Timothy Dawe
*****@***.***
As a seasoned maintenance and facility manager, I have been tactically
involved in accomplishing machine reliability and production goals, cutting
overhead costs, and keeping safety at the forefront. Using best practices
to aid in the overall plan to improve operational efficiency and to lower
the budget cost of maintenance activity.
Murphy Machine Products
2012
Maintenance Manager
. Responsible for writing and scheduling preventative, proactive, and
emergency maintenance procedures
. Responsible for performing spot checks of PMs.
. Supervise facility maintenance
. Manage parts storage area
. Responsible for maintenance personnel work schedules, employee
performance mentoring and evaluations; fostering continuous
improvement throughout the facility
Wm. W. Meyer and Sons 2012
Supervisor, Assemblies
. Supervise personnel in the assembly and manufacturing of industrial
feeder valves
. Responsible scheduling daily work orders and procedures pertaining to
same
Ampac Flexible Packaging
2011
Maintenance Manager
. Managed maintenance and facility personnel of twenty-four-six (24-6)
flexible packaging manufacturer
. Responsible for writing and scheduling preventative, proactive, and
emergency maintenance procedures
. Assigned maintenance personnel work orders for completion
. Oversaw the moving, shipping, and installation of production machinery
to new facility
. Established guidelines for chilled water, electrical supply,
compressed air and tooling
. Developed new production tooling CAD drawings for manufacturing quotes
. Oversaw the move of machines from older facility to the new location
. Worked hands on with the maintenance team when necessary
Temple Inland 2010 - 2011
Maintenance Planner/Boiler Room Technician
. Responsible for providing a pathway to complete maintenance work by
planning, estimating/scoping, and coordinating maintenance work orders
. Identified required skill set, special tools, outside labor, parts and
materials and required time to perform maintenance task
. Understood and developed the critical path for each jobs completion
. Daily boiler room, starch room, and waste water treatment
responsibilities
Aflac
2009
Sales Associate
. Sales of assurance plans for individuals, groups, and families
Fortner Graphic Solutions Inc. 2007 -
2008
Mid-Central Sales Manager
. Sales of printing press re-manufacturing on customer's site or in the
Nevad, MO facility; printing press cylinder re-manufacturing
. New Press installations, re-locations, piping and electrical
Vertis Communications 2000 - 2007
Facility/Maintenance Manager
. Managed facility and press room maintenance staff at a round-the-clock
100,000sqf offset web printer of newspaper advertising materials, and
80,000sqf paper storage warehouse
. Responsible for daily operations, including web press maintenance and
preventative maintenance scheduling
. Completed re-writing, entering, and editing preventative, predictive,
and proactive maintenance tasks and procedures using PMC 2000 and
Microsoft Office software for EVERY piece of equipment in facility
. Responsible for maintenance personnel work schedules, employee
performance mentoring and evaluations; fostering continuous
improvement throughout the facility
. Performed continuous updating and revising Auto CAD drawings relating
to press lay-out, press parts, building, and office renovation and
expansion
. Developed work flow analysis study to restructure suitable work space
that will maximize productivity and minimize injuries
. Worked as a key member of division safety program while writing
emergency evacuation procedures with graphics, along with re-
structuring the safety program with emphasis on machine guarding and
using the "5S" program
. Scheduled and designed upgrades and retrofits of existing equipment
with our engineering division
. Worked closely with all vendors during press rebuilds, re-locations,
and concrete floor "pad" reconstruction, research, compare, and order
auxiliary equipment needed to keep press room fully functioning,
solving equipment problems 24-7 which enabled our production
department to meet crucial deadlines; facility maintenance
. Managed the installation of security system (main facility and
warehouse) with keyless door access and video surveillance
. Developed the ROI and managed the installation of regenerative thermo
oxidizer to cut gas consumption in pollution control device
. Developed the ROI and managed the installation of heat exchanger on
pollution control device to heat building and cut energy costs
. Managed the installation of WMS at the 80,000sqf paper storage
warehouse
. Oversaw the installation of the chilled water (60degrees) upgrade-400
tons
. Implemented bar coding in the press room and maintenance parts area to
track incoming and outgoing parts inventory
. Implemented Brady lock out/tag out system in the maintenance and
pressroom departments for a safer work environment and to assist with
better preventative maintenance practices
. Kept the maintenance department budget under projected figures six (6)
years straight
Graphic Innovations Inc. 1993 -
2000
Project Coordinator
. Coordinator of multiple crews in repair, unit swap, rebuild and turn-
key installation of a variety of printing presses, including Harris,
Hantscho and Goss, throughout the U.S. and abroad
. Responsible for generating project Gantt Charts (MS Project) for in-
house and customer tracking as well as generating and updating
precision Auto Cad drawings of each press layout for its installation
. Worked on all aspects of work scheduling; ordering and set up,
purchase and delivery of required auxiliary equipment and parts
. Coordinated all shipping and crating of equipment and all travel and
lodging as well as scheduling of subcontractors and quality of work
performed on-site during installations
. Worked as a direct liaison with customer from initial tear down of
press to and including start-up, test printing and production, as well
as trouble-shooting, tracking and follow-up of warranty issues
Shop Supervisor
. Supervised the rebuilding of offset web printing presses in shop or at
customer's facility; installation of rebuilt presses through precision
aligning, leveling and tramming; start-up, test printing and putting
same in production of quality four-color material
Goss International 1983 -
1992
Field Service-Folder Specialist
. Over saw three (3) Colorliner, twenty-four (24) unit press
installations (approx. 2000 tons each press) at the Los Angeles Times
manufacturing plants
. Managed vendor and engineering installations, as well as start-up and
troubleshooting problems with these installations
. 160- and 144-page folders; repair, re-time and set-up for turn-key
installation
. Hands on involvement with engineering department in installation of
keyless inking system on four-high Colorliner unit
Field Service-Machinist Erector
. Colorliner, Headliner and Metroliner; repair, rebuild, re-time for
turn-key new installations
. Assembly and rework C-500 and C-700 units and folders
. Assembly, rework as per engineering and print-test prototype; C-500
four-color press
. Build and rebuild as per R&D engineering; C-500 folders and quarter-
folders
. Field Service of and R&D of C-500 units and folders
. Gear cutting; hobbing; shaping and straight bevels: cam milling and
grinding
Education
University of Wisconsin - Madison School of Business
William Rainey Harper College
College of DuPage
IMEC Lean Manufacturing- Chicago
JF Kennedy - High School Diploma