Curriculum Vitae
Jhon Hita Saragih
Name:
Position: Lead Electrical / Instrument Control system Engineer/CommEngr/EM
Nationality: Indonesian Date of Birth: 04 / 03 / 1958
Email address: ******@***.***;
*********@*****.***.**;
*********@*****.***
Permanent
BulakkapalPermai Block F No 25 East BekasiIndonesia
address:
HP No: +62-821********; +62-813**-*******; +62-853********
Passport No:
W 532266 expiration date:29Dec2015 issued Jakarta
E 2868037 expiration date 22 Feb 2016
USA Visa No:
Qualifications: Education
Graduated from Institute of Science and Technology National, JAKARTA 1983
Majoring in Electrical Engineering, Bachelor Degree
Qualification
Over Twenty Five (25) years experience in Electrical/Instrument Engineering Design,
Construction; Commissioning; Start up& Maintenance for Onshore and Offshore Oil and
Gas Production Facilities Project and Petrochemical Plant. Able to work within a diverse
cultural environment. Familiar with relevant government regulation on oil and gas
industries. Organizing and supervising engineering and technician team in design,
installation and commissioning. Know of all relevant engineering & construction codes and
standards. Involved in Project Engineering Control, Procurement Planning and Bidding,
Tracking Progress and Productivity During Fabrication and Construction, Project
Monitoring, Construction Preparation, such as : Manpower Recruitment, Sub Contractor’s
Negotiation and Construction, Equipment Purchasing, Engineering Design Coordination,
Detail design and Construction, Prepared Project Material Requisition, Preparation of
Basic Design, Detail Engineering Drawing, Supervising, Electrical Study and Load
Calculation for Electrical System, Determine One Line Diagram, Area Classification,
Equipment Sizing Selection for Generator, Transformer, Switch Gear, MCC, Cable, DC
System, Illumination, Navigational Aids, Grounding, Lightning Protection, Paging Alarm,
Involved in Construction and Fabrication Phase, Vendor Manufacturer Inspection, Prepare
Proposal Project. Instrument Control System, Prepare Data Sheet of Pressure Transmitter;
Pressure gauge; Pressure Safety Valve; Temperature transmitter; Shut Down Valve; Pig
Signaller; HVAC; Fire and Gas; Flow computer; Instrument Control Panel; SCADA
CV –Jhon Hita Saragih
System; Telecommunication System; Microwave
International Standard & Quality System Knowledge
ANSI, API, NEMA, ASME, ASTM, ISA, ISO, IEC, IEEE, NEC, NFPA, NAC, GB, GBJ,
GB/T, SY/T, DIN
Course and Training Attended
• Designing Panels, Manufacture, Quality
Control, Testing as per Specifications and Standard of
Electrical / Instrument by Siemens Indonesia, April
1982
• Testing of Electrical / Instrument as per
Specification and standard by LMK PLN Jakarta
1982
• Impulse 500KV, 5000KV, Quality Control at
Laboratory, Cable Transformer, Electrical
Switchboards, Instrument Calibration by LMK – PLN
(Electrical Power Research Centre), September
1982, Jakarta
• Safety Training Gas H2S, Fire & Safety,
conducted by ROOS Singapore 1998.
• PLC, DCS and SCADA System by PT. ABB
Industry Pte Ltd Singapore 1998.
• Primavera Project Planner Version 3.1 (P3)
Jakarta 2005.
• PIPELINE TRAINING COURSE by JP
KENNY – PERTH, April 2007
Course contents:
Submarine Pipeline Design
1.
Route Selection and Shore Crossings
2.
Flow Assurance
3.
Corrosion
4.
Selection of Line pipe Materials
5.
Pipeline Mechanical Design
6.
Pipeline Stability
7.
Spanning, Self-Burial and Scour
8.
Risers and Tie-ins Mechanical Design
9.
Offshore Construction
10.
Inspection, Monitoring, Maintenance
11.
and repair
Flood, Gauge & Test Pre-
12.
Commissioning, Commissioning & Decommissioning.
• Sea Survival Certificate number: SS. 8038 /
IKS / 06 held by IKS Jakarta
• Integrated Safety Operation (ISOP)
Training: 23-26 January 2003 held by: TOTAL
FINAELF E&P HANDIL BASE INDONESIE.
