GLENN M. MONTAUS
Doha, Qatar
Mobile No.: +974-********
Email: ************@*****.***
Position Applied For: QA/QC Engineer / Site Engineer
SUMMARY OF QUALIFICATIONS:
Completed Bachelor of Science in Civil Engineering, holder of Philippine
Professional Regulation Commission Number 0079687, member of Philippine
Institute of Civil Engineers (PICE), Computer Literate and capable to
operate MS Office - Word, Excel, Auto Cad Software.
With 12-years of proven engineering experience in civil and infrastructure
such as: roadworks, earthworks, surface water drainage, sewerage,
waterlines, buildings, and bridges. Can perform the following task such as
as project management, supervision, monitoring, inspection, quality
control, planning, coordination, estimates and documentation. handled
various critical and challenging projects. Good exposure to latest
Engineering tools and techniques. Have excellent communication and
management skills with ability to work independently or in a team. Capable
of strong communication, influencing, presentation and negotiation skills.
In good health, sight and hearing.
SEMINAR AND TRAINING:
CONSTRUCTION METHODS AND MATERIALS QUALITY CONTROL
DPWH - Region XIII, Office of the District Engineer, Bislig, Surigao del
Sur
July 24 to 25, 1997
INTEGRATED QUESH ANNUAL SEMINAR
Leighton Contractors ( Asia ) Ltd., LCAL - MNTP Information Center, Manila,
Philippines
November 24, 2003
SAFE WORK IN CONFINED SPACES
Bilfinger Berger, Doha Expressway Project, State of Qatar
February 28, 2007
SEMINAR ON PROJECT MANAGEMENT-PLANNING AND SCHEDULING - PRIMAVERA (With
Computer Application)
Philippine Institute of Civil Engineers, Qatar Chapter, State of Qatar
October 12 - November 02, 2007
SEMINAR ON BASIC QUANTITY SURVEYING
Philippine Institute of Civil Engineers, Qatar Chapter, State of Qatar
December 07, 2007
WORK EXPERIENCES:
Position : QA/QC Engineer
Assignment : Lusail Expressway, New six bay, doha international airport, Doha Expressway Project,Conversion of Tadamoun R/A &
Mall R/A to signalized junction
Location : Doha, State of Qatar
Sponsor : Boom Construction Company
Duration : From March 02, 2011 up to present
Duties & Responsibilities:
Responsible for all QA/QC related matters. Ensures that the Quality Plan is
understood by all personnel in the organization and those requirements are
implemented and maintained. Monitors and ensures the implementation of
quality control procedures. Responsible for the quality of materials
supplied and used for the construction activities. Monitors all activities
on site and raises non-conformance report when applicable. Coordinate with
the inspectors for the inspection of activities. Prepare RFI's and site
daily activity reports.
Position : SITE SUPERVISOR
Assignment : Doha Expressway Project - Package 1 & 2
Location : Doha, State of Qatar
Sponsor : Bilfinger Berger
Duration : From July 27, 2006 to August 31, 2009
Scope of works:
The works under this project comprises the upgrading of 6 km long section
of existing main road including the construction of new highway with
bridges and underpasses, infrastructure works and landscaping.
Duties & Responsibilities:
Responsible in project supervision and management for infrastructure works
such as Surface Water, Foul Sewerage, TSE and Water works (Materials used
VC pipes, Glass Reinforced Pipes, Ductile Iron pipes for Rising, HDPE for
TSE and Ductile Iron Pipes for Waterlines, the pipes are ranging from 80 mm
to 2000 mm in diameter. Monitoring the daily activity works and take off
the quantity of progress on site including the progress of microtunnelling
works. Take off the quantity of pipes and fittings for SW, FS, TSE and
waterlines. Prepare RFI's prior for site inspection and have a joint
inspection w/ site inspectors prior for approval of the said works. Arrange
the daily progress of SW, FS, TSE and water works according to approve
RFI,s. Technical and logistic support to Section / Operation Manager.
Supervise the Sub Contractors daily works and activities. Assist sub
contractors in site supervision and management. And ensures that all work
are carried out in accordance with the established specifications and
standard safety measures to avoid loss or damage during project execution.
Position : QA/QC ENGINEER
Assignment : SUBIC CLARK TARLAC EXPRESSWAY PROJECT
Location : Pampanga, Philippines
Sponsor : KAJIMA CORPORATION
Duration : From December 2, 2005 to July 10, 2006
Duties and Responsibilities:
Responsible in controlling the quality of works for the earthworks
activities. Responsible of the soil testing such as, proctor, soil
classification and field density test in each layer of embankment, sub
grade, base coarse and asphalt, using DENSITY/MOISTURE GAUGE.Responsible of
materials sampling and quality test. Responsible for reviewing all quality
records on site and retaining them in handover files. Compiling quality
related procedures, documentation to all testing activities in field and
laboratory Site inspection to all activities prior for joint inspection by
client representative.Co-ordinate and review the procedures, Method
Statements and Inspection & Test Plans submitted by construction sub-
contractors.
Position : FIELD ENGINEER
Assignment : FIRST PHILIPPINE INDUSTRIAL PARK
Sponsor : First Balfour
Location : Batangas, Philippines
Duration : From Aug. 27, 2005 to November 30, 2005
Duties and Responsibilities:
Supervise the construction of Storm Drainage System such as RCP laying,
construction of drop manholes & street inlets. And Responsible in
supervising the road works and concreting activities.
Perform safety Implementation & Quality Control.
Position : FIELD ENGINEER
Assignment : Bohol Circumferential Road Improvement Project, Under
Arterial Road Links Development Project Contract Package 2
Sponsor : C.M. Pancho Inc.
