ROBBIE WHITLOCK CM/PM
******@*****.***
Mr. Whitlock has eighteen years of varied practical experience such as an
Owners Authorized Representative for a very large school district, Project
Manager for a large General Contractor, CADD Manager for multidisciplinary
firm as well as Job Captain and Senior CADD Coordinator Professional with
expertise in the production & coordination of parking structures, K-12
schools and residential projects.
While representing the architects and engineers, Mr. Whitlock was the
Project Manager/Construction Manager on four K-12 Underground Parking
Structures for Los Angeles Unified School District, as well as ADA projects
in support of LAUSD's Architectural/Engineering Technical Support Section.
Mr. Whitlock has been providing support to LAUSD's Facilities Services
Division as a Project Engineer since January of 2006 and was promoted with
the responsibilities of the Owners Authorized Representative for a large
project. Mr. Whitlock also has gained experience working for a large
general contractor while constructing two health clinics and understands
what is required from all team members on large projects. Mr. Whitlock also
has knowledge of DSA (Division of State Architect) processing procedures.
Mr. Whitlock maintains the ability to support senior management in review
and coordination of project planning, quality assurance, scheduling and
reporting.
. 18 years experience in construction, engineering and project
management
. Over 10 years experience in California K-12 school construction
EDUCATION:
In Progress: BS - Business Administration, specializing in Project
Management and Management Consultant, Devry University,
Colton, CA
CAD Drafting & Design Diploma, MTI College, Colton, CA - 1992
EXPERIENCE:
LAUSD 7 years
Other K-12 11 years
CERTIFICATIONS/ TRAINING:
. AutoCAD Operations Certificate
. AutoDESK Revit Architecture, 2011
. AutoDESK Revit Structure, 2011
. BIM Training, 2011
. 10 Hour OSHA Certification
. CPR Certification 2009-2010
. First Aid Certification 2009-2010
. Received "Certificate of Recognition" for Outstanding Leadership and
Contribution towards the success of Ramona Opportunity High School, 2010.
. Received an "Award of Completion" for the Construction Management
Procedures Training, June 2007
. CCM Certification in process, pending exam
WORK HISTORY:
USS CAL Builders February 2012 - April 2013
8051 Main Street, Stanton, CA 90680
714-***-**** Contact: Rabih El Zein
LAUSD - Project Manager
J.C. Fremont HS - Health Clinic & Community Garden
The Fremont HS Health Clinic & Community Garden is a one and one-half acre
site that includes a modular community clinic, garden and urban farming
project that will provide educational programming, job training
opportunities, healthy food access to the students and community members
that will also serve as a service learning area for the 4,600 students at
Fremont High School.
. Responsible for development of the project site, including underground
utility infrastructure such as Sewer, Storm Drain, Electrical, Gas,
Domestic Water & Fire Water.
. Manage site office staff and subcontractors. Procure and approve
subcontract agreements
. Daily reporting, weekly progress meetings with Owner and project team
. Processing pay applications to Owner and Subcontractors. Quality Check
invoice to be in compliance with LAUSD's submittal requirements,
create Schedule of Values to Owner
. Process Change Orders to Owner, negotiate and finalize with
subcontractor and Owner in a timely fashion, TIA in case of delay
. Provide monthly schedule updates to Owner and monitor items within the
Critical Path
. Logs - RFC/RFI, Change order, submittal, etc.
. Mitigate/Resolve disputes with owner, subcontractor, and suppliers
. Coordinate procurement of a Lease/Leaseback prefabricated modular
building
. Capable of managing multiple projects
Washington Prep HS - Health Clinic
The Washington HS Health Clinic is a two acre site that includes the
development of a 2,880 square foot Modular community health clinic and 105
car staff parking lot. The health clinic is to serve the community as well
as students attending the high school.
. Responsible for development of the project site, including underground
utility infrastructure such as Sewer, Storm Drain, Electrical, Gas,
Domestic Water & Fire Water.
. Manage site office staff and subcontractors. Procure and approve
subcontract agreements
. Daily reporting, weekly progress meetings with Owner and project team
. Processing pay applications to Owner and Subcontractors. Quality Check
invoice to be in compliance with LAUSD's submittal requirements,
create Schedule of Values to Owner
. Process Change Orders to Owner, negotiate and finalize with
subcontractor and Owner in a timely fashion, TIA in case of delay
. Provide monthly schedule updates to Owner and monitor items within the
Critical Path
. Logs - RFC/RFI, Change order, submittal, etc. Review daily.