Course contents:
Hazard Identifications & Role play.
1.
Gas Detecting.
2.
Fire & Safety.
3.
Risk Assessment.
4.
Job Safety Analysis
5.
Hot Work Supervisor & Intervention.
6.
Respiratory Protection Equipment.
7.
Scaffolding.
8.
9. Lifting Operations.
10. Personal Protective equipment & Role play.
CV –Jhon Hita Saragih
Work Permit Procedure.
11.
Hazardous Area.
12.
Marine Safety.
13.
Construction Safety.
14.
Environmental Awareness.
15.
Back Safety
16.
• Health, Safety & Environmental Certificate
Number: HSE.7971/ IKS / 06Held by PT.
INDUSTRIALINDO KONSULTRAIN Services in
BATAM on 7th-10th October 2006.
• COMPETENT WORKSITE
SUPERVISOR, INTEGRATED MANAGEMENT
SAFETY CHAPTER-5 BY MEGAMAS
TRAINING COMPANY SDN BHD NEGARA
BRUNEI DARUSSALAM. Held on 13th-14th
October 2008.
• TROPICAL BOSIET INCLUDING
TRAVEL SAFETY BY BOAT AND TROPICAL
EBS-OPITO APPROVED CONDUCTED BY
MEGAMAS TRAINING COMPANY SDN BHD
NEGARA BRUNEI DARUSSALAM, Held on 09th
-11th September 2008.
Course contents:
Safety Induction
1.
Basket/Swing Rope Transfer
2.
Sea Survival
3.
HUET
4.
Lifeboat (TEMPSC)
5.
Emergency First Aid CPR
6.
Smoke Hood
7.
Basic Fire Fighting
8.
Tropical EBS
9.
Permit to Work
10.
Professional Experiences:
MKI (Manhattan Kalimantan Investment Pte.Ltd) Tarakan Offshore Block (Nov 2nd,
2012-Present)
Lead E/I Engineer for the following projects:
Tarakan Gas Plant
-
Subsea Pipeline
-
Responsibilities:
• Lead the project team for E/I Engineering design
• Direct and manage project development,Engineering;Procurement;Construction;Commissioning
• Lead engineering design approval for E/I disciplines
• Provide leadership, assistance and support to the project team
• Define project scope, goals and deliverables that support business goals in collaboration with senior
management
• Contribute to development of technical and management process and systems
• Define, plan and manage the activities, resources, schedule and quality of the project in accordance
with management system
• Ensure compliance with health, Safety and Environment Policy.
• Plan and schedule project timelines and milestone using appropriate tools.
• Tract project milestone and deliverable. Etc
CV –Jhon Hita Saragih
PT.ADHIKARYA (EPC)- GS Const. (EPC) OIL AND GAS (May 2012 – Oct 31 st,2012)
Lead E/I Engineer for RESID Fluid CATALITIC Cracking (RFCC)REFINARY PERTAMINA
CILACAP (Green Field) and Sub Station Electrical Tie-in & Integration to existing MCC
Responsibilities:
Liaising with the client and day today basis for project communication, technical and
contractual management of the prepare detail engineering design for construction.
Supervised Engineering team for disciplines as: Electrical; Instrument Control System; to
provide detail engineering design for construction and coordination with construction site for
all disciplines.
Lead resolve of engineering, monitoring progress, invoicing, Maintain QHSE as per Client
standard and international best practice. Weekly coordination meeting at the client office, etc.
PT.ADHIKARYA(EPC)-– JGC Const. (EPC) OG Consortium(Feb,2011 until May 2012)
Technical Leader for Central Gas Processing Unit DONGGI LNG Projects
PERTAMINA JOINT OPERATION BODI Central Sulawesi Island
Responsibilities:
Supervised Engineering team for all disciplines as: Civil; Structure; Mechanical; Piping;
Electrical; Instrument Control System; HSE to provide design engineering; provide proposal
tender as Technical and Commercial price and submit to Client.
Lead resolve of engineering design, monitoring progress, Maintain QHSE as per Client
standard and international best practice. Weekly coordination meeting at the consortium
office JGC, etc.
