Geoff Blakey, Superintendent / OSHA *** Outreach Trainer / STS / QCM

***********@***.*** 760-***-****

Geoff Blakey has worked in the construction industry for 15 years as a Superintendent, Construction Quality Control Manager,

Certified Safety Trained Supervisor / Site Safety Health Officer OSHA 500, 10 hour and 30 hour trainer, Storm Water

Management Compliance Inspector, ECATTS certified. Mr.Blakey is responsible for the establishment and execution of the

project Schedule/Quality Control/Safety requirements and for ensuring construction is in accordance with plans, specifications

and all applicable building codes. As Superintendent / Quality Control Manager / SSHO he conducts detailed, frequent project

inspections, at all levels to ensure high quality construction. Daily reports as required and in coordination with the government

inspectors, he also finalizes all projects for final delivery and turnover. Safety compliance is priority and environmental issues

paramount in completing projects efficiently professionally and successfully.

Richard Brady & Associates

(August 2011 to May 2013)

Past Experience

Title: Superintendent. / SSHO

Client: NAVFAC Southwest

Marine Corp Base Camp Pendleton, area 52, Construct HDPE waterline 8”inch piping N62473-12-D-3004/0010.

This project has required standard G-25 trenching for CPR requirements and directional drilling on a portion of this project to

bore and sleeve through existing 10” steel pipe, installed 2 fire hydrants for fire suppression at new gas station 5270 and a future

connection for STP (sewer treatment plant) 11. Currently he has been working on several new gas stations on Camp Pendleton

with utility support.

Marine Corp Base Camp Pendleton, area 33. Replace PVC gas line with HDPE 6 “ piping. / N62473-12-D-3004/002

This is a JOC (Job Order Contract) for Joint Venture BRADY/GCE $4,000,000. ROICC NAVFAC Southwest is overseeing this

construction. Environmental services have an emergency categorical exclusion and a removal of a leaking gas valve was

completed and progress is on schedule Project completed 1/27/2013. Received Safety STAR Award.

Title: Superintendent / SSHO

Client: Miramar NAVFAC/ MCRD Facilities.

Marine Corps Recruiting Depot (MCRD) San Diego - Replace Inadequate Gas Main Line Piping / N62473-11-C-0419

Completed 4/19/2012. Received Safety STAR Award.

This Project consists of installation of 6 inch Polyethylene Pipe and fittings 5000 Lineal feet, with additional valves. All work

complies with UFC, UFGS Specifications for Public Works Construction. The final contract amount $ 2.500.000.

Title: Superintendent / QCM / SSHO.

Client:: NAB (Naval Amphibious Base) NAVFAC Coronado.

Naval Amphibious Base Hotel SD, Sewer Lateral Remove and Replace (9-1-11 thru 11-1-11). Contract N62473-09-C-041

Received Safety STAR Award.

1

Title: Superintendent / SSHO.

Client: NAVFAC Southwest MCB CP

Amphibious Assault Headquarters Building (10/2009-7/2011) This Project was ARRA Funded.

MCB Camp Pendleton (Del Mar Beach)

This project consisted of the demolition and renovation of an existing school (Contract No. N6858964-16-0002). The final

contract amount was $6,400,000.

Title: Safety Officer SSHO/STS

Client:: NAVFAC Southwest MCB CP

Bachelor Enlisted Quarters (P-206/P-028) and Enlisted Dining Facility (6/2008-10/2009)

Received Safety STAR Award.

Client: MCB Camp Pendleton (MARSOC)

Title: Superintendent /SSHO

This project consists of the design-build of new Bachelor Enlisted Quarters (P-206/P-028) and also an Enlisted Dining Facility

(Contract No.N62473-07-C-6036). The BEQs are roughly 68,620 sf, multi-story masonry buildings. The Enlisted Dining Facility

is a single-story, 22,000 sf masonry building with a standing seam metal roof. The final contract amount was $43,747,265

(EST.).

Los Angeles South West City College (6/2007 to 6/2008)

Multiple Buildings, Stadium, Police Station, Harper Construction/contract value was $80,000,000.

Title: Superintendent, SSHO,

Client: CCDC

Park side Terrace (1/2007-6/2007) Harper Construction/contract value $ 27.000.000.

Park side Terrace is a mixed-use project 7 story building located in downtown San Diego. It is comprised of 77 affordable

housing rental units, 700 SF of retail space, and the East Village Community Church. The housing portion of the project will have

an indoor community center, a computer room, common laundry facilities and an outdoor community terrace with play-

equipment. The East Village Community Church will have 300 seats, in a vaulted sanctuary featuring an iconic stained glass

cross at the corner of 14th St. & Island Avenue. The project received LEED Platinum under the USGBC Homes Pilot Program.

Renovation of Existing Bachelor Enlisted Quarters 1423, 1443 & 1607 (9/2006-12/2006) Outstanding Evaluation.

Client: MCAGCC, Twenty-nine Palms, CA.

Title: Site Safety & Health Manager / QC Manager

This project was design-build. The base bid item 0001 work included the rehabilitation of BEQ Buildings 1423 & 1443 (Contract

No.: N68711-02-D-8014 (DO #011). The scope of work included the removal and replacement of doors and finishing of

hardware, floor finishes, interior painted surfaces, window coverings; power and interior lighting, telephone/data outlets, HVAC

systems, and incidental related work. The base bid Item 0002 included the renovation of BEQ Building 1607. The scope of work

included the replacement of roof-mounted exhaust fans, hose bib vacuum breakers, HVAC modifications, heating hot water heat

exchanger, water heater, re-insulation of hot water piping, drainage piping, door hardware, card reader system, electrical,

painting, and cleaning and sealing of exterior block. The total square footage for this project was 236,445 sf. The final contract

amount was $4,997,265 (EST).