. Mitigate/Resolve disputes with owner, subcontractor, and suppliers
. Coordinate the procurement of a Lease/Leaseback prefabricated modular
building per plans and specs
. Perform other duties as directed by upper management
TTG Construction Services January 2006 - March 2011
(fka: TBI & Associates, Inc.)
800 Wilshire Blvd., Suite 320, Los Angeles, CA 90017
213-***-**** Contact: Rick Hijazi
LAUSD - Project Engineer
South Region High School No. 12
This school consists of four small learning communities that include
classrooms, science labs, and academy administration. School facilities
shared by the small learning communities will include performing arts
classrooms, a library, multi-purpose room, two gymnasiums, food service and
lunch shelter, central administration, playfields, and both surface and
underground parking. A joint use agreement is proposed with the County of
Los Angeles to share playfields, basketball courts, and other facilities.
. On-Site Support of OAR with daily responsibilities including
management of project site office staff
. Daily reporting, weekly progress meetings with General Contractor and
project team, distributing meeting minutes, and provide job site
computer network support
. Directly in charge of Time & Material construction directives.
Performed the accounting role by verifying contractor's submitted
change order proposal for compliance with the project's General
Conditions.
. Quality Check invoice to be in compliance with LAUSD's submittal
requirements
. In charge of procuring and processing the projects as-built drawings
from the architect of record to the LAUSD. Obtained approval and
acceptance
. Confirm contractor's maintenance of record drawings prior to monthly
progress payments to the Contractor
. Coordinate end user deliveries such as furniture and office equipment
. Coordinate underground utility infrastructure such as Sewer, Storm
Drain, Electrical, Gas, Domestic Water & Fire Water.
. Perform the job duties of the OAR in their absence
. Perform other duties as directed by upper management
Ramona Opportunity High School
231 S. Alma Avenue, Los Angeles, CA 90063
Project Engineer / Acting Authorized Owner Representative
This replacement school is built on a reconfigured site because the Metro
Transit Authority needed a portion of the existing school site to complete
their East Side Extension Project. The reconfigured site includes a
gymnasium, childcare center, kitchen, multi-purpose room, thirteen
classrooms, and a playfield and was constructed in three phases of
construction.
Review the architectural plans for conformance to the District's standards.
Review, draft, edit the standard specifications to include products not
contained within
Managed daily construction phase activities including interact with
contractor, A/E, IOR, DSA and school principal/end-user as well as outside
agencies, consultants, and vendors
Managed the schedule, budget, dispute/conflict resolution, change order
mitigations and negotiations, punch list administration, facility turn-
over, construction contract close-out, and in-service training. Assist with
value engineering before and during the project
Coordinated and oversaw the construction process with the MTA/Metro Gold
Line Team, General Contractor, Architect, Inspection Department, and the
Project Management Team to ensure the project is constructed as planned and
within budget and schedule
Managed the coordination of the underground utility infrastructure such as
Sewer, Storm Drain, Electrical, Gas, Domestic Water & Fire Water.
Attend construction meetings as the District's representative
Confer with Sr. Management weekly to discuss project status and budgets
Managed the interface with the City of LA & LA County and coordinated
efforts between the two entities
Coordinated with end user for delivery of furniture and office equipment
Directed the project team with achievable goals in support of LAUSD's
processing requirements
Provided technical and engineering support to PM/CM
Assist in DSA project closeout
Los Angeles Unified School District Island Elementary School
500 N. Island Avenue, Wilmington, CA 90744
Project Engineer
This project is a two-building elementary school consisting of one two-
story classroom building with a subterranean parking garage and a one-story
multi-purpose building
On-Site Support of OAR with daily responsibilities including management of
project site office staff
Daily reporting, weekly progress meetings with General Contractor and
project team, distributing meeting minutes, and provide job site computer
network support
Performed the accounting role by processing the contractor's invoice and
was responsible for verification of approximately $20,000,000 worth of time
and material invoices as submitted by General Contractor
QC invoice to be in compliance with LAUSD's submittal requirements
In charge of procuring and processing the projects as-built drawings from
the architect of record to the LAUSD. Obtained approval and acceptance
Confirm contractor's maintenance of record drawings prior to monthly
progress payments to the Contractor
Perform the job duties of the OAR in their absence
