Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Corona, CA, 92881
Salary:
90 to 105k an
Posted:
June 13, 2013

Contact this candidate

Resume:

ROBBIE WHITLOCK CM/PM

abx8qn@r.postjobfree.com

951-***-****

Mr. Whitlock has eighteen years of varied practical experience such as an

Owners Authorized Representative for a very large school district, Project

Manager for a large General Contractor, CADD Manager for multidisciplinary

firm as well as Job Captain and Senior CADD Coordinator Professional with

expertise in the production & coordination of parking structures, K-12

schools and residential projects.

While representing the architects and engineers, Mr. Whitlock was the

Project Manager/Construction Manager on four K-12 Underground Parking

Structures for Los Angeles Unified School District, as well as ADA projects

in support of LAUSD's Architectural/Engineering Technical Support Section.

Mr. Whitlock has been providing support to LAUSD's Facilities Services

Division as a Project Engineer since January of 2006 and was promoted with

the responsibilities of the Owners Authorized Representative for a large

project. Mr. Whitlock also has gained experience working for a large

general contractor while constructing two health clinics and understands

what is required from all team members on large projects. Mr. Whitlock also

has knowledge of DSA (Division of State Architect) processing procedures.

Mr. Whitlock maintains the ability to support senior management in review

and coordination of project planning, quality assurance, scheduling and

reporting.

. 18 years experience in construction, engineering and project

management

. Over 10 years experience in California K-12 school construction

EDUCATION:

In Progress: BS - Business Administration, specializing in Project

Management and Management Consultant, Devry University,

Colton, CA

CAD Drafting & Design Diploma, MTI College, Colton, CA - 1992

EXPERIENCE:

LAUSD 7 years

Other K-12 11 years

CERTIFICATIONS/ TRAINING:

. AutoCAD Operations Certificate

. AutoDESK Revit Architecture, 2011

. AutoDESK Revit Structure, 2011

. BIM Training, 2011

. 10 Hour OSHA Certification

. CPR Certification 2009-2010

. First Aid Certification 2009-2010

. Received "Certificate of Recognition" for Outstanding Leadership and

Contribution towards the success of Ramona Opportunity High School, 2010.

. Received an "Award of Completion" for the Construction Management

Procedures Training, June 2007

. CCM Certification in process, pending exam

WORK HISTORY:

USS CAL Builders February 2012 - April 2013

8051 Main Street, Stanton, CA 90680

714-***-**** Contact: Rabih El Zein

LAUSD - Project Manager

J.C. Fremont HS - Health Clinic & Community Garden

The Fremont HS Health Clinic & Community Garden is a one and one-half acre

site that includes a modular community clinic, garden and urban farming

project that will provide educational programming, job training

opportunities, healthy food access to the students and community members

that will also serve as a service learning area for the 4,600 students at

Fremont High School.

. Responsible for development of the project site, including underground

utility infrastructure such as Sewer, Storm Drain, Electrical, Gas,

Domestic Water & Fire Water.

. Manage site office staff and subcontractors. Procure and approve

subcontract agreements

. Daily reporting, weekly progress meetings with Owner and project team

. Processing pay applications to Owner and Subcontractors. Quality Check

invoice to be in compliance with LAUSD's submittal requirements,

create Schedule of Values to Owner

. Process Change Orders to Owner, negotiate and finalize with

subcontractor and Owner in a timely fashion, TIA in case of delay

. Provide monthly schedule updates to Owner and monitor items within the

Critical Path

. Logs - RFC/RFI, Change order, submittal, etc.

. Mitigate/Resolve disputes with owner, subcontractor, and suppliers

. Coordinate procurement of a Lease/Leaseback prefabricated modular

building

. Capable of managing multiple projects

Washington Prep HS - Health Clinic

The Washington HS Health Clinic is a two acre site that includes the

development of a 2,880 square foot Modular community health clinic and 105

car staff parking lot. The health clinic is to serve the community as well

as students attending the high school.

. Responsible for development of the project site, including underground

utility infrastructure such as Sewer, Storm Drain, Electrical, Gas,

Domestic Water & Fire Water.

. Manage site office staff and subcontractors. Procure and approve

subcontract agreements

. Daily reporting, weekly progress meetings with Owner and project team

. Processing pay applications to Owner and Subcontractors. Quality Check

invoice to be in compliance with LAUSD's submittal requirements,

create Schedule of Values to Owner

. Process Change Orders to Owner, negotiate and finalize with

subcontractor and Owner in a timely fashion, TIA in case of delay

. Provide monthly schedule updates to Owner and monitor items within the

Critical Path

. Logs - RFC/RFI, Change order, submittal, etc. Review daily.

