construction awarded at $94.5 million

> Lead Estimator for 14 Tennant Fit-outs in the AAFES portion of the

of the outdoor shopping plaza buildings

> 35% Schematic Estimate that was estimated within 5% of the awarded

bid price with a 3 week turnaround time to the client

PERSEREC D.O.D. Office Tennant Improvements, Monterey, CA August

2010

> Estimator for a 22,565 SF Office Fit-out estimated at roughly $800 k

in construction costs

> Estimated all divisions of estimate from General Conditions/General

Requirements through electrical work

> Met a tight 2 day deadline so client could have an Independent

Government Estimate before bid time

> Developed Basis of Estimate report with project narrative for the

client

Utah Data Center, Camp Williams, Riverton UT Nov

2009- April 2010

> MILCON project budget of approximately $1.5 Billion including

2 substations, a 200 acre Early Earthwork Package, a 21 building

site including 4 Data Centers, and 6 generator buildings

> Responsible for building and maintaining a conceptual

parametric cost model for the Design/Build program

> Generated quantities using room data sheets containing room

sizes, MEP systems, finishes, and special requirements

> Built estimate using under 30 drawings, architectural narrative,

and weekly meetings with the design team to provide direction

Fort Lee Military Base, Fort Lee, VA

Aug 2008-Jan 2009

> 5-year, three-phase initiative budgeted at over $1.0 billion program

Aug 2007- Jan 2008

that will provide 2.0+ million SF of new construction

> Estimated 5 of the buildings on base ranging from a $20 million

Solider Support Center to $110 million LOGU solider school facility

> Performed quantity takeoff on a 330 acre site work package including

Cut/Fill, site utilities, site improvement, and pavements

> Conducted value engineering and constructability assessments for

cost / schedule control

Cranshaw Construction, Asst. Superintendent, Newton, MA

> Assisted Superintendents with daily activities such as

May 2007 - Sept 2007

daily construction and man power reports

May 2006 - Sept 2006

> Developed and completed punch lists for different sites

> Preformed layout with total station and auto level to ensure

multiple detention ponds were at the correct grade

> Assisted in directing subcontractors with field direction or

issues and provided technical assistance for all stakeholders

Groom Construction, Asst. Superintendent, Swampscott, MA

> Assisted working superintendent with layout and fixturing of tenant

June 2004 - May 2006

improvements for Best Buys, Home Depots, and Lowes

> Directed temporary labors used in selective demolition in Best Buy's

for new Magnolia Home Theater fit-out within the existing store

> Assisted in managing the punch list for a Best Buy new store Fit-out

in Destin, FL

> Managed several project scope items such as signage that was hung from

Ceiling that were nearly 30'tall and serpentine display cabinets for

various merchandise

Cameron Electric, Electrical Apprentice, Lynn, MA

> Interpreted electrical blue prints for residential construction

June 2001- May 2004

and assisted in the budgeting of the electrical work to be preformed

> Ordered specified materials for different residential jobs

> Used drawings to layout of electrical devices and light fixtures

> Roughed in and trimmed out outlets, lighting fixtures, and light

switches in residential buildings

TECHNICAL TRAINING

> Field Work - Surveying, Estimating, Scheduling,

Project controls, Value Engineering, Change Order Evaluations,

Time Delay Impact Analysis, and Print Interpretation

> Office Work- Primavera Project Planner, Prolog, Timberline,

Success Estimator, (MII) MCACAS Estimating System, Paces,

OnScreen Takeoff, Earthworks, RSMeans, Costworks, TRA-CER,

Richardson's Cost Data

> Microsoft Office Suite: Word, PowerPoint, Excel, Microsoft Project

AFFILIATIONS

Construction Management Association of America, Student Chapter

March 2006 - Aug 2008

Society of American Military Engineers (SAME)

March 2010 - Present

REFERENCES

Available upon request



Contact this candidate