Perform other duties as directed by the OAR
Owen Design Group, June 2001 - October 2005
20 Morgan, Irvine, CA 92633, Contact: Michael Chegini 949-***-****
Project Manager / Construction Manager
ADA projects in support of LAUSD's Technical Support:
Performed the services related to access compliance for over 15 LAUSD
campuses
Performed onsite quality assurance evaluations of projects, report results,
define a scope of work for corrective action projects, and managed the
projects to ensure full compliance
The projects primarily focused on bringing the schools into compliance by
providing code required paths of travel and clearances for disabled
students, staff, and visitors using the following Guidelines: the Americans
with Disabilities Act (ADA) regulations, Title 24 (California Building
Standards Code), DSA California Access Compliance Reference Manual, and the
Rehabilitation Act section 504
K-12 Florence Elementary School - Playfield / Parking Structure
7211 Bell Avenue, Los Angeles, CA 90001
K-12 Miles Elementary School - Playfield / Parking Structure
6720 Miles Avenue, Huntington Park, CA 90255
K-12 Pacoima Elementary School - Playfield / Parking Structure
11016 Norris Avenue, Pacoima, CA 91331
K-12 San Miguel Elementary School - Playfield / Parking Structure
9801 San Miguel Avenue, South Gate, CA 90280
These projects are semi-subterranean and full subterranean parking garages
with a fully functional, fenced and handicapped-accessible playground
surface located on the top deck; The parking structures provided over 220
parking stalls while providing an additional 71,500 S.F of play area for
the students
Project manager for the design and approval phase of the project
Responsible for all sub consultant specification and drawing coordination
Process submittal of project documents and drawings to DSA
Process deferred approval items to DSA for approval
Obtain DSA approval for project documents
Construction manager for the construction phase of the project
Process all submittals, deferred approvals, and process & coordinate
request for clarification to sub consultants and back to LAUSD
On and off-site support of District's PM/CM Program
In charge of procuring and processing the projects as-built drawings to the
LAUSD vault department and obtained approval and acceptance
Post Tension Design, November 1999 - March 2001
1202 Monte Vista Ave., #2, Upland, CA 91786, Contact: Clark Crump
These projects are foundation design projects for multiple home projects
all over southern California
Senior CAD Draftsman for Structural Post-Tensioned Foundation Plans
Provided local area network administration
Procure, setup and create an office network; Install related software
Set up and install printers and plotters
Trouble shoot various types computer software issues with MS Word, Excel,
Outlook, and remote access
Walker Parking Consultants, Newport Beach, CA - August 1997 - November 1999
4700 Von Karman Avenue, Newport Beach, CA 92633 (Office Closed), Contact:
Rise` Landeros 269-***-****
Senior CAD Draftsman for a Prime consultant providing on public and private
projects; Disneyland added a 10,242 six story structure; San Diego State
University semi subterranean parking garage, stadium with playfield and
running track on the top deck; University California San Diego, 2500 car 3
story above ground parking structure
Assist with drawing coordination between sub consultants
Assist with preparing progress submittals to the owner
Assist with preparing submittals to Local authorities for approval
For university projects, assist with preparing submittals to DSA
Provided local area network administration
Set up and install printers and plotters
Trouble shoot various types computer software issues with MS word, Excel,
Outlook, Power Point, and remote access
AMTREX Logistics, May 1995 - August 1997
5000 Birch, Newport Beach, CA 92660, Contact: Brian Scott 949-***-****
Operations Coordinator
Responsibilities required a working knowledge of modes of transportation -
LTL, TL, Intermodal, Rail, and Air types of transportation
Consolidation and Distribution - Provide reports to client base as to where
they are at all times and proactive notification to client prior to
delivery
Performed service of Office Network Administrator - Windows95, Windows NT
and related MS-Office Software
Setup and trouble shoot PC and network printing issues
Hallmark Marketing Corporation, January 1994 - April 1995
10 Corporate Park, Irvine, CA 92606, Contact: Cliff Vyematsu 949-***-****
These projects are Hallmark store modernization projects
Assist with preparing Floor Plans, Merchandise Plans, Reflected Ceiling
Plans, and Electrical Plans
Store Front Elevations and Perspective CAD drawings
Assist with preparing submittals to Local authorities for approval
Trouble shoot various types computer software issues with MS word, Excel,
Outlook, Power Point, and remote access
Peak Technical Services, January 1993 - January 1994
7 Corporate Park, Irvine, CA 92606, Contact: John Cane 949-***-****
Performed as a CAD Draftsman in a variety of different temporary projects
from Mechanical drafting to Architectural drafting
All CAD drafting from engineers redline drawings
End of Resume