PT.ADHIKARYA(EPC)- HIUNDAY (EPC) OG Consortium(Nov 17,2011 until Feb 2012)
Technical Leader for Central Gas Processing Unit SENORO LNG Projects
PERTAMINA JOINT OPERATION BODI Central Sulawesi Island
Responsibilities:
Supervised Engineering team for all disciplines as: Civil; Structure; Mechanical; Piping;
Electrical; Instrument Control System; HSE to provide design engineering; provide proposal
tender as Technical and Commercial price and submit to Client.
Lead resolve of engineering design, monitoring progress, Maintain QHSE as per Client
standard and international best practice. Weekly coordination meeting at the consortium
office HIUNDAY etc.
PT.SINGGAR MULIA BALIKPAPAN –EAST KALIMANTAN (Feb 21,2011- Nov 16,2011)
(ENGINEERING CONSULTANT FOR OIL & GAS COMPANY ONSHORE/OFFSHORE)
Senior Project Manager for the following projects:
CHEVRON offshore Sepinggan& Yakin platforms (Brown field)Kalimantan projects
Void Tank Conversion to Oil Surge Tank-West Seno Floating Production Unit
-
Water Injection to Wells-West Seno Floating Production Unit
-
P&ID As-Built South Area
-
CV –Jhon Hita Saragih
TOTAL E&P offshore Tunu and Tambora Field (Brown field) Kalimantan projects
Detail Engineering Study IPP Senipah
-
GTS-C Extension Platform Detail Engineering
-
PREMIER OIL WHP; CPP GAJAH BARU BATAM (Green Field)
Detail engineering field
-
As built drawing
-
Engineering query
-
Responsibilities:
Liaising with the client and day to day basis for project communication, technical and contractual
management of the as built design P&ID for South area; Void tank conversion to oil surge tank FPU
West Seno;Well connection; modification design engineering projects.
Supervise team engineering (102 personnel) for preparation of documents, coordination and
management Design; ensuring technical quality of deliverables.
Lead resolve of engineering problems. Monitoring progress, invoicing. Maintain QHSE as per client
standard and international best practice. weekly coordination meeting at the client office, etc
PT.SUPRACO ENVIRO INDONESIA (Nov 2010-Feb 19, 2011)
Project Manager for Chevron projects:
(Continuation from previous PM resigned and continue by me)
CHEVRON Central Gathering Station Units 01;03;05;10;Central Injection Feed WATER DISPOSAL
DURI Steam Flood Onshore Projects (Green Field)Duri North Sumatra
Responsibilities:
• Liaising with the client on day to day basis for project communication, technical and contractual
management of the Water disposal Construction;Pre-commissioning; Commissioning and Start up.
• Lead the project team
• Direct and manage project development
• Provide leadership, assistance and support to the project team
• Define project scope, goals and deliverables that support business goals in collaboration with senior
management
• Contribute to development of technical and management process and systems
• Define, plan and manage the activities, resources, schedule and quality of the project in accordance
with management system
• Ensure compliance with health, Safety and Environment Policy.
• Accountable for achieving delivery within agreed budged defined with client.
• Effectively communicate project expectations to team member and stakeholders in a timely and clear
fashion.
• Estimate the resources and participants needed to achieve project goals
• Draft and submit budget proposal, and recommend subsequent budget changes where necessary.
• Where required, negotiate with other department manager for the acquisition of required personnel
from within the company.
• Determine and asses need for additional staff and/or consultants and make the appropriate recruitments
if necessary during project cycle.
• Set and continually manage project expectations with team members and other stakeholders.
• Delegate tasks and responsibilities to appropriate personnel
• Identify and resolve issues and conflicts within the project team.
• Identify and manage project dependencies and critical path
• Plan and schedule project timelines and milestone using aproriate tools.
• Tract project milestone and deliverable.
• Develop and deliver progress report,proposal, requirements documentation and presentations.
• Determine the frequency and content of status reports from the project team, analyze result and
troubleshoot problem areas.
CV –Jhon Hita Saragih
• Proactive manage changes in project scope, identify potential crices and devise contingency plants.
• Coach, mentor, motivate and supervise project team members and contractor and influence them to take
positive action and accountability for their assigned work
• Build, develop and grow any business relationships vital to the success of the project
• Develop best practices and tools for project execution and management
• Conduct project post-mortems and create a recommendations report in order to identify successful and
unsuccessful project elements
PT Aldaberta PENSPEN Indonesia (March2010 – October 2010)
Project Manager
FEED Kerendan Gas Processing Plant Project (Green Field)
Responsibilities:
• Lead the project team from the beginning to end.