Aloft on Cortez Hill (2006-2007)

Client: San Diego Contractor Oliver & McMillan.

Title: Superintendent

Aloft of Cortez Hill project 7 stories building is comprised of loft-inspired residences architecturally configured in platform lofts,

one bedroom, one bedroom plus a loft and two-bedrooms ranging in size from 575 square feet to 1,175 square feet. Aloft

condominiums are arranged within a low-rise, five-story building. Each home includes state-of-the-art stainless steel appliances,

2

laminated wood flooring, floor-to-ceiling windows, private balconies, fine granite countertops and climate controlled HVAC.

Homeowner amenities include an elegant lobby area, a resort-style lounge pool with cabanas, an outdoor sunning patio, a

courtyard highlighted with a fire pit, a fitness center with top-of-the-line gym equipment, underground parking and controlled

building access using state-of-the art security cards. The 2-level garage is 68,600 sf; the 5-story building is 132,000 sf; the total

square footage is 200,600. The final contract amount was $26,401,820 (EST).

CENTEX HOMES, INC.

(July 2004 to August 2006)

Title: Quality Control Manager / Superintendent

Mr. Blakey was involved in all aspects of production home building. He was responsible for building inspections, code

compliance, and homeowner customer satisfaction and walk-throughs. He developed and monitored SWPPP and Safety

Programs for environmental and OSHA compliance. Awarded SHARP Award for OSHA compliance 2006.

J.P. RHOADES DEVELOPMENT

(December 2002 to July 2004)

Title: Quality Control Manager / Superintendent

Mr. Blakey was responsible for on-site and off-site construction and production. He processed all permits, approvals, and

Building inspections. He also developed and monitored SWPPP and NSPDS programs for environmental compliance.

BEAZER HOMES, INC.

(June 1998 to December 2002)

Title: Quality Control Manager / Superintendent

Mr. Blakey served as a field manager for production residential projects for a large, national homebuilder. He was responsible for

building inspections, code compliance, and homeowner customer satisfaction and walk-throughs.

LUSARDI CONSTRUCTION, INC.

(June 1994 to June 1998)

Title: Foreman / Carpenter

Mr. Blakey filled several roles as a Field Foreman, Carpenter, Concrete Mason and Finisher. His projects included numerous

Commercial and industrial projects including multi-story concrete tilt up and masonry construction.

C-8 CONCRETE Licensed Contractor

(1989 to June 1994)

Title: Self-Employed

Mr. Blakey managed a field crew of 10-30 men. The company focus was on concrete and masonry construction and site

improvements.

PROFESSIONAL AFFLIATIONS

CERTIFICATIONS

OSHA 500 Outreach trainer 5/16/2013 (4 year cert).

Qualified person confined space and trenching and excavation 3/9/2013 (8 Hour).

QCM Certified through the AGC (7-13-12) 5 year Cert.

40 hour EM-385-1-1 (9-1-2011) 4year Cert.

SSHO Level 5 STS Safety Trained Supervisor Current Valid thru 12-31-2014 (IEX05924)

ECATTS Environmental Training Certification, NAB Coronado 9-1-2011 (8Hours)

Current First Aid /CPR training 8 Hours 1-19-2012

Safety Certification: 10-Hour OSHA Construction Safety Course, 2005

Safety Certification: 30-Hour OSHA Construction Safety Course, 2003/2009

3

Safety Certification: CPR Course, Red Cross Certification, and 2006 – 8 Hour

Storm water Management Compliance Inspector. 3-23-2012 (8 Hours)

Centex Technical Training Program, Emphasis on Safety, April 2005 – 40 hours

Competent Person for Scaffolding, January 2008 – 4 hours

Stairway & Ladder Safety, January 2008 – 2 hours

First Aid Training, LASWC, 2008 – 2 hours

Fire Extinguisher Safety Training/ Centex –2005 (2hrs), 2006 (2hrs)

Centex Site Harassment Awareness Training – 2005 – 2 hours

Flagger Safety Training, July 2008 – 2 hours

Erecting & Dismantling of Vertical Shoring, Atlas, 2008 – 4 hours

Aerial Lifts, Scissor Lifts & Telescoping Boom Lifts, Nov 2008 – 4 hours

Competent Person for PPE, Jan 2009 – 4 hours

30-hour OSHA Construction Safety Course, April 2009 – 30 hours

Respirator Trainer Certification, May 2009 – 6 hours

Competent Person Training for Fall Protection, Jun 2009 – 2 hours

First Aid/CPR Certification, March 2009 – 7 hours

Hilti Powder actuated Tools Safety Training, 2008 – 2 hours

Crane and Rigging Safety Training, 2009 – 4 hours

Harassment Awareness Training, Harper Const. – 2007 (2hrs), 2009 (2 hrs)

Harassment Awareness Training Brady Construction (2hrs) 2012

Confined Space Entry 29 CFR 1910.146 2010 (8 hours)

Excavation Trenching and Shoring 29 CFR 1-926-***-**** (2 hours)

San Diego State University, 1978

Mesa College, 1976

4



Contact this candidate