Location : Bohol, Philippines
Duration : From March 2005 to Aug. 6, 2005
Duties and Responsibilities:
Supervise in the construction of Roads & Structures such as Shore
Protection/Rubble Concrete, Masonry Retaining Wall, RCBC and Grouted Riprap
Slope Protection. Responsible in preparation for daily work activities,
submit daily work accomplishment and daily work activity cost. Assist the
Project manager/engineer in technical and logistic support. Assist also in
project management and occupational health and safety management.
Position : QA ENGINEER / SITE ENGINEER
Assignment : MANILA NORTH LUZON TOLLWAYS, MNTC
Sponsor : Leighton Contractors Asia Limited
Location : Barangay Tibag, Pulilan, Bulacan, Metro Manila,
Philippines
Duration : From November 2003 to January 29, 2005
Duties and Responsibilities:
Prepare QA/Qc documents such as filing of Work point notification, Review
points, Hold points and laboratory test results to ensure that the
verification process using ITP's prevents non-conforming work being handed
over to the client and that the works meet the specified standards.
Witness all testing in field and in laboratory and ensure that the ITP will
be follow accordingly. Monitor works implemented by the construction and
ensure that all activities must be in accordance with project specification
and drawings.
Site supervision of activities such as earthworks (embankment), drainage
system, reticulation works for F.O.E. (Fixed Operating Equipments),
communication and electrical ducts of the north Luzon toll ways mainline,
toll plaza's and interchanges. Construction of external facilities
(footings and pedestal) for F.O.E.(Fixed Operating Equipments), road
lightings, concreting of F.O.E. cable tray on bridges and construction of
bridge median parapets, repair of bridge structures and sandblasting and
painting of bridge steel structures. And ensure that all construction
activities comply with the drawings, technical specification and other
contractual obligations. Implement inspection and testing in accordance
with the LCAL Quality management plan and minimize non-conformances under
the quality management plan.
Position : PROJECT ENGINEER
Assignment : Catanauan - Mulanay Road Project
Sponsor : Mancon berhad - CBDC
Location : Quezon, Philippines
Duration : From September 11, 2002 to February 2003
Duties and Responsibilities:
Assist the project manager in field supervision and management.
Particularly supervise the Cement Treated Base works (CTB) and Portland
cement concrete Pavement works (PCCP), responsible in preparing of quantity
surveying report or monitoring report, accomplishment report and billing.
Position : FIELD ENGINEER
Assignment : MALAMPAYA ONSHORE GASPLANT / FOSTER WHEELER
Sponsor : First Philippine Balfour Beatty / FOSTER WHEELER
Location : Shell Refinery, Batangas City, Philippines
Duration : From April 13, 2001 to October 21, 2001
Duties and Responsibilities:
Supervise the construction daily project activities in Civil Infrastructure
projects covering bridge, roads, water supply networks, Drainage Networks
and facilities.
Position : DISTRICT ENGINEER
Assignment : Maynilad Water Services Incorporated, MWSI - NRW Project
Sponsor : First Philippine Balfour Beatty
Location : Manila, Philippines
Duration : From May 17, 2000 to March 31, 2001
Duties and Responsibilities:
Supervision of construction activities such as pipe laying works,
interconnections, leak repairs and metering works. Prepare daily works
schedule. Monitor field works and activities. Perform safety
implementations. Responsible in withdrawal of materials and materials take
off. Technical and logistic support to the construction manager. Prepare
manpower distribution, equipments and work schedule.
Position : FIELD ENGINEER
Assignment : SAN ROQUE MULTIPURPOSE PROJECT / RAYTHEON EBASCO
OVERSEAS LTD
Sponsor : First Philippine Balfour Beatty
Location : Pangasinan, Philippines
Duration : From November 12, 1999 to May, 2000
Duties and Responsibilities:
Supervise the erection of two units buildings, pipe laying works,
installation of fire hydrants motor pump including the construction of the
underground pump house of the operators Village Fire Water System. Prepares
planning and scheduling of manpower, materials, equipments and prepares bar
cutting list and estimates of the underground pump house. Coordinate with
costumer regarding the changes of the projects plan, specification and
schedules. Perform safety implementations.
Position : FIELD ENGINEER
Assignment : PROCTER AND GAMBLE PHILS / FLOUR DANIEL PHILLIPINES
Sponsor : First Philippine Balfour Beatty
Location : Laguna, Philippines
Duration : From July, 1999 to November, 1999
Duties and Responsibilities:
Supervision and monitoring works for the erection of 4 - units silo.
Supervise the fabrication and installation of rectangular chute, stainless
bins and assist testing and commissioning of powder pipelines.
SCHOLASTIC RECORDS:
COLLEGE
Father Saturnino Urios University, Butuan City
Bachelor of Science in Civil Engineering 1996. Licensed, 1997
HIGH SCHOOL
Diatagon Catholic High School
Diatagon, Lianga, Surigao del Sur
ELEMENTARY
Diatagon Central Elementary School
Diatagon Lianga, Surigao del Sur
PERSONAL DETAILS:
Birth Date : August 19, 1973
Birth Place : Surigao
Height : 5'6"
Weight : 148 lbs.
Sex : Male
Status : Married
Citizenship : Filipino
Address : Block 43 Lot 5 Mabuhay City Subd. Paliparan lll
Dasmarinas, Cavite, Philippines
Driving License : Doha, Qatar Valid Driving License
I certify under the laws of perjury, the above information are true and
correct.
GLENN M. MONTAUS
Civil Engineer