FEED Engineering design, Gas capacity 26.5 MMSCFD and HP Pressure case 800 PSIG; Medium
Pressure case 400 PSIG and Low Pressure case 100 PSIG
High Pressure case as: Inlet Manifold; Separation Unit; Produced Water Treatment; Condensate Handling
unit; Gas Dehydration Unit(DHU); Sales Gas Heater and Gas Line.
Medium Pressure Case as: Inlet Manifold; Separation Unit; Produced Water Treatment; Condensate
Handling unit; Gas Dehydration Unit(DHU); Sales Gas Heater and Gas Line.
Low Pressure Caseas: Inlet Manifold; Separation Unit; Produced Water Treatment; Condensate Handling
unit; Future connection CO2 and H2S Removal; Future Scrubber and Booster Compressor Package.
Sales gas to power generating station which is located within 3 km of the KGPF with NPS ca. 8 inch.
• Supervise team engineeringFEED Kerendan Gas Processing Plant Project for preparation of
documents, coordination and management FEED (Basic Design), Design Pressure onshore Gas
Pipeline, Pig Launcher / Receiver Stations, Block Valve Station and End Metering / Regulating
Station; ensuring technical quality of deliverables.
• Provide leadership assistance and support to the project team
• Contribute to development of technical and management process and systems.
• Define, plan and manage the activities, resources, schedule and quality of the project design in
accordance with management system.
• Ensure compliance with health, Safety and Environment Policy.
• Plan and schedule project timelines and milestones using appropriate tools
• Draft and submit budged proposal and recommend subsequent budged changes where necessary.
• Identify and resolve issues and conflicts within the project team.
• Develop and deliver progress report, proposals, requirements documentation and presentations
• Proactively manage changes in the project scope, identify potential crises and device contingency
plans.
• Develop best practices and tools for project execution and management. Etc.
BRUNEI SHELL PETROLEUM COMPANY SENDIRIAN BERHAD (Aug 2008-28 Feb 2010)
E / ICOMMISSIONING ENGINEER
PRP platform projects at Champion East & West Areas (Brown Field)as the following as:
Mampak Drilling Platform; Magpie Drilling Platform; CPRJ-01; CPRA-01; CPCX-12; CPAP-12;
CPPP-10; CPPP-11; CPDP-12; CPWJ-12; CPDP-33; CPRP-01; CPDP-36; CPDP-24; CPWJ-05;
CPPP-04; CPWJ-20; CPRP-03; CPWJ-21; CPAP-12; CPDP-13; CPRP-04; CPDP-19; CPDP-11;
CPDP-25; CPRA-01; CPCX-03; CPAP-01; CPRP-03; CPRP-01; CPPP-04; and West area platforms
as: AMGP-09; AMRJ-02; AMDP-06; AMRJ-1N. (Brown field)
PIMS platform projects at AMPA & FAIRLEY West area (Brown Field) as the following as:
AMRP-04; AMDP-05; AMRP-04; AMCP-0; AMRP-06; AMRJ-02; AMGP-09; AMDP-20; FARP-03;
FAGP-04; FARP-03; FACP-04; AMCA-09; FAPP-03; AMRJ-01. (Brown Field)
SERIA Crude Oil Terminal (SCOT PHASE 1 & 2), Main Online Sub Sea Pipe Line from CPRP-11
Platforms to SCOT PHASE 1 & 2 (Green Field)& SERIA LNG
Magpie Compression Process Platform (Green Field)
CV –Jhon Hita Saragih
Responsibilities:
• Liaising with the client on day to day basis for project communication, technical and contractual
management of the EPCI.
• Manage E/I team and E/I Vendor at onshore site based& Hook up Platforms at offshore
• Onshore preparation of offshore construction work packs for pre-commissioning, commissioning.
• Reviews the test run procedures and the operating manuals prepared by the project Process leaders
• Take part in project planning & scheduling, prepares and keeps up to date the pre-commissioning,
commissioning, start up and test run execution plans
• Support construction Supt during construction execution phase and reports to commissioning site
leader during preparation and execution of Pre-commissioning and Commissioning.
• Organizes commissioning engineer and technicians to execute in the field.
