Post Job Free
Sign in

Maintenance Manager

Location:
Mount Prospect, IL, 60008
Salary:
80,000.00
Posted:
June 09, 2013

Contact this candidate

Resume:

Timothy Dawe

847-***-****

abxqyz@r.postjobfree.com

As a seasoned maintenance and facility manager, I have been tactically

involved in accomplishing machine reliability and production goals, cutting

overhead costs, and keeping safety at the forefront. Using best practices

to aid in the overall plan to improve operational efficiency and to lower

the budget cost of maintenance activity.

Murphy Machine Products

2012

Maintenance Manager

. Responsible for writing and scheduling preventative, proactive, and

emergency maintenance procedures

. Responsible for performing spot checks of PMs.

. Supervise facility maintenance

. Manage parts storage area

. Responsible for maintenance personnel work schedules, employee

performance mentoring and evaluations; fostering continuous

improvement throughout the facility

Wm. W. Meyer and Sons 2012

Supervisor, Assemblies

. Supervise personnel in the assembly and manufacturing of industrial

feeder valves

. Responsible scheduling daily work orders and procedures pertaining to

same

Ampac Flexible Packaging

2011

Maintenance Manager

. Managed maintenance and facility personnel of twenty-four-six (24-6)

flexible packaging manufacturer

. Responsible for writing and scheduling preventative, proactive, and

emergency maintenance procedures

. Assigned maintenance personnel work orders for completion

. Oversaw the moving, shipping, and installation of production machinery

to new facility

. Established guidelines for chilled water, electrical supply,

compressed air and tooling

. Developed new production tooling CAD drawings for manufacturing quotes

. Oversaw the move of machines from older facility to the new location

. Worked hands on with the maintenance team when necessary

Temple Inland 2010 - 2011

Maintenance Planner/Boiler Room Technician

. Responsible for providing a pathway to complete maintenance work by

planning, estimating/scoping, and coordinating maintenance work orders

. Identified required skill set, special tools, outside labor, parts and

materials and required time to perform maintenance task

. Understood and developed the critical path for each jobs completion

. Daily boiler room, starch room, and waste water treatment

responsibilities

Aflac

2009

Sales Associate

. Sales of assurance plans for individuals, groups, and families

Fortner Graphic Solutions Inc. 2007 -

2008

Mid-Central Sales Manager

. Sales of printing press re-manufacturing on customer's site or in the

Nevad, MO facility; printing press cylinder re-manufacturing

. New Press installations, re-locations, piping and electrical

Vertis Communications 2000 - 2007

Facility/Maintenance Manager

. Managed facility and press room maintenance staff at a round-the-clock

100,000sqf offset web printer of newspaper advertising materials, and

80,000sqf paper storage warehouse

. Responsible for daily operations, including web press maintenance and

preventative maintenance scheduling

. Completed re-writing, entering, and editing preventative, predictive,

and proactive maintenance tasks and procedures using PMC 2000 and

Microsoft Office software for EVERY piece of equipment in facility

. Responsible for maintenance personnel work schedules, employee

performance mentoring and evaluations; fostering continuous

improvement throughout the facility

. Performed continuous updating and revising Auto CAD drawings relating

to press lay-out, press parts, building, and office renovation and

expansion

. Developed work flow analysis study to restructure suitable work space

that will maximize productivity and minimize injuries

. Worked as a key member of division safety program while writing

emergency evacuation procedures with graphics, along with re-

structuring the safety program with emphasis on machine guarding and

using the "5S" program

. Scheduled and designed upgrades and retrofits of existing equipment

with our engineering division

. Worked closely with all vendors during press rebuilds, re-locations,

and concrete floor "pad" reconstruction, research, compare, and order

auxiliary equipment needed to keep press room fully functioning,

solving equipment problems 24-7 which enabled our production

department to meet crucial deadlines; facility maintenance

. Managed the installation of security system (main facility and

warehouse) with keyless door access and video surveillance

. Developed the ROI and managed the installation of regenerative thermo

oxidizer to cut gas consumption in pollution control device

. Developed the ROI and managed the installation of heat exchanger on

pollution control device to heat building and cut energy costs

. Managed the installation of WMS at the 80,000sqf paper storage

warehouse

. Oversaw the installation of the chilled water (60degrees) upgrade-400

tons

. Implemented bar coding in the press room and maintenance parts area to

track incoming and outgoing parts inventory

. Implemented Brady lock out/tag out system in the maintenance and

pressroom departments for a safer work environment and to assist with

better preventative maintenance practices

. Kept the maintenance department budget under projected figures six (6)

years straight

Graphic Innovations Inc. 1993 -

2000

Project Coordinator

. Coordinator of multiple crews in repair, unit swap, rebuild and turn-

key installation of a variety of printing presses, including Harris,

Hantscho and Goss, throughout the U.S. and abroad

. Responsible for generating project Gantt Charts (MS Project) for in-

house and customer tracking as well as generating and updating

precision Auto Cad drawings of each press layout for its installation

. Worked on all aspects of work scheduling; ordering and set up,

purchase and delivery of required auxiliary equipment and parts

. Coordinated all shipping and crating of equipment and all travel and

lodging as well as scheduling of subcontractors and quality of work

performed on-site during installations

. Worked as a direct liaison with customer from initial tear down of

press to and including start-up, test printing and production, as well

as trouble-shooting, tracking and follow-up of warranty issues

Shop Supervisor

. Supervised the rebuilding of offset web printing presses in shop or at

customer's facility; installation of rebuilt presses through precision

aligning, leveling and tramming; start-up, test printing and putting

same in production of quality four-color material

Goss International 1983 -

1992

Field Service-Folder Specialist

. Over saw three (3) Colorliner, twenty-four (24) unit press

installations (approx. 2000 tons each press) at the Los Angeles Times

manufacturing plants

. Managed vendor and engineering installations, as well as start-up and

troubleshooting problems with these installations

. 160- and 144-page folders; repair, re-time and set-up for turn-key

installation

. Hands on involvement with engineering department in installation of

keyless inking system on four-high Colorliner unit

Field Service-Machinist Erector

. Colorliner, Headliner and Metroliner; repair, rebuild, re-time for

turn-key new installations

. Assembly and rework C-500 and C-700 units and folders

. Assembly, rework as per engineering and print-test prototype; C-500

four-color press

. Build and rebuild as per R&D engineering; C-500 folders and quarter-

folders

. Field Service of and R&D of C-500 units and folders

. Gear cutting; hobbing; shaping and straight bevels: cam milling and

grinding

Education

University of Wisconsin - Madison School of Business

William Rainey Harper College

College of DuPage

IMEC Lean Manufacturing- Chicago

JF Kennedy - High School Diploma



Contact this candidate