. Mitigate/Resolve disputes with owner, subcontractor, and suppliers

. Coordinate the procurement of a Lease/Leaseback prefabricated modular

building per plans and specs

. Perform other duties as directed by upper management

TTG Construction Services January 2006 - March 2011

(fka: TBI & Associates, Inc.)

800 Wilshire Blvd., Suite 320, Los Angeles, CA 90017

213-***-**** Contact: Rick Hijazi

LAUSD - Project Engineer

South Region High School No. 12

This school consists of four small learning communities that include

classrooms, science labs, and academy administration. School facilities

shared by the small learning communities will include performing arts

classrooms, a library, multi-purpose room, two gymnasiums, food service and

lunch shelter, central administration, playfields, and both surface and

underground parking. A joint use agreement is proposed with the County of

Los Angeles to share playfields, basketball courts, and other facilities.

. On-Site Support of OAR with daily responsibilities including

management of project site office staff

. Daily reporting, weekly progress meetings with General Contractor and

project team, distributing meeting minutes, and provide job site

computer network support

. Directly in charge of Time & Material construction directives.

Performed the accounting role by verifying contractor's submitted

change order proposal for compliance with the project's General

Conditions.

. Quality Check invoice to be in compliance with LAUSD's submittal

requirements

. In charge of procuring and processing the projects as-built drawings

from the architect of record to the LAUSD. Obtained approval and

acceptance

. Confirm contractor's maintenance of record drawings prior to monthly

progress payments to the Contractor

. Coordinate end user deliveries such as furniture and office equipment

. Coordinate underground utility infrastructure such as Sewer, Storm

Drain, Electrical, Gas, Domestic Water & Fire Water.

. Perform the job duties of the OAR in their absence

. Perform other duties as directed by upper management

Ramona Opportunity High School

231 S. Alma Avenue, Los Angeles, CA 90063

Project Engineer / Acting Authorized Owner Representative

This replacement school is built on a reconfigured site because the Metro

Transit Authority needed a portion of the existing school site to complete

their East Side Extension Project. The reconfigured site includes a

gymnasium, childcare center, kitchen, multi-purpose room, thirteen

classrooms, and a playfield and was constructed in three phases of

construction.

Review the architectural plans for conformance to the District's standards.

Review, draft, edit the standard specifications to include products not

contained within

Managed daily construction phase activities including interact with

contractor, A/E, IOR, DSA and school principal/end-user as well as outside

agencies, consultants, and vendors

Managed the schedule, budget, dispute/conflict resolution, change order

mitigations and negotiations, punch list administration, facility turn-

over, construction contract close-out, and in-service training. Assist with

value engineering before and during the project

Coordinated and oversaw the construction process with the MTA/Metro Gold

Line Team, General Contractor, Architect, Inspection Department, and the

Project Management Team to ensure the project is constructed as planned and

within budget and schedule

Managed the coordination of the underground utility infrastructure such as

Sewer, Storm Drain, Electrical, Gas, Domestic Water & Fire Water.

Attend construction meetings as the District's representative

Confer with Sr. Management weekly to discuss project status and budgets

Managed the interface with the City of LA & LA County and coordinated

efforts between the two entities

Coordinated with end user for delivery of furniture and office equipment

Directed the project team with achievable goals in support of LAUSD's

processing requirements

Provided technical and engineering support to PM/CM

Assist in DSA project closeout

Los Angeles Unified School District Island Elementary School

500 N. Island Avenue, Wilmington, CA 90744

Project Engineer

This project is a two-building elementary school consisting of one two-

story classroom building with a subterranean parking garage and a one-story

multi-purpose building

On-Site Support of OAR with daily responsibilities including management of

project site office staff

Daily reporting, weekly progress meetings with General Contractor and

project team, distributing meeting minutes, and provide job site computer

network support

Performed the accounting role by processing the contractor's invoice and

was responsible for verification of approximately $20,000,000 worth of time

and material invoices as submitted by General Contractor

QC invoice to be in compliance with LAUSD's submittal requirements

In charge of procuring and processing the projects as-built drawings from

the architect of record to the LAUSD. Obtained approval and acceptance

Confirm contractor's maintenance of record drawings prior to monthly

progress payments to the Contractor

Perform the job duties of the OAR in their absence

Perform other duties as directed by the OAR

Owen Design Group, June 2001 - October 2005

20 Morgan, Irvine, CA 92633, Contact: Michael Chegini 949-***-****

Project Manager / Construction Manager

ADA projects in support of LAUSD's Technical Support:

Performed the services related to access compliance for over 15 LAUSD

campuses

Performed onsite quality assurance evaluations of projects, report results,

define a scope of work for corrective action projects, and managed the

projects to ensure full compliance

The projects primarily focused on bringing the schools into compliance by

providing code required paths of travel and clearances for disabled

students, staff, and visitors using the following Guidelines: the Americans

with Disabilities Act (ADA) regulations, Title 24 (California Building

Standards Code), DSA California Access Compliance Reference Manual, and the

Rehabilitation Act section 504

K-12 Florence Elementary School - Playfield / Parking Structure

7211 Bell Avenue, Los Angeles, CA 90001

K-12 Miles Elementary School - Playfield / Parking Structure

6720 Miles Avenue, Huntington Park, CA 90255

K-12 Pacoima Elementary School - Playfield / Parking Structure

11016 Norris Avenue, Pacoima, CA 91331

K-12 San Miguel Elementary School - Playfield / Parking Structure

9801 San Miguel Avenue, South Gate, CA 90280

These projects are semi-subterranean and full subterranean parking garages

with a fully functional, fenced and handicapped-accessible playground

surface located on the top deck; The parking structures provided over 220

parking stalls while providing an additional 71,500 S.F of play area for

the students

Project manager for the design and approval phase of the project

Responsible for all sub consultant specification and drawing coordination

Process submittal of project documents and drawings to DSA

Process deferred approval items to DSA for approval

Obtain DSA approval for project documents

Construction manager for the construction phase of the project

Process all submittals, deferred approvals, and process & coordinate

request for clarification to sub consultants and back to LAUSD

On and off-site support of District's PM/CM Program

In charge of procuring and processing the projects as-built drawings to the

LAUSD vault department and obtained approval and acceptance

Post Tension Design, November 1999 - March 2001

1202 Monte Vista Ave., #2, Upland, CA 91786, Contact: Clark Crump

909-***-****

These projects are foundation design projects for multiple home projects

all over southern California

Senior CAD Draftsman for Structural Post-Tensioned Foundation Plans

Provided local area network administration

Procure, setup and create an office network; Install related software

Set up and install printers and plotters

Trouble shoot various types computer software issues with MS Word, Excel,

Outlook, and remote access

Walker Parking Consultants, Newport Beach, CA - August 1997 - November 1999

4700 Von Karman Avenue, Newport Beach, CA 92633 (Office Closed), Contact:

Rise` Landeros 269-***-****

Senior CAD Draftsman for a Prime consultant providing on public and private

projects; Disneyland added a 10,242 six story structure; San Diego State

University semi subterranean parking garage, stadium with playfield and

running track on the top deck; University California San Diego, 2500 car 3

story above ground parking structure

Assist with drawing coordination between sub consultants

Assist with preparing progress submittals to the owner

Assist with preparing submittals to Local authorities for approval

For university projects, assist with preparing submittals to DSA

Provided local area network administration

Set up and install printers and plotters

Trouble shoot various types computer software issues with MS word, Excel,

Outlook, Power Point, and remote access

AMTREX Logistics, May 1995 - August 1997

5000 Birch, Newport Beach, CA 92660, Contact: Brian Scott 949-***-****

Operations Coordinator

Responsibilities required a working knowledge of modes of transportation -

LTL, TL, Intermodal, Rail, and Air types of transportation

Consolidation and Distribution - Provide reports to client base as to where

they are at all times and proactive notification to client prior to

delivery

Performed service of Office Network Administrator - Windows95, Windows NT

and related MS-Office Software

Setup and trouble shoot PC and network printing issues

Hallmark Marketing Corporation, January 1994 - April 1995

10 Corporate Park, Irvine, CA 92606, Contact: Cliff Vyematsu 949-***-****

These projects are Hallmark store modernization projects

Assist with preparing Floor Plans, Merchandise Plans, Reflected Ceiling

Plans, and Electrical Plans

Store Front Elevations and Perspective CAD drawings

Assist with preparing submittals to Local authorities for approval

Trouble shoot various types computer software issues with MS word, Excel,

Outlook, Power Point, and remote access

Peak Technical Services, January 1993 - January 1994

7 Corporate Park, Irvine, CA 92606, Contact: John Cane 949-***-****

Performed as a CAD Draftsman in a variety of different temporary projects

from Mechanical drafting to Architectural drafting

All CAD drafting from engineers redline drawings

End of Resume



Contact this candidate