• Ensure safe Construction, Pre-commissioning and Commissioning activities
• Interface with project management team, discipline engineer and operations
• Assist in interfaces between the project work packages during the preparation and the execution of
the commissioning
• Participation in system/sub-system punchlist verification and acceptance
• Supervises and guide contractors pre-commissioning personnel where necessary
• Carry out both onshore dynamic commissioning and assist other disciplines where necessary
• Assists services purchasing & subcontracting department for the definition of subcontractors scope
of work
• Take part in the project review meetings to make sure that the commissioning requirements have
been duly complied with
• Participate and lead risk assessments and toolbox talks when on site project
• Support the HSE Manager for the aspects falling within his area of responsibility and for the
preparation of the general HSE plan,
• Ensures that HSE policy and management systems are adhered to by the construction and
commissioning teams and that safe working practices are carried out at all times.
• Ensures the preparation and checking of the purchase requisition and technical evaluation falling
with his sphere of responsibility
• Ensure plant is precommissioned and commissioned as per company standard specification and
inline with clarifications/instruction of the commissioning site leader
• Assist the site Manager in the plant hand over activities
• Ensures the issue of work progress reports for the part he is responsible for weekly reports to the
home office
• Involved direct commissioning Mechanical; Piping; Electrical; Instrument with contractor
• Verifies that the pre-commissioning,commissioning & start up requirements are accounted
for into engineering documents
Monitored Punch list Item; Pre-commissioning, Commissioning for : Electrical; Control &
Shutdown; Vents & Flare System; Power Generation; HVAC and Pressurisation; Nav Aids; DCS;
IPS; Utility and Instrument air; Corrosion Inhibitor Injection; Oil and Gas production; Crude Oil
export; Gas compression; Gas Lift; Fuel Gas; Drains, Sumps and Pumps; Utility and Instrument
Gas; Portable Emergency Equipment; Chemical injection Skid; Trouble shooting and start up
platforms, maintenance. Monitor contractor’s disciplines/discipline engineers (E&I; Mechanical;
Piping; Structural) to ensure that check sheets are accurately completed and are submitted in a
timely manner to the data base administrator to meet hand over dates-expedites when required,
monitor system status; Interface with engineering to ensure engineering data is updated in
accordance with revision updates of key documents.Coordinates punchlist activities with
constructionsystem completion and operation teams. Arranges and chairs weekly mechanical
completion hand over meeting and ensures that construction disciplines are working to complete
punch list item in a timely/orderly fashion to meet scheduled hand over dates; Ensure mechanical
Completion certificates are prepared, signed by appropriated supervisor/managers and distributed
as stipulated in project coordination procedures; Coordinates preparation of mechanical completion
Dossier format and helps set up all dossiers; Verifies and signs of mechanical Completion dossiers for
systems and coordinates hand over. Conduct briefing to the contractors PM and their supervisor on
their function and duties. Monitoring progress and ensure no delay on job. Report to Project
Manager if there is any unpredictable problem, Etc
CV –Jhon Hita Saragih
PT.PUNJ LLOID INDONESIA (March 2008 – July 2008)
Lead Commissioning Electrical, Instrument control System, Telecom Engineer
TUNU Field 11- SUP (South Utilities Platform, 2unit- EDG 1.4 MVA) Onshore & Offshore EPSC 05
TOTAL Project East Kalimantan (Green Field)
Responsibilities:
• Manage E/I team and E/I Vendor at onshore site based & Hook up Platforms at offshore
• Onshore preparation of offshore construction work packs for pre-commissioning, commissioning.
• Take part in project planning & scheduling, prepares and keeps up to date the pre-commissioning,
commissioning, start up and test run execution plans
• Support construction Supt during construction execution phase and reports to commissioning site
leader during preparation and execution of Pre-commissioning and Commissioning.
• Organizes commissioning engineer and technicians to execute in the field.
• Ensure safe Construction, Pre-commissioning and Commissioning activities
• Interface with project management team, discipline engineer and operations
• Assist in interfaces between the project work packages during the preparation and the execution of
the commissioning
• Participation in system/sub-system punch list verification and acceptance
• Assists services purchasing & subcontracting department for the definition of subcontractors scope
of work
• Take part in the project review meetings to make sure that the commissioning requirements have
been duly complied with
• Participate and lead risk assessments and toolbox talks when on site project
• Support the HSE Manager for the aspects falling within his area of responsibility and for the
preparation of the general HSE plan,
• Ensures that HSE policy and management systems are adhered to by the construction and
commissioning teams and that safe working practices are carried out at all times.
