RANDY SMITHWICK
Technical Minded ( Product Developer ( Innovative Problem Solver( Team
Leader
*** ******* ***** 651-***-**** mobile
Charlotte, NC 28211 **************@*****.***
LEAD ENGINEERING TEST TECHNICIAN ( MANUFACTURING PLANNER (
PRODUCT MANAGER
Providing 20 years of experience in manufacturing, product development and
testing. Quickly promoted at Donaldson to a leadership role after hire to
manage all scheduling for incoming tests to the Engine Air Lab. While at
Ergotron, earned a series of promotions from successful partnerships with
global manufacturing plants and internal/external customers.
Qualifications and experience include engineering testing and analysis,
product management, production scheduling and planning, concept design,
prototype fabrication and testing, production operations, and multi-
department collaboration in high-volume business environments.
Career includes accomplishments in automated life and fatigue testing
regarding prototypes, product integrity, production component analysis, and
production work order scheduling for a manufacturing department.
Instrumental in generating $15+ million in annual sales through focus on
product design, vendor relationships and negotiations, production
activities, and global product shipment. Thrive on the opportunity to
participate in product design processes.
Significant Qualifications Also Include:
Project Coordination and Vendor Negotiations and Cross-functional Team
Management Relationships Collaboration
New Product Testing and Product Order Fulfillment Test Plan Development
Analysis Technical Inspections Vendor Quality Audits
Product and Project Metal Fabrication Prediction Model Data
Management Development
Engineering Prototypes
CAREER EXPERIENCE
DONALDSON COMPANY, INC. - Bloomington, MN 2009-2013
A leading worldwide provider of filtration systems and replacement parts,
serving customers in the industrial and engine markets, including dust
collection, power generation, specialty filtration, compressed air
purification, off-road equipment, industrial compressors, heavy trucks and
light vehicles.
AIR LAB ENGINEERING TEST TECHNICIAN
Lead Technician in the Engine Air Lab - Provide testing support for other
technicians, Selected to represent Engine Air Lab on the Donaldson EHS
(Environmental Health & Safety) Committee, Orientation and training of
new employees, Liaison between corporate technology engineering dept and
engine air lab, Manage all scheduling of all incoming work/testing across
all shifts
Leadership results:
< Workload increases from 890 tests/mo in 2011 to 1507/mo in 2012 to
1800/mo in 2013
< Test turn around time decrease from 6 business days to 4
< 100% increase in workload while 33% decrease in lead time
< Co-led and implement the start of a 3rd shift
< Developed test plans per ISO 5011 specifications
< Lead a weekly integration meeting for engineering managers to provide
forecast visibility for Air Lab
< Lead daily meetings with other shift technicians to discuss
ongoing/upcoming work load
< Provide testing support for engine air products
< Improved lab safety rating from 82% to 94% during tenure (EHS)
< Co-led 6S Kaizen organization of the Engine Air Lab
ERGOTRON, INC. - Eagan, MN 1992 to 2009
30 year old company that designs and manufactures ergonomic mounting and
mobility product for computer monitors, notebooks, and large flat panel TVs
as well as mounting solutions.
ENGINEERING TEST TECHNICIAN (2005 to 2009)
Member of the Engineering Department in charge of life cycle and fatigue
testing across all product lines, test prototypes and fixture
development, test result analysis, making recommendations to colleagues
for product improvements, and documenting results through reports. Worked
in a test laboratory and machine shop environment to perform testing on
flat panel monitor mounts, wall and desk mount systems, TV wall mounts,
mobile computer carts, and other products.
Collaborated with Product Management, Engineering, and Marketing Teams
regarding product redesigns, product manufacturing, sales tools,
competitive and market analysis, and consumer needs evaluations.
< Teamed with colleagues to start up a new Engineering Test Lab and
increased tests from 60 to 400 per year to ensure high-quality product
performance.
< Contributed to design process cycle improvements, and saved thousands
of dollars in vendor costs by fabricating new prototypes.
< Helped sales increase 5% by initiating a competitive product analysis
system tool for the sales team.
< Selected to work with colleagues and establish a new test lab for a
plant in China that became successful.
< Frequently received recognition from executives for contributions in
outstanding product designs.
CUSTOM PROJECT COORDINATOR (2002 to 2005)
Earned promotion to plan and oversee all custom project initiatives
involving the design, cost, price, scheduling, production, and shipment
of products to customers. Fast-paced position focused on resource and
project planning, kick-off meeting leadership, project milestones
development, vendor evaluation and selection, vendor contract
negotiations, customer needs requirements and communications, and
internal and external stakeholder relationships. Also, accountable for
project management for multiple departments, weekly meetings, budget
management, and customer relationships.
< Directed more than 75 projects in three years, and helped the sale of
customized projects rise from $3 million to $10 million.
< Instrumental in generating $5+ million in sales by managing NEMA
compliance regarding clean room applications.
< Led several high-revenue, customized monitor mounting projects that
delivered more than $3 million throughout the life of project.
< Catalyst in pushing on-time customer shipment rates from 89% to 99.3%
in a three-year period.
< Ensured project success by working effectively with Engineering,
Purchasing, Production, and Sales Groups.
PRODUCTION CONTROL COORDINATOR (1999 to 2002)
Designed an effective production schedule for the Manufacturing
Department, and interacted with Purchasing, Manufacturing, and Customer
Service Groups to coordinate activities and ensure products were sent to
customers on time. Collaborative effort solidified customer relationships
and the corporate brand. In control of customer shipment expediting, work
load development, inventory management, daily staff meetings, and multi-
department relationships.
< Lowered customer shipment lead time by three days, and boosted on-time
shipments 15% through successful manufacturing workflow processes.
< Saved company $40,000 per year by accelerating efficiency levels and
avoiding the need to hire a second employee.
QUALITY ASSURANCE TECHNICIAN (1995 to 1999)
Conducted comprehensive technical inspections on inbound products and
performed vendor audits. Accountable for ensuring product consistency
from product plan to final product stage, inspecting components, and
returning any defective products to vendors for changes.
< Co-developed a new vendor audit program that subsequently contributed
to a higher quality customer product. Successful in pushing product
acceptance from multiple vendors to 96%.
< Developed strategies to improve product manufacturing processes and
lowered component costs by working closely with the Engineering
Department and vendors.
< Strengthened business relationships with multiple vendors by
effectively communicating information regarding product designs.
MANUFACTURING ASSEMBLER (1992 to 1995)
TECHNOLOGY
MS Word ( Excel ( PowerPoint ( Access ( ROI Systems ( Oracle ( SAP (
SolidWorks Viewer ( TOPAS ABP (
( LIMS (Lab Information Management) ( SharePoint (
EDUCATION
University of Phoenix, Bachelor of Arts in Business Administration, 2012-
present