• Ensures the preparation and checking of the purchase requisition and technical evaluation falling
with his sphere of responsibility
• Ensure plant is precommissioned and commissioned as per company standard specification and
inline with clarifications/instruction of the commissioning site leader
• Ensures the issue of work progress reports for the part he is responsible for weekly reports to the
home office
• Involved direct commissioning Mechanical; Piping; Electrical; Instrument with contractor
• Verifies that the pre-commissioning, commissioning & start up requirements are accounted
for into engineering documents
Supervise engineering team EPC and subcontractors for Electrical; Instrument Control System;
Telecomm for Pre-commissioning, Commissioning; Prepared System and Sub system for ICAPS
(Integrated Commissioning and Progress System). Prepared Electrical/Instrument/TelecomPre
commissioning Procedures as Electrical (Generator; HV/LV Transformer; HV/LV Switchgear; MCC;
HV/LV Cable; HV/LV Bus Duck; HV/LV motors; Distribution board; HVAC; Battery
charger/inverter; Lighting circuits; Socket outlet system; Electrical heater; Neutral earth resistor;
Control station; Navigation/Aviation Warning light; Earthing system; Cable racking; bonding;
supporting;; MCTS; Junction box; Cathodic protection); Telecom as (P.A Loud speaker; P.A
Beacons; P.A Override Control Unit; P.A Control Unit; P.A Central rack; Telephones; Acoustic
Hood; Tel Beacon; Telecom Console; Telecoms Alarm; CCTV equipment; CCTV Cameras;
UHF/VHF Radios; Radio Microwave; Survival craft Radio Beacon; Optical Modem & Digital Mux
Rack; Computer LAN; Telecommunication cables; Cable ranking, bonding, supporting and MCTs;
Junction Boxes); Instrument as (Analyzers; Panels; Local panels; Push buttons; Annunciator panels;
Control room panels; Instrument panels; Monitor;/Power supply; Critical Manual valves; ESD on of
valves; ESD Blow down valve; PSV Relief valve; Thermal relief valve; Control valve; Instrument
cables; Cable rancking; Marshalling boxes; Instrument package equipment) and
CommissioningProcedures as Prepared Operational Test Procedures (EDG01/02; HVAC; 48V DC UPS;
230V AC UPS; HV/LV Switchgear; Black start; Fire water pump); Installation Procedures; Prepared
Scheduling for construction; pre-commissioning; commissioning; daily, Weekly; Monthly report to
management; Coordination meeting, Safety induction meeting every Monday morning; Solved
CV –Jhon Hita Saragih
engineering /construction problems.Monitored Punch list Item; Pre-commissioning, Commissioning
for: Electrical; Instrument Control &Shutdown,Etc
PT.ENERKON – REKAYASA INDUSTRY (01Nov 2007 – 27Feb 2008)
Senior Project Engineer
PERTAMINA EMERADA HESS JAMBIMERANG SOUTH SUMATRA
Responsibilities:Supervise engineering team to provide EPC JAMBI MERANG Pipeline and
Receiving Facilities.
The job to provide design engineering as Specification, Data sheets, Calculation, Schematic diagram,
Detail drawing, Block diagram, Material take off, Request for quotation for Process, Mechanical,
Piping, Instrument Control system, Electrical, Civil/Structure; Prepare Vendor list; Coordination
meeting; Etc
PT.ENERKON – ISTANA KARANG LAUT (6 Sept 2007 – 31 Oct 2007)
Project Coordinator
SOUTH PARS GAS FIELD DEVELOPMENT (POGC) IRAN LNG Phases 6, 7, 8 Sweetening and
SULFUR Recovery Plant
Responsibilities: Supervise engineering team to provide EPC proposal tender with PT.IKL-
ENERKON for N.I.O.C (National Iranian Oil Company) .The job to provide Design engineering
review/detail drawing, Data sheets for Process, Mechanical, Piping, Instrument Control System;
Electrical; MTO, Supply materials, Supervision and Commissioning for areas: MDEA Acid Gas
Removal (AGR) trains 1 up to 6; SULFUR Recovery Units (SRU) Trains 1 up to 4; Sour water
Stripper (SWS); Interconnecting Unit(Distribution Header); Steam generation and Distribution
trains 1 up to 3; Instrument and service air; Nitrogen; Demineralized Water; Utility and
drinking(Potable) Water; Refrigeration Waste Effluents disposal; Cooling Water; Fire Water and
distribution Network; Acid gas flare; Fuel gas ; Surface Water. Co-ordination meeting with Client,
Etc
JP KENNY WOOD GROUP – JAKARTA (July 2007 – Sept2007)
Lead Design Electrical, Instrument Control System Engineer
EXXON MOBIL BANYU URIP CEPU (Onshore & Offshore Oil and Gas Pipeline Project)
Responsibilities:
Supervise engineering team to provide FEED Engineering Pipeline (PIG Launcher from onshore; Valve
stations and PIG Receiver at offshore FSO) and Onshore Receiving Facilities.
The job to provide design engineering of Electrical/Instrument Control System, PID, PFD,
Telecommunication, Process, Data sheets as Pressure gauges; Pressure Transmitters; Temperature
Transmitters; Pressure Safety valves; Pig Signaller; Shutdown Valves; Motor Operating Valves;
PCS; DC Panel; Instrument Index; UPS; HVAC; & Electrical Load Calculation, Cable sizing
calculation, E/I Cable routing, Hazardous Area Classification, Single line diagram, Schematic
diagram, Detail drawing, Lighting Lay out; Switchgear; Distribution Board; Transformer; Lighting
Panel; Telecom Panel; Impress current ; Cable routing; Lightning Protection; Block diagram,
Material take off, Request for quotation for Instrument Control system & Electrical, Coordination
meeting; Project Control, Provide man hour request, Prepared weekly/monthly progress report to
management, Etc
JP KENNY WOOD GROUP – SHANGHAI China (December 06th, 2006 – July 2007)
Senior Project Engineer
CV –Jhon Hita Saragih
Shanghai LNG Pipeline Offshore and Onshore Project
Provide FEED Engineering Design in Shanghai (Green Field)
Responsibilities:
Liaising with the client and day to day basis for project communication, technical and contractual
management of theFEED Engineering design
Supervise subcontractors in Shanghai (CPPOE: China Petroleum Pipeline Bureau Corporation) for
preparation of documents, coordination and management of a Chinese Design Contractor for the FEED
(Basic Design) of 16 Km of 36 inch API 5Lx70 (WT 22.2 mm) SAW, of 9.2 MPa Design Pressure (Class
600) Onshore Gas Pipeline, Pig Launcher / Receiver Stations, Block Valve Station and End Metering /
Regulating Station at NANHUI, Shanghai China for messrs Shanghai LNG Company Ltd. Also
responsible for coordination and management of JP KENNY’S portion of 36 inch API 5Lx65 (WT 20. 6
mm) SAW Offshore Pipeline; ensuring technical quality of deliverables.
Specific features of the project include as well as generating for Electrical & Instrument Control System,
Telecommunication as: calculations, Specification, Data sheets, Drawing, Detail drawing, Material Take of,
Material Requisitions, Cost estimating, Preparing RFQs, Bid evaluation, Procurement support,
Coordinating JPK’s work load associated with E&I and SCADA, CCTV . Review document specification
& design drawing for Electrical, Instrument, Process, Mechanical, Piping, Civil, Structure HAZID, QRA,
HAZOP and SIL Review. Documents there were 250 documents for the basic design Package (i.e. 175
documents for onshore and 75 for Offshore). Interface Management of Terminal, Onshore and Offshore
Pipeline issues with the Client, JP KENNY Jakarta, Terminal Design Contractor and Onshore Pipeline
Chinese Design Contractor. Engineering coordinator, solved problems correspondences, Prepare weekly,
monthly reports to management. Co-ordination meeting, Safety meeting, Project control, Etc.
PT.NIPPON STELL TANJUNG UNCANG, BATAM (December04, 2005 – December04, 2006)
Engineering & Construction Site Manager
West Lobe Premier Oil Platform; SISINUBI Total E&P Platforms (MWPN; MWPS; WPN2)
Projects (Green Field